HomeMy WebLinkAboutMINUTES - 03032015 - D.9RECOMMENDATION(S):
Accept the Industrial Safety Ordinance Annual Report submitted by Health Services Department.
FISCAL IMPACT:
No fiscal impact.
BACKGROUND:
Chapter 450-8 of the County Ordinance Code known as the Industrial Safety Ordinance Risk Management Chapter
requires Health Services to submit annual reports to the Board of Supervisors. The ordinance outlines what is to be
included in this report. Attached is a copy of this report.
CONSEQUENCE OF NEGATIVE ACTION:
If this Board Order is not approved, no report would be available for the public that summarizes 2014 Industrial
Safety Ordinance activities.
CHILDREN'S IMPACT STATEMENT:
Not applicable.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 03/03/2015 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
ABSENT:Federal D. Glover, District V
Supervisor
Contact: Cho Nai Cheung, 335-3212
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: March 3, 2015
David Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc: Tasha Scott, C Rucker, R Sawyer, Cho Nai Cheung
D. 9
To:Board of Supervisors
From:William Walker, M.D., Health Services Director
Date:March 3, 2015
Contra
Costa
County
Subject:Annual Industrial Safety Ordinance Report
ATTACHMENTS
Report
Board Presentation
Industrial Safety
Ordinance
Annual Report to
the Board
Cho Nai Cheung
Accidental Release Prevention Engineer
Supervisor
Randall L. Sawyer
Chief Hazardous Materials Programs
and Environmental Health Officer
March 3, 2015
Presentation Discussion Points
Written report contains all of the
information required by the Industrial
Safety Ordinance (ISO)
Accident history review
No Major Chemical Accidents or Releases
in 2014
Public Participation
Updates to ISO, CalARP, PSM
Work with other Agencies
March 3, 20152
ISO Written Report
Discussion of the Effectiveness of Health
Services Program Implementation, Including
the following:
Effectiveness of the Procedures for Records
Management
Number and Type of Audits and Inspections Conducted
Number of Root Cause Analyses and/or Incident
Investigations Conducted by Health Services
Health Services Process for Public Participation
Effectiveness of the Public Information Bank
Effectiveness of the Hazardous Materials Ombudsman
Other Required Program Elements as necessary
March 3, 20153
ISO Written Report
Requires the Following Regulated Sources’
Information:
The Status of the Regulated Stationary Sources’ Safety
Plans and Programs
Locations of the Regulated Stationary Sources Safety
Plans
Annual Submission of Accident History Report and
Inherently Safer Systems Implemented
Status of the Incident Investigation, Including the Root
Cause Analyses Conducted by the Regulated Stationary
Sources
Major Chemical Accidents and Releases
Legal Enforcement Actions Initiated by Health Services
March 3, 20154
Major Chemical Accident or
Release Definition
March 3, 20155
Major Chemical Accident or Release means an incident that meets the
definition of a Level 3 or Level 2 Incident in the Community Warning
System incident level classification system defined in the Hazardous
Materials Incident Notification Policy, as determined by the Department;
or results in the release of a Regulated Substance and meets one or more
of the following criteria:
(1) results in one or more fatalities;
(2) results in greater than 24 hours of hospital treatment of three or more
persons;
(3) causes on and/or off-site property damage (including clean-up and
restoration activities) initially estimated at $500,000 or more. On-site
estimates shall be performed by the Stationary Source. Off-site estimates shall
be performed by appropriate agencies and compiled by the Department.;
(4) results in a vapor cloud of flammables and/or combustibles that is more
than 5000 pounds.
Severity Levels
Severity Type I –A release where there was no or
minor injuries, the release had no or slight impact to
the community, or there was no or minor onsite
damage
Severity Type II –An impact to the community
occurred, or if the situation was slightly different the
accident may have been considered major, or there
is a recurring type of incident at that facility
Severity Type III –A fatality, serious injuries, or
major onsite and/or offsite damage occurred
March 3, 20156
Major Chemical Accidents or
Releases Severity Type III (1990s – now)
March 3, 20157
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
All facility 1 1 1 1 2 1 0 2 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0
County & Richmond ISO 0 1 1 1 2 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
Accident History
March 3, 20158
0
2
4
6
8
10
12
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014Number of MCAR'sYear
Major Chemical Accidents and Releases
Total MCARs
Severity Level III
Severity Level II
Severity Level I
Accident History
A weighted score is developed to look at the overall
process safety of all facilities in the County, the
facilities that are covered by the County and the City of
Richmond Industrial Safety Ordinances, and the
facilities that are covered by the County’s Industrial
Safety Ordinance. Using the following weighting:
Severity Type III - 9 points
Severity Type II - 3 points
Severity Type I - 1 point
March 3, 20159
Accident History
March 3, 201510
0
5
10
15
20
25
30
Major Chemical Accidents and Releases Weighted Score
Total MCARs
County & Richmond ISO
County ISO
Accident History
March 3, 201511
No Major Chemical Accidents or Releases
in 2014
Audits Performed
Air Liquide Large Industries—June 2013
Chemtrade Bay Point Works—August 2013
Chevron Richmond Refinery—October 2013
Tesoro Golden Eagle Refinery—January 2014
Phillips-66—May 2014
Chemtrade Richmond Works—September 2014
Public Participation
Information Sharing at existing venues
Air Products’ and Shell Martinez Refinery’s Audit Findings: Martinez, Earth
Day, April 20, 2013 and April 26, 2014
Phillips 66 Refinery’s Safety Plan and Audit Findings and Air Liquide Large
Industries’ Safety Plan: Sugartown Festival & Street Fair in Crockett on July
21, 2013 and Rodeo-Hercules Fire District Open House on October 5, 2013
Chevron Refinery Safety Plan and the General Chemical Richmond Audit
Findings: West County Emergency Preparedness Fair at San Pablo Towne
Center, October 5, 2013
Information Sharing with Community
Phillip 66 Refinery’s Community Advisory Panels (CAP) January 2013
Information on Web
Most recent audit findings summarized in easy to read format in both
English and Spanish
March 3, 201512
Updates to ISO/RISO (2014)
In response to U.S. Chemical Safety and
Hazard Investigation Board 2012
recommendations:
Requires regulated sources to submit “common”
process safety performance indicators and develop
additional process safety performance indicators,
Expands Inherently Safer System Analysis:
all the existing processes,
management of change when there is a major change,
incident investigation for an Major Chemical Accident or
Release
March 3, 201513
Updates to ISO/RISO (2014)
Requires the regulated sources to perform a safeguard
protection analysis to determine the effectiveness of
safeguards that are used during a process hazard
analysis, and
Revision of the goals of the ordinance that the purpose
of the ordinance is to prevent accidents from occurring
to the greatest extent feasible.
March 3, 201514
Updates to CalARP (2015)
General Requirements:
Changes to the Public Notice Process
Removed initial public notice requirement
Formal public review can be published on AA’s website
Hazard Assessment:
Alternative Release Scenario should reach a public receptor
Scenarios can be taken from industry experience
Document the review of the Hazard Assessment
All endpoints for Table 3 chemicals are now established
Program 2 Hazard Review (HR):
Revalidation can only occur once between full HRs
March 3, 201515
Updates to CalARP (2015)
Program 2 & 3 Recommendation closure timing :
Retain all PHA/HR Recommendation resolution documentation for
the life of the process
Coordinate a timetable with the AA
Next planned turnaround – for items that require a turnaround
HR/PHA: 2 ½ years after performing the HR/PHA
Compliance Audit: 1 ½ years after performing the audit
Incident Investigation: 1 ½ years after completing the
investigation or 2 years after the incident
March 3, 201516
Updates to CalARP (2015)
Program 2 Maintenance:
Clarification that the maintenance program must be written
Owner must ensure that contractors are trained on task
Program 3 Process Safety Information (PSI):
Ensure PSI is maintained and kept up-to-date
In addition to reactivity data, document chemical compatibility
data during handling, use, and application
Program 3 Operating Procedures:
Reflect current practices, update whenever inadequate/inaccurate
March 3, 201517
Updates to CalARP (2015)
Program 3 Mechanical Integrity (MI):
Added compressors and their drivers to equipment in MI Program
Clarification that ancillary components (e.g., valves)are in the MI
Program
Program 3 Contractors:
Must document the evaluation of contractors
Program 3 Management of Change (MOC):
Clarified required for new operating/maintenance procedures
Mechanical Integrity Procedure must be developed prior to start-up
Program 3 Pre-Startup Safety Review (PSSR):
Clarified that the PSSR is to be used as a verification check
(independent of the MOC)
March 3, 201518
Work with other agencies
Participate in Inspections with Federal EPA
and CalOSHA
Attended Federal EPA and CalOSHA
Training
Work with City of Richmond
Participates in meetings regarding
regulation revisions to California Accident
Release Prevention Program, CalOSHA
Process Safety Management(PSM)
March 3, 201519
2016 CalARP Regulations
CalARP Regulations for Petroleum Refineries
Elements of ISO incorporating into State Law
Hierarchy of Control Analysis (Inherent Safety)
Root Cause Analysis
Management Systems
Process Safety Performance Indicators
Safeguard Protection Analysis
Process Safety Culture Assessments
Damage Mechanism Reviews
March 3, 201520
Hazardous Materials Programs:
Safeguarding Our Communities Safeguarding Our Communities
Implementing the Industrial Safety Ordinance Implementing the Industrial Safety Ordinance
Responding to EmergenciesResponding to Emergencies
March 3, 201521
ANNUAL PERFORMANCE
REVIEW & EVALUATION
INDUSTRIAL SAFETY ORDINANCE
December 9, 2014
2
Table of Contents
Executive Summary .........................................................................................................................................................3
Public Participation ............................................................................................................................................3
Audits.....................................................................................................................................................................4
Major Chemical Accidents or Releases .........................................................................................................4
Conclusion ............................................................................................................................................................4
Introduction .......................................................................................................................................................................6
Annual Performance Review and Evaluation Report .................................................................................7
Effectiveness of Contra Costa Hazardous Materials Programs’ Implementation of the Industrial Safety
Ordinance .......................................................................................................................................................................8
Effectiveness of the Procedures for Records Management ....................................................................9
Number and Type of Audits and Inspections Conducted .........................................................................9
Number of Root Cause Analyses and/or Incident Investigations Conducted by Hazardous .............
