Loading...
HomeMy WebLinkAboutMINUTES - 11041986 - 1.26 1-'V�a� POSITION ADJUSTMENT REQUEST No. 114 1 REC_i'Fty Date: 10/2/86 Dept. No./ 4547 Copers Department PUBLIC WORKS Budget Uft N�. No. 4539 Agency No. Action Requested: Classify two (2) Engineering Technician-Entry Level positions Proposed Effective Date: . ASAP Explain why adjustment- is needed: To properly staff the Public Works Department's Design and Road Maintenance Administration Divisions see attached memorandum) Classification Questionnaire attached: Yes [] No Q . Estimated cost of adjustment: $ 25,088 Cost is within department's budget: Yes Q No F] Eight months - 11/86 to 06/8 If not within budget, use reverse side to explain how costs are to b funded. s.— Department must initiate necessary appropriation adjus t. Use additional sheets for further explanations or commen or Departm n Head Personnel Department Recommendation Date: Oct ber Classify two (2) Engineering Techincian (NSTF) Entry level positions at salary level XA-1239 ($1568-2124). Amend Resolution 71/17 establishing positions and resolutions allocating classes to the Basic/Exempt Salaroy Schedule, as described above. Effective: k1lay following Board action. 0 Date mor Director of PertZnnel County Administrator Recommendation / Date: tv Approve Recommendation of Director of Personnel D Disapprove Recommendation of Director of Personnel 0 Other: 4rpCount Administrator Board of Supervisors Action NOV 4 1986 Phil Batchelor, Clerk of the Board of Adjustment APPROVED/mon i' Supervisorsa:jdCourtyAdministraior NOV 4 1986 Date: _ By: APPROVAL OF THIS ADJUSTMENT CONSTITUTES A PERSONNEL/SALARY RESOLUTION AMENDMENT. M347 6/82 1q12- L/ Contra Costa Count% RF^EIVED OCT 7 - 1986 PUBLIC WORKS DEPARTMENT Office of CONTRA COSTA COUNTY County Administrator DATE: October 2, 1986 TO: Richard Heyne, Chief General Government Division FROM: Donald P. Freitas, Administrative Services Assistant III SUBJECT: P-300 - Create to Engineering Positions The attached P-300 seeks to create two additional Engineering Technician- Entry Level positions for the Public Work Department. Currently, the Department has 44 filled permanent positions with no vacancies. We have had discussions with Mr. John Gregory of the County Administrator' s Office and he seems favorable to our request. He requested additional information be provided. The attached chart indicates the distribution of Engineering Technicians by division identifying their gender and ethnic origin. The new positions would be assigned to the Design and the Road Maintenance Divisions. The position in the Design Division is needed to meet the work demands caused by the increased workload for the preparation of contract plans and specifications for installation of infrastructure in newly created drainage and road fee areas. Responsibilities will include minor engineering calculations, preparation of cost estimates, sketches, minor drafting , plotting of photography and cross sections , and . other : miscellaneous duties associated with assisting an engineer. This position will absorb most of the subprofessional tasks in the division and eliminate the need to allocate an additional engineering position .to the division, thereby providing overall cost savings. Funding of this position would be provided by Road and Drainage funds allocated to the various projects being designed. The Road Maintenance Division position is needed for several ongoing projects that require a continuity of work effort which the Department is unable to provide at current staffing levels. Responsibilities of this position include researching files; preparing and maintaining the history and maintenance records for preparation and responses to complaints and litigations; developing and maintaining a work history for the pavement management system and litigation; investigation and preparation of response to encroachment complaints; and , providing assistance to .construction inspectors on maintenance related projects. In the past, these tasks have been performed by Road Maintenance personnel assigned to limited duty. During the past .several months, there have been no personnel on limited duty and -a. tremendous backlog of work has resulted. Staffing by limited duty assignment is unpredictable and sporadic. We , need continuity within the Road Maintenance Department. especially in the area of litigation. This position would be funded totally by gas tax revenue. We just recently interviewed and filled two existing Engineering Technician- i . 2 Entry Level vacancies. A black male and a white female were appointed to these positions. We would anticipate that with the creation of these new positions we would be able to appoint at least one additional protected representative. Your prompt attention to our request is appreciated and should you have any questions regarding this matter, please contact me at Ext. 4470. Should you have any questions, please contact me at extension 4470. DPF:md engtec.tl0 Enclosure cc: (w/encl .*) C. Hansen, Admin. Services K. Dussell , Admin. Services Payroll* County Administrator' s Office Attn: John Gregory DISTRIBUTION OF ENGINEERING TECHNICIANS IN THE PUBLIC WORKS DEPARTMENT Design Traffic Flood Control Survey M&T Lab M F M F M F M F M F White 0 0 3 0 1 2 7 1 6 1 Black 1 0 1 0 1 0 0 0 0 0 Hispanic 0 0 0 0 0 0 0 0 0 0 Asian 1 0 0 0 0 0 0 0 0 0 Total 2 0 4 0 2 2 7 1 6 1 Maint. Eng. Svcs. Const. Rd. Eng. Total M F M F M F M F M F Total White 0 2 2 1 8 0 2 1 29 8 37 Black 0 0 1 0 0 0 0 0 4 0 4 Hispanic 0 0 0 0 2 0 0 0 2 0 2 Asian 0 0 0 1 0 0 0 0 0 1 1 Total 0 2 3 2 10 0 2 1 35 9 44 ethtable.tl0