HomeMy WebLinkAboutMINUTES - 03312015 - C.16RECOMMENDATION(S):
APPROVE and AUTHORIZE the Director of Airports, or designee, to execute an eighteen-month Consulting
Services Agreement with Kimley-Horn and Associates, Inc. to perform the design engineering for Taxiway Echo and
Kilo pavement improvements plus lighting and signage enhancements at the Buchanan Field Airport, Concord Area.
FISCAL IMPACT:
The total contract cost for the Taxiway Echo and Kilo Design Engineering services plus lighting and signage
enhancements is $132,417; of which 90% (or approximately $119,175) will be funded through a Federal Aviation
Administration (FAA) grant, 2.25% (or approximately $5,959) will be funded by a Caltrans grant, and the remaining
7.75% (or approximately $7,283) will be funded by the Airport Enterprise Fund.
BACKGROUND:
In 2012 Contra Costa County (County) issued a Request for Statement of Qualifications (SOQ) for engineering,
planning and environmental firms to assist the Airports Division with anticipated projects for a three-year period. The
County interviewed and ranked the consultants that responded to the SOQ.
Taxiways
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 03/31/2015 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
ABSENT:John Gioia, District I
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Beth Lee, (925) 681-4200
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: March 31, 2015
David Twa, County Administrator and Clerk of the Board of Supervisors
By: Stacey M. Boyd, Deputy
cc:
C. 16
To:Board of Supervisors
From:Keith Freitas, Airports Director
Date:March 31, 2015
Contra
Costa
County
Subject:Authorize to execute a CSA w/Kimley-Horn & Assoc., Inc. for Design Engineering of Taxiway Echo & Kilo &
Related Enhancements; Buchanan Field Airport
BACKGROUND: (CONT'D)
Echo and Kilo at Buchanan Field Airport requires rehabilitation to improve the deteriorating pavement conditions.
Due to the project cost ($132,417) and the eligibility to receive FAA grant reimbursement for the design
engineering work, County staff sent a project specific technical services solicitation to the top three ranked CSA
consultants in order to determine the most qualified firm to perform the Taxiway Echo and Kilo design
engineering services. Public Works and Airports Division staff reviewed the three proposals and determined
unanimously that Kimley-Horn and Associates was the preferred consultant for this work.
The Airports Division is now requesting to execute an eighteen-month consulting service agreement contract
(April 1, 2015 through September 30, 2016) with Kimley-Horn and Associates to perform design engineering
services for the Taxiways Echo and Kilo pavement plus signage and lighting enhancements project. The total cost
of the design engineering service is $132,417 which will be funded by a Federal Aviation Administration grant
(90%), a Caltrans grant (2.25%), and the Airport Enterprise Fund (7.75%).
CONSEQUENCE OF NEGATIVE ACTION:
If the Airports Division is unable to execute a contract with Kimley-Horn and Associates for the Taxiway Echo
and Kilo pavement and related improvements, the taxiways will continue to deteriorate which could impact the
long-term ability to use these taxiways.
CHILDREN'S IMPACT STATEMENT:
Not Applicable.
ATTACHMENTS
Consulting Service Agreement Kimley-Horne