Materials Program ............................................................................................................................................10
Hazardous Materials Programs’ Process for Public Participation ........................................................10
Effectiveness of the Public Information Bank ...........................................................................................11
Effectiveness of the Hazardous Materials Ombudsperson ....................................................................13
Other Required Program Elements Necessary to Implement and Manage the Industrial Safety ....
Ordinance ...........................................................................................................................................................13
Regulated Stationary Sources Listing ........................................................................................................................13
The Status of the Regulated Stationary Sources’ Safety Plans and Programs ..................................13
Locations of the Regulated Stationary Sources Safety Plans ................................................................13
Annual Accident History Report and Inherently Safer Systems Implemented as Submitted by the
Regulated Stationary Sources ........................................................................................................................14
Status of the Incident Investigations, Including the Root Cause Analyses Conducted by the ..........
Regulated Stationary Sources ........................................................................................................................16
Major Chemical Accidents or Releases .......................................................................................................16
Legal Enforcement Actions Initiated by Contra Costa Hazardous Materials Programs ..................18
Penalties Assessed as a Result of Enforcement ......................................................................................................18
Total Fees, Service Charges and Other Assessments Collected Specifically for the Industrial Safety
Ordinance .....................................................................................................................................................................19
Total Personnel and Personnel Years Used by Hazardous Materials Program to Implement the Industrial
Safety Ordinance ............................................................................................................................................................19
Comments from Interested Parties Regarding the Effectiveness of the Industrial Safety Ordinance ......19
The Impact of the Industrial Safety Ordinance on Improving Industrial Safety .............................................20
City of Richmond Industrial Safety Ordinance .......................................................................................................21
3
Executive Summary
On December 15, 1998, the Contra Costa County
Board of Supervisors adopted a landmark Industrial
Safety Ordinance requiring regulated facilities in the
County to implement a multitude of safety programs
aimed to prevent chemical accidents that could have
detrimental impacts to the surrounding communities.
The requirements of the Industrial Safety Ordinance
(ISO) are some of the most stringent in the United
States, if not the world. Additionally, the Industrial Safety
Ordinance is mandated to include participation from
all stakeholders, including industries, agencies, elected
officials and the public at large.
The ISO now covers seven stationary sources in Contra
Costa County, including several oil refineries. The
ordinance is administered by Contra Costa Hazardous
Materials Programs (CCHMP), a division of Contra Costa
Health Services, the county health department. CCHMP also administers the City of Richmond’s
Industrial Safety Ordinance (RISO), which covers the Chevron Refinery and Chemtrade Richmond
Works. RISO activities are covered in more detail later in this report.
As part of the ISO’s requirements, CCHMP produces and a regular performance review and
evaluation report and submits it to the Board of Supervisors.
Over a 15-year period, there has been a trend of fewer and less severe Major Chemical Accidents
or Releases (MCAR) incidents in the County since the adoption of the Ordinance and no MCAR
incidents at an Industrial Safety Ordinance facility this year. There were several Community Warning
System (CWS) Level II and CWS Level III incidents in 2012 and, to a lesser extent, in 2010 that caused
some concern. However, CCHMP believes that this is not directly reflective of the effectiveness of
the Industrial Safety Ordinance requirements, but serves as a reminder that we all have to stay
vigilant in ensuring safe facility operations and that implementation of mature prevention programs
are challenging.
The Accidental Release Prevention Program engineers in CCHMP have oversight of the ISO and are
continuing to explore ways to improve the overall implementation of the ISO and the prevention
program elements. CCHMP staff continues to work with other agencies such as the U.S. Environmental
Protection Agency, the California Occupational Safety and Health Administration and other local
program agencies for sharing of regulatory interpretations and inspection results. CCHMP staff also
cooperated with the U.S. Chemical Safety and Hazard Investigation Board’s (CSB) investigation of the
No. 4 Crude Unit fire at Chevron that occurred August 6, 2012. The Board of Supervisors has adopted
amendments to the ISO as recommended by CSB. CCHMP is also working closely with Department
of Industrial Relations and California Environmental Protection Agency to implement the revised
regulations for the California Accidental Release Prevention Program, which will further improve safety
programs at all California petroleum refineries.
4
Public Participation
Contra Costa Hazardous Materials Programs has an established public outreach process and is
continually looking at ways to improve. The following community-engagement efforts took place this
year on behalf of the county ISO and Richmond ISO:
• Public outreach information booths at existing venues
–Air Products’ and Shell Martinez Refinery’s Safety Audits were shared at the John Muir
Birthday/Earth Day celebration at the John Muir National Historic Site in Martinez on
April 20, 2013
–Phillips 66 Refinery’s Safety Plan and Audit and Air Liquide Large Industries’ Safety Plan
were shared at the Sugartown Festival & Street Fair in Crockett on July 21, 2013 and
also at the Rodeo-Hercules Fire District Open House on October 5, 2013
–West County Emergency Preparedness Fair at San Pablo Towne Center Parking Lot on
Saturday, October 5, 2013, from 10 a.m. to 2 p.m. for the review of the Chevron Refinery
Safety Plan and the General Chemical Richmond Audit Findings.
• Presentations to Interested Groups
–Phillips 66’s audit results and general ISO information to Phillips 66’s Community
Advisory Panels members in January 2013.
• Attend public meetings after major incidents:
–There were no major incidents during this reporting period
• Most recent audit findings summarized in an easily read format in English and Spanish
• Information on regulated businesses in an easily read format in English and Spanish
• Industrial Safety Ordinance Information Sheet in English and Spanish
The Board of Supervisors also requested that staff provides copies of the Annual Report to
communities through the Community Advisory Panels (CAP). CCHMP provided copies of the 2010,
2011 and 2012 ISO Annual Reports to CAP representatives for distribution for Phillips 66, General
Chemical Bay Point Works, General Chemical Richmond, Shell Martinez Refinery and Tesoro
Golden Eagle Refinery. This 2014 Annual Report is available on our website and will be sent to CAP
representatives for distribution.
Audits
Audits of the regulated businesses are required at least once every three years to ensure that the
facilities have the required programs in place and are implementing the programs. We completed
four County ISO and two Richmond ISO audits since the last annual report:
• Air Liquide—June 2013
• Chemtrade Bay Point Works—August 2013
• Chevron Richmond Refinery—October 2013
• Tesoro Golden Eagle Refinery—January 2014
• Phillips-66—May 2014
• Chemtrade Richmond Works—September 2014
Major Chemical Accidents or Releases
There have been no Major Chemical Accidents or Releases (MCAR) for the County Industrial Safety
Ordinance facilities in this reporting period.
5
Conclusion
The severity of the Major Chemical Accidents or Releases in Contra Costa County have been
in a general declining trend since the implementation of Industrial Safety Ordinance with a few
exceptions in 2010 and 2012. The implementation of the Industrial Safety Ordinance has improved
safety programs and operations at the facilities that are regulated. Additionally, CCHMP has sought
assistance from stakeholders, including the regulated facilities, workers and community members and
included additional measures as recommended by the U.S. Chemical Safety and Hazard Investigation
Board that will further reduce likelihood of chemical accidents at these industrial facilities.
Introduction
1The Contra Costa County Board of Supervisors passed the Industrial Safety Ordinance due to
accidents that occurred at oil refineries and chemical plants in Contra Costa County. The effective
date of the Industrial Safety Ordinance was January 15, 1999. The ordinance applies to oil refineries
and chemical plants with specified North American Industry Classification System (NAICS) codes
that were required to submit a Risk Management Plan to the U.S. EPA and are program level 3
stationary sources as defined by the California Accidental Release Prevention (CalARP) Program.
The ordinance specifies the following:
• Stationary sources had one year to submit a Safety Plan to Contra Costa Hazardous Materials
Programs stating how the stationary source is complying with the ordinance, except the Human
Factors portion (completed January 15, 2000)
• Contra Costa Hazardous Materials Programs develop a Human Factors Guidance Document
(completed January 15, 2000)
1
6
• Stationary sources had one year to comply with the requirements of the Human Factor
Guidance Document that was developed by Contra Costa Hazardous Materials Programs
(completed January 15, 2001)
• For Major Chemical Accidents or Releases, the stationary sources are required to perform
a root cause analysis as part of their incident investigations (ongoing)
• Contra Costa Hazardous Materials Programs may perform its own incident investigation,
including a root cause analysis (ongoing)
• All of the processes at the stationary source are covered as program level 3 processes as
defined by the California Accidental Release Prevention Program
• The stationary sources are required to consider Inherently Safer Systems for new
processes or facilities or for mitigations resulting from a process hazard analysis
• Contra Costa Hazardous Materials Programs will review all of the submitted Safety Plans and audit/
inspect all of the stationary sources’ Safety Programs within one year of the receipt of the Safety Plan
(completed January 15, 2001) and every three years after the initial audit/inspection (ongoing)
• Contra Costa Hazardous Materials Programs will give an annual performance review and
evaluation report to the County Board of Supervisors
The 2006 amendments to the Industrial Safety Ordinance require or expand the following:
1. Expand the Human Factors Program to include Maintenance
2. Expand the Management of Organizational Change to include Maintenance and all of
Health and Safety positions
3. Require the stationary sources to perform Safety Culture Assessments one year after
the Hazardous Materials Programs develop guidance on performing a Safety Culture
Assessment (November 2009)
4. Perform Security Vulnerability Analysis
The seven stationary sources now covered by the county’s Industrial Safety Ordinance are:
1. Air Products at the Shell Martinez Refining Company
2. Air Products at the Tesoro Golden Eagle Refinery
3. Shell Martinez Refining Company
4. Chemtrade West in Bay Point
5. Phillips 66 Rodeo Refinery
6. Tesoro Golden Eagle Refinery
7. Air Liquide Rodeo Hydrogen Plant
The Board of Supervisors approved an amendment to the Industrial Safety Ordinance in June
2014 to address recommendations by CSB set forth in the Chevron refinery fire interim investigation
report (August 2012) which broadens the goals of the regulation by requiring the following:
1. Use of process safety performance indicators in the evaluation of the performance of
process safety systems and to provide required contents in the annual performance review
and evaluation report that is provided to the board of supervisors
2. Expand the implementation of inherently safer systems to be implemented to the greatest
extent feasible and as soon as administratively practicable. Stationary source is now
required to evaluate and document inherently safer system analysis :
7
a. Every five years for existing covered processes,
b. In the development and analysis of recommended action items identified in a process
hazard analysis,
c. As part of a management of change review, whenever a major change is proposed at a
facility that could reasonably result in a major chemical accident or release,
d. When an incident investigation report recommends a major change that could reasonably
result in a major chemical accident or release,
e. When a root cause analysis report recommends a major change that could reasonably
result in a major chemical accident or release, and
f. During the design of new processes, process units and facilities.
3. Conduct, document and complete a safeguard protection analysis for all processes by June 30,
2019, and every five years thereafter.
The Air Liquide Rodeo Hydrogen Plant began operation in July 2009 and is located adjacent to the
Phillips 66 Rodeo Refinery. The facility produces purified hydrogen for Phillips 66 Refinery and other
industrial customers, and also produces steam and electricity for the Phillips 66 Refinery.
Contra Costa Hazardous Materials Programs completed and issued the first Contra Costa County
Safety Program Guidance Document on January 15, 2000. The stationary sources were required to
comply with the Human Factors section of this guidance document by January 15, 2001. Hazardous
Materials Programs staff has worked with the stationary sources to develop a Safety Culture
Assessment Guidance Document, which was finalized and issued November 10, 2009. Staff began
reviewing these Safety Culture Assessments in December 2010. Additionally, staff issued a revised
Safety Program Guidance Document to reflect the ISO amendments, and clarifications based on the
audit findings in July 2011.
Contra Costa Hazardous Materials Programs reviewed all submitted Safety Plans and started
the sixth round of audits of the stationary sources during this report period, as required by the
ordinance. In addition, Contra Costa Hazardous Materials Programs performed a specialized audit
for all the stationary sources for their Human Factors programs and for Inherently Safer Systems in
2002. The status of the reviews and all audits are discussed in Table I within the report.
Annual Performance Review and Evaluation Report
The Industrial Safety Ordinance specifies that the contents of the annual performance review and
evaluation report contain the following:
• A brief description of how CCHMP is meeting the requirements of the ordinance as follows:
–The program’s effectiveness in getting regulated businesses to comply with the ordinance
–Effectiveness of the procedures for records management
–Number and type of audits and inspections conducted by Hazardous Materials Programs as
required by the ordinance
–Number of root cause analyses and/or incident investigations conducted by Hazardous
Materials Programs
–Hazardous Materials Programs’ process for public participation
–Effectiveness of the Public Information Bank
8
–Effectiveness of the Hazardous Materials Ombudsperson
–Other required program elements necessary to implement and manage the ordinance
• A listing of stationary sources covered by the ordinance, including for each:
–The status of the stationary source’s Safety Plan and Program
–A summary of the stationary source’s Safety Plan updates and a listing of where the
Safety Plans are publicly available
–The annual accident history report submitted by the regulated stationary sources and
required by the ordinance
–A summary, including the status, of any root cause analyses and incident investigations
conducted or being conducted by the stationary sources and required by the ordinance,
including the status of implementation of recommendations
–A summary, including the status, of any audits,
inspections, root cause analyses and/or incident
investigations conducted by Hazardous Materials
Programs, including the status for implementing
the recommendations
–Description of Inherently Safer Systems
implemented by the regulated stationary source
–Legal enforcement actions initiated by Hazardous
Materials Programs, including administrative, civil
and criminal actions
• Total penalties assessed as a result of enforcement
of the ordinance
• Total fees, service charges and other assessments
collected specifically for the support of the ordinance
• Total personnel and personnel years used by the
jurisdiction to directly implement or administer the
ordinance
• Comments that raise public safety issues from
interested parties regarding the effectiveness of the local program
• The impact of the ordinance in improving industrial safety
Effectiveness of Contra Costa Hazardous Materials Programs’ Implementation
of the Industrial Safety Ordinance
Contra Costa Hazardous Materials Programs has developed policies, procedures, protocols and
questionnaires to implement the California Accidental Release Prevention Program and the
Industrial Safety Ordinance. The policies, procedures, protocols and questionnaires for these
programs are listed below:
• Audits/Inspections Policy
• Conducting the Risk Management Plan/Safety Plan Completeness Review Protocol
• Risk Management Plan Completeness Review Questionnaires
• Safety Plan Completeness Review Questionnaires
• Conducting Audits/Inspections Protocol
• Safe Work Practices Questionnaires
9
• CalARP Program Audit Questionnaires
• Safety Program Audit Questionnaires
• Conducting Employee Interviews Protocol
• Employee Interview Questionnaires
• Public Participation Policy
• Dispute Resolution Policy
• Reclassification Policy
• Covered Process Modification Policy
• CalARP Internal Performance Audit Policy
• Conducting the Internal Performance Audit
• CalARP Internal Audit Performance Audit Submission
• Fee Policy
• Notification Policy
• Unannounced Inspection Policy
• Risk Management Plan Public Review Policy
Hazardous Materials Programs has developed the Contra Costa County CalARP Program Guidance
Document and the Contra Costa County Safety Program Guidance Document including the Safety
Culture Assessment. An updated Contra Costa County Safety Program Guidance Document, which
incorporated updates from the 2006 ISO amendments and additional clarifications from all the audits,
was issued July 22, 2011, to the regulated facilities. These documents give guidance to the stationary
sources for complying with the Industrial Safety Ordinance. The policies, procedures, protocols and
questionnaires are available through Hazardous Materials Programs. The guidance documents can be
downloaded through Health Services’ website:
http://www.cchealth.org/groups/hazmat/california_accidental_release_prevention_guidance_document.
php and http://www.cchealth.org/groups/hazmat/industrial_safety_ordinance_guidance.php
Effectiveness of the Procedures for Records Management
Hazardous Materials Program has set up hard copy and digital files for each stationary source. The
files include the following folders:
1. Annual status reports
2. Audits & Inspections
3. Communications
4. Completeness Review
5. Emergency Response
6. Incident Investigation
7. Trade Secret Information
Hard copy files for the stationary sources are kept in a central location. Digital copies of the files
are stored on the Hazardous Materials Programs network and are accessible to the Accidental
Release Prevention Programs Engineers, Supervisor and the Environmental Health and Hazardous
Materials Chief. Portable document format (PDF) versions of these files are also available at
the Hazardous Materials Programs office for public access and viewing. The Accidental Release
Prevention Program files contain regulations, policies, information from the U.S. EPA, the Governor’s
10
Office of Emergency Services, the U.S. Chemical Safety and Hazards Investigation Board, and other
information pertinent to the engineers. The risk management and safety plans received are kept at
the Hazardous Materials Programs office.
Number and Type of Audits and Inspections Conducted
The Hazardous Materials Programs staff was required to audit and inspect all seven stationary
sources regulated under the Industrial Safety Ordinance within one year after the initial submittal
of their Safety Plans. Hazardous Materials Programs reviewed all of the Safety Plans and audited/
inspected all of the stationary sources’ Safety Programs within that year (2000). Hazardous
Materials Programs performed focused audits of the stationary sources for their Human Factors
Programs (this was not included in the original audit/inspection since the stationary sources were
not required to have their Human Factors Program in place until January 2001) and Inherently
Safer Systems in 2001 and 2002. Additional focused audits were performed to look at how two
stationary sources would manage organizational change in case there was a strike and non-striking
personnel were used instead of the striking personnel (2002). Hazardous Materials Programs
completed the second round of audits for all of the Industrial Safety Ordinance stationary sources
in 2003 and 2004 and began a third round of audits in the autumn of 2005, which were completed
in the spring of 2007. The fourth round of audits was completed in August 2009. Air Liquide
submitted a Risk Management Plan and Safety Plan to Hazardous Materials Program in July 2009
and was audited for the first time in June 2010. CCHMP began the fifth round of audits of ISO
facilities in spring of 2011 and completed these audits in spring of 2012. CCHMP began the sixth
round of audits of ISO facilities in 2013 and will complete these audits in summer of 2015.
When Hazardous Materials Programs staff reviews a Safety Plan, a Notice of Deficiencies is
produced that documents what changes to a Safety Plan the stationary source is required to make
before the Safety Plan is determined to be complete. The stationary source has 60 to 90 days to
respond to the Notice of Deficiencies. When the stationary source has responded to this Notice of
Deficiencies, the Hazardous Materials Programs staff will review the response. Hazardous Materials
Programs will either determine that the Safety Plan is complete or will work with the stationary
source until the Safety Plan contains the required information for it to be considered complete.
When the Safety Plan is deemed complete, Hazardous Materials Programs will open a public
comment period on the Safety Plan and will make available the plan in a public meeting or venue.
The Hazardous Materials Programs staff will respond to all written comments in writing and, when
appropriate, use the comments in the audit/inspection of the regulated stationary sources.
The Hazardous Materials Programs staff will issue Preliminary Audit Findings after an audit/
inspection is complete. The stationary source will have 90 days to respond to these findings.
Hazardous Materials Programs will review the response from the stationary source on the
Preliminary Audit Findings. When the stationary source has developed an action plan to come into
compliance with the regulations, the Hazardous Materials Programs staff will issue the Preliminary
Audit Findings for public comment and will make available the findings in a public meeting or venue.
The Hazardous Materials Programs staff will consider any public comments that were received
during the public comment period and if appropriate will revise the Preliminary Audit Findings. When
this is complete, the Hazardous Materials Programs staff will issue the Final Audit Findings and will
respond in writing to any written public comments received. Table I lists the status of the Hazardous
11
Materials Programs staff review of each stationary
source’s Safety Plan, and audit and inspections of
their Safety Programs.
Number of Root Cause Analyses and/or
Incident Investigations Conducted by
Hazardous Materials Program
The Hazardous Materials Programs staff has not
performed any root cause analyses or incident
investigations since the last annual report. The
Hazardous Materials Programs staff did work
closely with the U.S. Chemical Safety and Hazard
Investigation Board, Cal/OSHA, US EPA, and the
Bay Area Air Quality Management District during
their investigations and follow-up audits and
inspections. A historical listing of Major Chemical
Accidents or Releases starting in 1992 is on the
Health Services website at cchealth.org/groups/
hazmat/accident_history.php. This list includes
major accidents that occurred prior to the
adoption of the Industrial Safety Ordinance.
Hazardous Materials Programs’ Process for
Public Participation
Hazardous Materials Programs in 2005 worked with
the community and developed materials that would
describe the Industrial Safety Ordinance using a number
of different approaches. The community representatives
suggested that the Hazardous Materials Programs staff
look at existing venues that are attended by the public
that the Hazardous Materials Programs staff can share
and receive comments on Preliminary Audit Findings
and the stationary source’s Safety Plans. Additionally,
based on Board recommendation in 2012, CCHMP are
making presentations and distributing audit reports to
Community Advisory Panel members.
Effectiveness of the Public Information Bank
The Hazardous Materials Programs section of
Health Services website cchealth.org/groups/
hazmat/ includes the following information:
• Industrial Safety Ordinance
–Description of covered facilities
–Risk Management Chapter discussion
»Copy of the ordinance
–Land Use Permit Chapter discussion
»Copy of the ordinance
–Safety Program Guidance Document
–Frequently Asked Questions
–Public Outreach strategies
• California Accidental Release Prevention
(CalARP) Program
–Contra Costa County’s California
Accidental Release Prevention Program
Guidance Document
–Program Level description
–Discussion on Public Participation
for both CalARP Program and the
Industrial Safety Ordinance
–A map locating the facilities that are
subject to the CalARP Program and are
required to submit a Risk Management
Plan to Hazardous Materials Program.
The map links to a description of each
of the facilities and the regulated
substances handled.
• Hazardous Materials Inventories and
Emergency Response Program
–Descriptions
–Forms
• Underground Storage Tanks
–Description of the program
–Copies of the Underground Storage
Tanks Health & Safety Code sections
–Underground Storage Tanks forms
• Green Business Program
–Description of the Green Business
Program with a link to the Association
of Bay Area Government’s website on
the Green Business Program
• Hazardous Materials Incident Response Team
–Including information of the Major
Chemical Accidents or Releases that
have occurred
–The County’s Hazardous Materials
Incident Notification Policy
• A link to the Phillips 66 Fenceline Monitors
• A link to the Chevron Richmond Refinery
12
Fenceline Monitors
• Unannounced Inspection Program
–Lists the facilities that are subject to unannounced inspections under the Unannounced
Inspection Program
• Incident Response
–Accident history that lists summaries of major accidents from industrial facilities in Contra
Costa County from most recent to 1992
–Additional resource links for more information
• Incidents
–Information on the June 15, 2012 Phillips 66 incident, including the follow-up reports and the
public meetings
–Information on the August 6, 2012 Chevron Crude Unit fire, including the follow-up reports and the
public meetings
13
Table IIndustrial Safety Ordinance Stationary Source Status
NAME Safety Plan (SP)
Received
Notice of
Deficiencies
(NOD)
Issued-SP
Safety Plan
Complete
SP Public
Meeting
Date
Audit/
Inspection
Audit
Public
Meeting
Air Liquide
Rodeo Hydrogen
Plant
7/10/09
7/14/2010
12/13/2012 3/1/2013 7/21/2013 6/1/2010
5/28/2013
10/8/11
10/5/2013
Air Products –
Shell & Tesoro
1/14/00
1/16/01 (HF update)
6/26/03
7/14/05
12/01/06
6/20/2008
6/30/2010
6/27/2013
6/15/00
5/10/01 (HF
update)
8/24/07
3/14/2011
8/30/00
6/19/01 (HF
update)
9/14/07
7/1/2008
9/13/00
5/8/03
9/23/07
6/19/2010
4/21/2012
11/22/00
5/3/02 (HF)
2/27/04
1/22/07
7/20/09
4/16/2012
5/8/03
9/24/06
9/23/07
6/19/2010
4/20/2013
Chemtrade
BPW (formerly
General
Chemical/Bay
Pt. Works)
1/14/00
1/15/01 (HF update)
12/10/03
10/9/07
10/24/2011
6/13/2014
6/12/00
7/23/01 (HF
update)
7/28/2008
9/10/2012
12/20/00
11/16/01 (HF
update)
3/17/04
12/13/08
9/20/2012
1/2/01
5/1/03
11/16/05
1/31/06
11/04/08
10/2/2012
8/11/00
5/20/02 (HF)
6/20/03
8/29/05
1/7/08
3/21/11
8/7/2013
1/2/01
5/1/03
11/16/05
1/31/06
11/8/06
1/2/07
11/04/08
10/2/2012
Phillips 66
(formerly
ConocoPhillips)
– Rodeo
1/15/00
1/12/01 (HF update)
8/10/05
8/7/09
8/7/2012
3/14/00
9/10/01
(HF update)
3/28/06
11/22/2010
5/30/00
3/18/02
(HF update)
8/9/02
11/5/07
1/27/2011
7/3/2013
6/15/00
5/9/02
10/7,13/07
10/8/2011
10/5/2013
7/21/2013
6/30/00
11/5/01 (HF)
8/1/03
8/15/06
10/6/08
8/1/11
4/28/2014
4/9/02
6/22/04
7/8/04
10/7,13/07
7/18/10,
10/9/10
10/8/11
7/21/2013
10/5/2013
Shell Martinez
Refinery
1/14/00
1/16/01 (HF
update)7/22/02
1/11/06
9/3/2010
9/3/2013
7/19/00
11/9/01 (HF
update)
3/21/03
8/15/06
10/25/2011
4/9/01
1/3/02
(HF update)
9/15/03
11/2/06
3/27/2012
5/8/03
9/24/06
9/23/07
4/21/2012
10/31/00
4/29/02 (HF)
11/26/04
10/23/06
4/30/09
2/13/2012
5/8/03
9/24/2006
9/23/07
6/19/2010
4/20/2013
Tesoro Golden
Eagle Refinery
1/14/00
1/12/01 (HF update)
6/21/02
6/22/07
12/11/09
6/1/2012
8/16/00
9/18/01
(HF update)
7/30/07
8/6/2012
1/31/01
12/14/01 (HF
update)
6/21/03
11/5/07
6/4/10
8/27/2012
5/6/03
9/23/07
6/10/10
9/6/2012
9/15/00
12/3/01 (HF)
9/8/03
11/07/05
8/18/08
4/18/2011
1/6/2014
5/6/03
9/24/06
9/23/07
6/10/2010
9/6/2012
14
Effectiveness of the Hazardous Materials Ombudsperson
The County Board of Supervisors created the Hazardous Materials Ombudsperson position in 1997.
This position was filled in April 1998. The Board believed that the ombudsperson would be a conduit
for the public to express their concerns about how Hazardous Materials Programs personnel are
performing their duties. Attachment A is a report from the Hazardous Materials Ombudsperson on
the effectiveness of the position for this reporting period.
Other Required Program Elements Necessary to Implement and Manage the Industrial
Safety Ordinance
The California Accidental Release Prevention (CalARP) Program is administered in Contra Costa
County by CCHMP. The Industrial Safety Ordinance expands on this program. Stationary sources
are required to submit a Risk Management Plan that is similar to the Safety Plans that are
submitted. Hazardous Materials Programs reviews these Risk Management Plans and performs the
CalARP Program audit simultaneously with the Industrial Safety Ordinance audit.
Hazardous Materials Programs performs unannounced inspections of stationary sources that
are part of the CalARP Program and are also required to submit a Risk Management Plan to the
U.S. EPA. These inspections look at a focused portion of the CalARP Program or Industrial Safety
Ordinance requirements, as well as elements from the other Hazardous Materials Programs.
Regulated Stationary Sources Listing
The Status of the Regulated Stationary Sources’ Safety Plans and Programs
All of the stationary sources regulated by the Industrial Safety Ordinance were required to submit
their Safety Plans to CCHMP by January 15, 2000 and to have their Safety Programs completed
and implemented. The stationary sources were also required to have a Human Factors Program
in place that follows the County’s Safety Program Guidance Document by January 15, 2001. The
status of each of the regulated stationary sources is given in Table I and includes the following:
• When the latest updated Safety Plan was submitted
• When the Notice of Deficiencies was issued
• When the plan was determined to be complete by Hazardous Materials Programs
• When the public meeting was held on the Safety Plan
• When the audits were complete
• When the public meetings were held on the preliminary audit findings
15
• When the Human Factors to the Safety Plan were revised
• When the Notice of Deficiencies was issued for the Human Factors revised Safety Plan
• When the Human Factors Safety Plan was determined to be complete
• When the Audit/Inspection was completed
• When the Human Factors Audit preliminary findings public meeting was held
Locations of the Regulated Stationary Sources Safety Plans
Each of the regulated stationary sources was required to submit a Safety Plan to Hazardous
Materials Program on January 15, 2000 and an updated Safety Plan that includes the
implementation of the stationary source’s Human Factors Program by January 15, 2001. The
regulated stationary sources are required to update their Safety Plan at least once every three
years. These plans are available for public review at the Hazardous Materials Programs Offices at
4585 Pacheco Blvd., Suite 100, Martinez. When Hazardous Materials Programs determines that
the Safety Plan is complete, and prior to going out for a 45-day public comment period, Hazardous
Materials Programs will place the plan in the library(ies) closest to the regulated stationary source.
Table II lists the regulated stationary sources with the location of each Safety Plan.
Annual Accident History Report and Inherently Safer Systems Implemented as Submitted
by the Regulated Stationary Sources
The Industrial Safety Ordinance requires the stationary sources to update the information on their
accident history in their Safety Plans and include how they have used inherently safer processes
within the last year. Table III lists some of the Inherently Safer Systems that have been implemented
by the different stationary sources during the same period. Attachment B includes the individual
reports from the stationary sources.
Table IILocation of Safety Plans—Libraries
Regulated Stationary Source Location 1 Location 2 Location 3
Air Liquide Large Industries Hazardous Materials
Programs Office
Rodeo Public
Library
Crockett Public
Library
Air Products at Shell Hazardous Materials
Programs Office
Martinez Public
Library
Air Products at Tesoro Hazardous Materials
Programs Office
Martinez Public
Library
Shell Refining-Martinez Hazardous Materials
Programs Office
Martinez Public
Library
General Chemical West
Bay Point Works
Hazardous Materials
Programs Office
Bay Point Public
Library
Phillips 66 (formerly ConocoPhillips)
Rodeo Refinery
Hazardous Materials
Programs Office
Rodeo Public
Library
Crockett Public
Library
Tesoro Golden Eagle Refinery Hazardous Materials
Programs Office
Martinez Public
Library
16
Table IIIInherently Safer Systems
Regulated Stationary Source Inherently Safer System Implemented Design Strategy Category
Air Liquide Large
Industries
No new inherently safer systems have been implemented (in
this period)
Air Products at Shell
Martinez Refinery
No new inherently safer systems have been implemented (in
this period)
Air Products at Tesoro No new inherently safer systems have been implemented (in
this period)
General Chemical West
Bay Point Works
No new inherently safer systems have been implemented (in
this period) though the facility aims to use smaller sample sizes
Phillips 66 (formerly
ConocoPhillips)—Rodeo
Refinery
Reduced inventory by combining or removing equipment
from the process (1 times)
Inherent Minimization
Simplified unit design and chemical inventory by changing/
re-routing equipment (9 times)
Inherent Simplify
Changed equipment design to reduce potential of a hazard (1 time)Inherent Substitute
Reduced the potential of a hazard by relocation and
equipment design (3 times)
Passive Moderate
Reduced the potential of a hazard by changing equipment
design (2 times)
Passive Simplify
Reduced potential of exposure by changing equipment
metallurgy or design (16 times)
Passive Substitute
Shell Martinez Refinery Reduction of inventory by removing dead-leg piping (2 times)Inherent Minimization
Eliminated exposure potential by changing chemical and
equipment design (3 times)
Inherent Substitute
Reduced the potential of a hazard by changing operating
conditions (3 times)
Inherent Moderate
Reduced potential of exposure by changing equipment
metallurgy or design (9 times)
Passive Moderate
Change equipment configuration or design to reduce
potential of a hazard (3 times)
Passive Simplify
Reduced potential of exposure by changing equipment layout
or design (2 times)
Passive Minimization
Reduced the potential of a hazard by adding equipment, or
controls (9 times)
Active Moderate
Tesoro Golden Eagle
Refinery
Eliminated hazardous material release points from
equipment modification or removal (1 time)
Inherent Minimization
Reduced potential of the hazardous condition by equipment
design features. (6 times)
Passive Moderate
Reduced potential of the hazardous condition by reducing
inventory (2 Times)
Passive Minimization
17
Status of the Incident Investigations, Including the Root Cause Analyses Conducted by the
Regulated Stationary Sources
The Industrial Safety Ordinance requires the regulated stationary sources to do an incident
investigation with a root cause analysis for each of the major chemical accidents or releases as
defined by the following: “Major Chemical Accident or Release means an incident that meets
the definition of a Level 3 or Level 2 incident in the Community Warning System incident level
classification system defined in the Hazardous Materials Incident Notification Policy, as determined
by Contra Costa Health Services; or results in the release of a regulated substance and meets one
or more of the following criteria:
• Results in one or more fatalities
• Results in greater than 24 hours of hospital treatment of three or more persons
• Causes on- and/or off-site property damage (including cleanup and restoration activities)
initially estimated at $500,000 or more. On-site estimates shall be performed by the
regulated stationary source. Off-site estimates shall be performed by appropriate agencies
and compiled by Health Services
• Results in a vapor cloud of flammables and/or combustibles that is more than 5,000 pounds”
The regulated stationary source is required to submit a report to Hazardous Materials Programs
30 days after the root cause analysis is complete. There were no Major Chemical Accidents or
Releases that occurred since the last annual report in Contra Costa County at the ISO facilities.
However, there was a level 2 incident at K2 Pure that lasted 6 minutes. The 72-hour report related
to the K2 incident and the final RCA reports for previous MCAR incident reports are available at the
Hazardous Materials Programs office and website.
Major Chemical Accidents or Releases
Hazardous Materials Programs analyzed the Major Chemical Accidents or Releases (MCAR) that
occurred since the implementation of the Industrial Safety Ordinance. The analysis includes the
number of MCARs and the severity of the MCARs. Three different levels of severity were assigned:
• Severity Level III—A fatality, serious injuries or major on-site and/or off-site damage occurred
• Severity Level II—An impact to the community occurred, or if the situation was slightly different
the accident may have been considered major, or there is a recurring type of incident at that
facility
• Severity Level I —A release where there was no or minor injuries, the release had no or slight
impact to the community, or there was no or minor onsite damage
Below are charts showing the number of MCARs from January 1999 through October 2014 for
all stationary sources in Contra Costa County, the MCARs that occurred at stationary sources
regulated by the County’s Industrial Safety Ordinance, and a chart showing the MCARs that have
occurred at the County and the City of Richmond’s Industrial Safety Ordinance stationary sources.
The charts also show the number of severity level I, II and III MCARs for this period. NOTE: The
charts do not include any transportation MCARs that have occurred.
18
19
A weighted score has been developed giving more weight to the higher severity incidents and a
lower weight to the less severe incidents. The purpose is to develop a metric of the overall process
safety of facilities in the County, the facilities that are covered by the County and the City of
Richmond Industrial Safety Ordinances, and the facilities that are covered by the County’s Industrial
Safety Ordinance. A severity level III incident is given 9 points, severity level II is given 3 points and
severity level I is given 1 point. Below is a graph of this weighted scoring.
Legal Enforcement Actions Initiated by Contra Costa Hazardous Materials Programs
As part of the enforcement of the Industrial Safety Ordinance and the CalARP Program, Hazardous
Materials Programs issues Notices of Deficiencies on the Safety and Risk Management Plans and
issues Audit Findings on what a stationary source is required to change to come into compliance
with the regulations. Table I shows the action that has been taken by Hazardous Materials
Programs. Hazardous Materials Programs has not taken any action through the District Attorney’s
Office for noncompliance with the requirements of the Industrial Safety Ordinance.
Penalties Assessed as a Result of Enforcement
No penalties have been assessed this period for noncompliance with the Industrial Safety Ordinance.
Total Fees, Service Charges and Other Assessments Collected Specifically for
the Industrial Safety Ordinance
The fees charged for the Industrial Safety Ordinance are to cover the time that the Accidental
Release Prevention Engineers use to enforce the ordinance, the position of the Hazardous Materials
20
Ombudsperson, outreach material and to cover a portion of the overhead for the Hazardous
Materials Programs. The fees charged for administering this ordinance for the fiscal year 2013-14 is
$317,823.
Total Personnel and Personnel Years Used by Hazardous Materials Program to
Implement the Industrial Safety Ordinance
The Accidental Release Prevention Programs Engineers have reviewed resubmitted Safety Plans,
prepared and presented information for public meetings, performed audits of the stationary
sources for compliance with both the California Accidental Release Prevention Program and
Industrial Safety Ordinance and did follow-up work after a Major Chemical Accident or Release. The
following is a breakdown of the time that was spent on the County’s and the City of Richmond’s
Industrial Safety Ordinances:
• Six ISO/CalARP Program facility audits were performed since the last ISO report with
four done between October 2013 and October 2014. It takes four to five engineers four
weeks to perform the on-site portion of an ISO/CalARP Program audit. The audit process
encompasses off-site time that includes a quality assurance process, working with the
facility to address any questions, posting public notices, attending a public forum to share
audit findings, addressing any questions from the public and issuing the final report. The
total time taken to perform these audits in 2014 was 3,600 hours. Approximately one-third
of the time was dedicated to the Industrial Safety Ordinance, for a total of 1, 200 hours.
• Reviewing information for the website—50 hours
• Reviewing Safety Plans and following up with the facilities on any deficiencies—205 hours
• Review and participate in investigation, root cause analysis and proposed
recommendations— 500 hours
• Health Services Community Education and Information Office or the Accidental Release
Prevention Engineers prepare material for presentations and public meetings—total
approximately 150 personnel hours.
• Total of 2,105 hours is the approximate personnel time spent on the Industrial Safety
Ordinance.
• This is not including the Ombudsperson time spent helping prepare for the public meetings,
working with the engineers on questions arising from the Industrial Safety Ordinance, and
answering questions from the public on the Industrial Safety Ordinance.
Comments from Interested Parties Regarding the Effectiveness of the
Industrial Safety Ordinance
No comments were received on the County’s or the City of Richmond’s Industrial Safety Ordinances
since the last annual report.
The Impact of the Industrial Safety Ordinance on Improving Industrial Safety
Four programs are in place to reduce the potential of an accidental release from a regulated
stationary source that could impact the surrounding community. The four programs are the Process
Safety Management Program administered by Cal/OSHA, the federal Accidental Release Prevention
Program administered by the U.S. EPA, the California Accidental Release Prevention Program
administered locally by CCHMP, and the Industrial Safety Ordinance, which is also administered by
21
CCHMP. Each of the programs is very similar in requirements, with the Industrial Safety Ordinance
being the most stringent. The prevention elements of the program level 3 regulated stationary
sources under the federal Accidental Release Prevention Program is almost identical to the Process
Safety Management Program. CalARP differs from the federal Accidental Release Prevention
Program in the following ways:
• The number of chemicals regulated
• The threshold quantity of these chemicals
• An external events analysis, including seismic and security and vulnerability analysis, is required
• Additional information in the Risk Management Plan
• CCHMP is required to audit and inspect stationary sources at least once every three years
• The interaction required between the stationary source and CCHMP
• The ISO differs from CalARP in the following ways:
• Stationary sources are required to include a root cause analysis with the incident investigations
for Major Chemical Accidents or Releases
• The stationary sources are required to consider inherently safer systems
• All of the processes at the regulated stationary sources are covered
• Managing changes in the organization for operations, maintenance and emergency response
• The implementation of a Human Factors Program
• Expand the Human Factors section of the Industrial Safety Ordinance to include the following:
–Maintenance procedures
–Management of Organizational Changes
»Maintenance personnel
»A job task analysis for each of the positions that work in operations, maintenance,
emergency response and Health and Safety
»Include temporary changes in the Management of Organizational Change
• A requirement that the stationary sources perform a Security and Vulnerability Analysis and test the
effectiveness of the changes made as a result of the Security and Vulnerability Analysis
• The stationary sources perform a Safety Culture Assessment
• The Board of Supervisors amended the County’s Industrial Safety Ordinance to expand the
requirements of the ordinance in 2014. These amendments are:
– Expand the requirement to implement Inherently Safer Systems to existing processes,
as part of the Management of Change Process, for new projects and processes, and
implementation of recommendations from an incident investigation
– To develop process safety performance indictors with “common” indicators being made
public
– Require a Safeguard Protection Analysis to determine the effectiveness of safeguards used
during a Process Hazard Analysis
The Safety Culture Assessment guidance chapter was finalized in November 2009. The Industrial
Safety Ordinance Guidance Document is being updated to include the remaining changes to the
ordinance and a draft was issued in September 2010. The Accidental Release Prevention Engineers
have participated with the Center for Chemical Process Safety on developing the second edition of
Inherently Safer Chemical Processes, a book that is referenced in the ordinance and with the Center
for Chemical Process Safety on developing process safety metrics for leading and lagging indicators.
22
All of these requirements have lowered the probability of an accident occurring.
Contra Costa County was recognized as an alternative model for doing process-safety inspections
by the Chemical Safety and Hazard Investigation Board in its report on a 2005 refinery accident
in Texas City. The report states, “Contra Costa County and the U.K. Health and Safety Executive
conduct frequent scheduled inspections of PSM and major hazard facilities with highly qualified
staff.” This was done to compare to the number of OSHA process safety management audits.
The Chemical Safety and Hazard Investigation Board also mentions Contra Costa County in a DVD,
Anatomy of a Disaster: Explosion at BP Texas City Refinery, on the resources given to audit and
ensure facilities are complying with regulations.
Carolyn W. Merritt, the Chemical Safety and Hazard Investigation Board Chair at that time, also
recognized Contra Costa County in 2007 testimony to the House of Representatives Committee on
Education and Labor chaired by U.S. Rep. George Miller. U.S. Sen. Barbara Boxer, during a hearing
to consider John Bresland’s nomination to the Chemical Safety and Hazard Investigation Board as
the Chair (replacing Carolyn Merritt) in December 2007, asked Mr. Bresland about the Contra Costa
County program for process safety audits of refineries and chemical companies.
In its final investigation report on an incident that occurred in 2008 at the Bayer Crop Science in
Institute, West Virginia, the CSB recommended that regulatory agencies in the area audit their
chemical facilities using Contra Costa County’s auditing process. CCHMP staff and a representative
from the local United Steelworkers Union were part of a panel when the Chemical Safety and
Hazard Investigation Board presented this report to the Kanawha Valley community.
Contra Costa Hazardous Materials Programs was asked to give testimony at the hearing on “Work
Place Safety and Worker Protections in the Gas and Oil Industry” before the U.S. Senate Committee
on Health, Education, Labor, and Pensions Subcommittee on Employment and Workplace Safety.
The testimony was on the success of the Accidental Release Prevention Programs that are in place
in Contra Costa County. The hearing was specific on two major incidents that occurred in Anacortes,
Wash. at a Tesoro Refinery and the Deepwater Horizon incident in the Gulf of Mexico. A link to the
testimony is posted on the Health Services website and can be found at http://help.senate.gov/
hearings/hearing/?id=fe34048f-5056-9502-5d69-2609a5d5501a.
In September 2012, Contra Costa Hazardous Materials Programs was asked to be a presenter
at the “Expert Forum on the Use of Performance-based Regulatory Models in the U.S. Oil and
Gas Industry: Offshore and Onshore” in Texas City, Texas to share the regulatory experience
at Contra Costa County. And give testimony on how local, state and Federal agencies can work
together and have an unprecedented alignment on regulations that is required for the same
facilities. This informational meeting was spearheaded by Federal Occupational Safety and Health
Administration and attended by Bureau of Safety and Environmental Enforcement, United States
Coast Guard, United States Environmental Protection Agency, Pipeline and Hazardous Materials
Safety Administration, United Steelworkers, American Petroleum Institute, academia and industry
representatives.
23
City of Richmond Industrial Safety Ordinance
The City of Richmond on December 18, 2001 passed its version of the Industrial Safety Ordinance,
which became effective January 17, 2002. Richmond’s Industrial Safety Ordinance (RISO)
mirrors the County’s Industrial Safety Ordinance. Richmond’s Industrial Safety Ordinance covers
two stationary sources: Chevron Richmond Refinery and Chemtrade Richmond Works. CCHMP
administers the Richmond ISO.
Chevron and Chemtrade Richmond Works submitted their Safety Plans to Hazardous Materials
Programs, which have been reviewed and considered complete. The public comment period for
these plans ended in January 2004. Public meetings held in 2004 in North Richmond and Richmond
discussed Chevron and Chemtrade Richmond Works audit findings. The
second Richmond Industrial Safety Ordinance/CalARP Program audits for these facilities occurred
in 2006 and public meetings were held in June 2007 at Hilltop Mall at “Lessons from Katrina,” the
2007 Neighbor Works Week Homeownership Faire & Disaster Preparedness Expo.
CCHMP followed up on the January 15, 2007 fire at the Chevron Refinery. The follow-up included a
public meeting, City Council meetings, meetings with Chevron on the investigation and the root cause
analysis. Chevron Richmond Refinery was audited for the third time for RISO/CalARP program in
April 2008 The report was finalized and results were available at the Recycle More Earth Day Event
in Richmond in June 2009. Copies of the audit results are available at the Richmond Library and a
summary of the audit is also available on Hazardous Materials Programs’ website.
CCHMP performed an RISO/CalARP program audit at Chemtrade Richmond Works in January 2012 and
is working with Chemtrade on the proposed remedies to the audit actions. The final report from the 2009
audit was shared in a public event in Richmond in September 2010. CCHMP performed the fifth RISO/CalARP
program audit at Chevron Richmond Refinery in February 2011. The final audit report was shared at the West
County Emergency Preparedness Fair in El Cerrito in September 2011. CCHMP also made presentation to Point
Richmond Neighborhood Council at the Point Richmond Firehouse about Chemtrade Richmond Works and
Chevron Richmond Refinery’s audit history, incidents and general Industrial Safety Ordinance information on
January 25, 2012.
Hazard Materials Program followed up with Chevron Richmond Refinery and worked each with U.S.
EPA, Cal OSHA, BAAQMD and CSB in their independent investigation of the August 6, 2012 fire at
the No. 4 Crude Unit. To date, CCHMP co-hosted two public meetings in conjunction with the City
of Richmond to share information regarding this severity level III incident. CCHMP, City of Richmond
and representatives of the agencies performing the investigation shared preliminary results and
addressed public issues and concerns. Written comments were gathered and are posted on the
Health Services’ website. CCHMP hired a third party to perform a safety evaluation of the Chevron
Richmond Refinery after the August 6, 2012 fire. The evaluation is looking at the safety culture
of the refinery, the process safety management systems, and human factors. The final report is
almost complete and will go through a public review process including a review from the oversight
committee that was selected for this process.
24
CCHMP presented the 2010 annual RISO report to the Richmond City Council on July 26, 2011.
Copies of the 2011 RISO report were submitted to the Richmond City Council and posted on
cchealth.org. Select community members were also included in the distribution.
CCHMP staff worked closely with the City of Richmond staff in preparation of the Richmond
Industrial Safety Ordinance amendment (adopted in January 2013) that made the Richmond
Industrial Safety Ordinance consistent with the Contra Costa County Industrial Safety Ordinance.
CCHMP again worked with the City of Richmond staff on the 2014 amendments to the Richmond
Industrial Safety Ordinance and the County Industrial Safety Ordinance designed to address
recommendations by the US Chemical Safety and Investigation Board following the August 6, 2012
Chevron fire that further improves process safety operations in Contra Costa County refineries and
Chemical facilities.
25
ATTACHMENT A
HAZARDOUS MATERIALS
OMBUDSMAN REPORT
Hazardous Materials
Ombudsperson Evaluation
October 2013—September 2014
26
I. INTRODUCTION
On July 15, 1997 the Contra Costa County Board of Supervisors authorized creation of an
Ombudsman position for the County’s Hazardous Materials Programs. The first Hazardous
Materials Ombudsman began work on May 1, 1998. The Contra Costa County Board of Supervisors
adopted an Industrial Safety Ordinance on December 15, 1998. Section 450-8.022 of the Industrial
Safety Ordinance requires the Health Services Department to continue to employ an Ombudsman
for the Hazardous Materials Programs. Section 450-8.030(B)(vii) of the Industrial Safety Ordinance
requires an annual evaluation of the effectiveness of the Hazardous Materials Ombudsman, with
the first evaluation to be completed on or before October 31, 2000.
The goals of section 450-8.022 of the Industrial Safety Ordinance for the Hazardous Materials
Ombudsman are:
1. To serve as a single point of contact for people who live or work in Contra Costa County
regarding environmental health concerns, and questions and complaints about the Hazardous
Materials Programs.
2. To investigate concerns and complaints, facilitate their resolution, and assist people in gathering
information about programs, procedures, or issues.
3. To provide technical assistance to the public.
The Hazardous Materials Ombudsman currently accomplishes these goals through the following
program elements:
1. Continuing an outreach strategy so that the people who live and work in Contra Costa County
can know about and utilize the program.
2. Investigating and responding to questions and complaints, and assisting people in gathering
information about programs, procedures, or issues.
3. Participating in a network of environmental programs for the purpose of providing technical
assistance.
This evaluation covers the period from November, 2013 through October, 2014 for the Hazardous
Materials Ombudsman program. The effectiveness of the program shall be demonstrated by
showing that the activities of the Hazardous Materials Ombudsman meet the goals established in
the Industrial Safety Ordinance.
27
II. PROGRAM ELEMENTS
1. Continuing an Outreach Strategy
This period efforts were focused on maintaining the outreach tools currently available.
Copies of the Ombudsman Brochure were translated into Spanish and were distributed to
the public at meetings, presentations, public events, and through the mail. A contact person
was also established in Public Health that could receive calls from the public in Spanish
and serve as an interpreter to respond to these calls. In addition to explaining the services
provided by the position, the brochure also provides the phone numbers of several other
related County and State programs. The web page was maintained for the program as
part of Contra Costa Health Services web site. This page contains information about the
program, links to other related web sites, and information about upcoming meetings and
events. A toll-free phone number is published in all three Contra Costa County phone books
in the Government section.
2. Investigating and Responding to Questions and Complaints, and Assisting in Information
Gathering
During this period, the Hazardous Materials Ombudsman received 148 information
requests. Over 95 percent of these requests occurred via the telephone, and have been
requests for information about environmental issues. Requests via e-mail are slowly
increasing, mainly through referrals from Health Services’ main web page. Most of these
requests concern problems around the home such as asbestos removal, household
hazardous waste disposal, pesticide misuse, mold and lead contamination.
Information requests about environmental issues received via the telephone were generally
responded to within one business day of being received. Many of the information requests
were answered during the initial call. Some requests required the collection of information
or written materials that often took several days to compile. Telephone requests were
responded to by telephone unless written materials needed to be sent as part of the
response.
Complaints about the Hazardous Materials Programs can also be received via telephone
and in writing. Persons that make complaints via telephone are also asked to provide those
complaints in writing. During this period, tThe Hazardous Materials Ombudsman did not
receive any complaints about the Hazardous Materials Program this period.
The Ombudsman facilitated two community meetings during this period on behalf of the
State Refinery Safety Task Force concerning their its efforts to improve refinery safety
regulations and programs.
28
The Ombudsman conducted a half-day training session and tour about environmental health
issues for 8 students in the joint UC Berkeley/UC San Francisco MPH/MD program.
3. Participating in a Network of Environmental Programs for the Purpose of Providing
Technical Assistance.
Technical assistance means helping the public understand the regulatory, scientific, political, and
legal aspects of issues. It also means helping them understand how to effectively communicate
their concerns within these different arenas. This year, the Ombudsman continued to staff a
number of County programs and participate in other programs to be able to provide technical
assistance to the participants and the public.
• CAER (Community Awareness and Emergency Response)—This non-profit organization
addresses industrial accident prevention, response and communication. The Ombudsman
participated in the Emergency Notification subcommittee of CAER.
• Hazardous Materials Commission – In 2001, the Ombudsman took over as staff for the
Commission. As staff to the Commission, the Ombudsman conducts research, prepared
prepares reports, drafts letters and provides support for 3 monthly Commission meetings.
• In addition, during this period the Ombudsman represented the Commission at meetings of the
Contra Costa County Prescription Drug Abuse Prevention Task Force and facilitated a workgroup
of local agencies in the development and dissemination of an educational poster concerning
proper disposal of unused medication. The Ombudsman also represented the Commission in
task force meetings of the Northern Waterfront Revitalization Effort. The Ombudsman also
supported the Commission’s response to a request from one of the members of the Board of
Supervisors about an issue related to pipeline safety. Related to this effort, the Ombudsman
assisted a County resident in the application for a grant to conduct outreach and education
efforts around pipeline safety issues.
• Integrated Pest Management Advisory Committee—During this period the Ombudsman
represented the Health Services Department on the County Integrated Pest Management
Advisory Committee. This Committee brings Department representatives and members of the
public together to help implement the County’s Integrated Pest Management policy.
• Asthma Program—The Ombudsman participated in the Public Health Department’s Division’s
asthma program as a resource on environmental health issues. The Ombudsman represented
the Asthma asthma program in two regional collaboratives related to asthma issues, particularly
diesel pollution—the Ditching Dirty Diesel Collaborative and the Bay Area Environmental Health
Collaborative. The Ombudsman served on the Technical Advisory Board for RAMP, the Regional
Astham Asthma Management Prevention program. Also, the Ombudsman facilitated the
coordination of the County’s Asthma clinical care program with the efforts of a non-profit
organization hired by the Department of Conservation and Development to provide asthma
trigger check-ups to homes in West Contra Costa County.
29
The Ombudsman also worked with the Bay Area Air Quality Management District and the
Alameda County Public Health Department to successfully apply for a grant from the
National Fish and Wildlife Foundation that will provide $230,000 dollars to Contra Costa County
agencies and private entities to replace gas powered lawn equipment with electric powered
lawn equipment.
• Bay Area Air Quality Management District’s Community Air Risk Evaluation Program
During this period the Ombudsman represented the Public Health Division on the advisory
board to this Air District program. This advisory board meets quarterly to discuss
implementation of this program that identifies and creates strategies to address health
risks in communities with high air pollution emissions in the Bay Area. Three of these areas
are in Contra Costa County.
• Climate Change
During this period the Ombudsman worked with other staff in the Public Health
Department to prepare a health vulnerability assessment to the impacts of Climate
Change as part of a grant the County received from the State California Department of
Public Health. The Ombudsman also represented the Public Health DepartmentPublic
Health Division in regional, state and national efforts on addressing the impacts of Climate
Change. The Ombudsman recently was appointed co-chair of the Bay Area Regional Health
Inequities Initiative’s Built Environment committee which addresses climate change, and
represented Bay Area Health health Departments departments at a National national
Conference conference on Climate climate cChange. The Ombudsman also facilitated the
development of a panel presentation at a climate change conference sponsored by the
Local Government Commission.
• Bay Delta Stakeholder Advisory Group for Contaminated Fish Consumption
The Ombudsman was invited to serve on the California Department of Public Health’s Bay
Delta Stakeholder Advisory Group for Contaminated Fish Consumption. This is a two y-ear
effort to develop updated and effective public messaging for the new fish consumption
advisories for the Bay Delta that have been developed by the State.
The Hazardous Materials Ombudsman also attended workshops, presentations, meetings
and trainings on a variety of environmental issues to be better able to provide technical
assistance to the public. Topics included Environmental environmental Justicejustice,
Cumulative cumulative impacts assessment, emergency management practices, health
mitigations for consumption of contaminated fish, and land-use planning for greenhouse
gas reduction.
III. PROGRAM MANAGEMENT
The Hazardous Material Ombudsman continued to report to the Public Health Director on a
day-to-day basis during this period, while still handling complaints and recommendations about
the Hazardous Materials Programs through the Health Services Director. The Ombudsman also
30
was a member of Health Services’ Emergency Management Team and participates on its the
department’s HEEP management team.
IV. GOALS FOR THE 2014-2015 PERIOD
In this period, the Ombudsman will provide essentially the same services to Contra Costa residents
as was provided in the last period. The Ombudsman will continue respond to questions and
complaints about the actions of the Hazardous Materials Programs; answer general questions that
come from the public and assist them in understanding regulatory programs; staff the Hazardous
Materials Commission; represent the Public Health DepartmentPublic Health Division as part of
the Ditching Dirty Diesel Collaborative, the Bay Area Regional Health Inequities Initiative and the
Bay Area Environmental Health Collaborative; represent the Health Services Department on
the Integrated Pest Management Advisory Committee and participate in the CAER Emergency
Notification committee. The Ombudsman will also represent the Hazardous Materials Commission
in the Northern Shoreline Revitalization effort and the Contra Costa Prescription Abuse Prevention
Coalition, and will represent the Public Health DepartmentPublic Health Division in the Bay Delta
Stakeholder Advisory Group. The Ombudsman has also applied to be on the Technical Advisory
Committee for the Metropolitan Transportation Commission’s Goods Movement Plan development.
During this period the Ombudsman will continue to work with the Public Health DepartmentPublic
Health Division on Climate climate change issues by working with collaboratives at the regional and
state level, and by reaching out to other agencies and interested parties in Contra Costa County, to
promote addressing health equity issues in climate change planning efforts.
The Ombudsman will also assist the State Refinery Safety Task Force by assisting the in the
development and facilitation of Community community Safety safety Forums forums throughout
the County over the course of the next year.
31
ATTACHMENT B
REGULATED SOURCES
ANNUAL PERFORMANCE
WITH ACCIDENT HISTORY
AND INHERENT SAFETY
IMPLEMENTATION
32
Annual Performance Review and Evaluation Submittal
June 30, 2014
*Attach additional pages as necessary
1. Name and address of Stationary Source: Air Liquide Rodeo Hydrogen Plant, 1391 San Pablo Ave.,
Rodeo, California 94572
2. Contact name and telephone number (should CCHMP have questions): Jared Wittry—(510)
245-7285 x 2204
3. Summarize the status of the Stationary Source’s Safety Plan and Program (450-8.030(B)
(2)(i)): The revised safety plan was submitted in April 2013 as part of the 3 year review and incorporated
the NODs received by the county in December 2012. The audit conducted in June of 2013 provided more
guidance for the imrpove of the safety program at the Rodeo Facility and progress is being made to address
the additional NODs based on all the new programs implimented at the Rodeo SMR.
4. Summarize Safety Plan updates (i.e., brief explanation of update and corresponding
date) (450-8.030(B)(2)(ii)): Since the audit in June of 2013, we continue to meet monthly to address
recommendations from the audit and improve the safety systems at the Rodeo SMR. As an organization, we
have centralized many of the life critical procedures and have begun to introduce the Procedural PHAs at
other facilities with success.
5. List of locations where Safety Plans are/will be available for review, including contact
telephone numbers if the source will provide individuals with copies of the document
(450-8.030(B)(2)(ii)): CCHMP Office at 4585 Pacheco Boulevard, Suite 100, Martinez; Martinez Library;
Rodeo Public Library; Crockett Public Library (library closest to the stationary source).
6. Provide any additions to the annual accident history reports (i.e. updates) submitted
pursuant to Section 450-8.016(E)(2) of County Ordinance 98-48 (450-8.030(B)(2)(iii)) (i.e.,
provide information identified in Section 450-8.016(E)(1) for all major chemical accidents
or releases occurring between the last annual performance review report and the current
annual performance review and evaluation submittal (12-month history)): There have been no
incidents since the previous annual review.
7. Summary of each Root Cause Analysis (Section 450-8.016(C)) including the status of the
analysis and the status of implementation of recommendations formulated during the
analysis (450-8.030(B)(2)(iv)): There have been no incidents since the previous review.
8. Summary of the status of implementation of recommendations formulated during
audits, inspections, Root Cause Analyses, or Incident Investigations conducted by the
Department (450-8.030(B)(2)(v)): There have been no incidents since the previous review. The 2010
ISO audit actions items were incorporated into the revised April 2013 Safety Plan.
33
9. Summary of inherently safer systems implemented by the source including but not limited to
inventory reduction (i.e., intensification) and substitution (450-8.030(B)(2)(vi)): No new inherently
safer systems have been implimented at the facility.
10. Summarize the enforcement actions (including Notice of Deficiencies, Audit Reports, and
any actions turned over to the Contra Costa County District Attorney’s Office) taken with the
Stationary Source pursuant to Section 450-8.028 of County Ordinance 98-48 (450-8.030(B)(2)
(vii)): There were no enforcement actions during this period.
11. Summarize total penalties assessed as a result of enforcement of this Chapter (450-8.030(3)):
No penalities have been assessed against this facility.
12. Summarize the total fees, service charges, and other assessments collected specifically for
the support of the ISO (450-8.030(B)(4)): The total CalARP Program fees for the seven County ISO facilities
subject to the Industrial Safety Ordinance was $515,347. The total Industrial Safety Ordinance program fees for
the seven County ISO facilities was $317,823. (NOTE: These fees do not include the two City of Richmond ISO
facilities).
13. Summarize total personnel and personnel years utilized by the jurisdiction to directly
implement or administer this Chapter (450-8.030(B)(5)): 5518 hours were used to audit/inspect and
issue reports on the Risk Management Chapter of the Industrial Safety Ordinance.
14. Copies of any comments received by the source (that may not have been received by the
Department) regarding the effectiveness of the local program that raise public safety
issues(450-8.030(B)(6)): None
15. Summarize how this Chapter improves industrial safety at your stationary source (450-
8.030(B)(7)): This chapter helps to reinforce the need to maintain and follow our structured safety program to
help ensure that safety of our employees and the communities in which we operate.
16. List examples of changes made at your stationary source due to implementation of the
Industrial Safety Ordinance (e.g., recommendations from PHA’s, Compliance Audits, and
Incident Investigations in units not subject to CalARP regulations; recommendations from
RCA’s) that significantly decrease the severity or likelihood of accidental releases. The Human
Factors Program that was developed and implemented continues to reduce the potential for injury. In addition,
LIVES 102 Training ensures that all essential life critical procedures are communicated and understood. All Life
Critical Procedures have been centralized including Hot Work, Confined Space, Safe Work Permit and LOTO
procedures. The fall protection procedure has also been revised to include new regulatory requirements additional
safety precautions. The SPCC plan was recertified by a Professional Engineer in May of 2014 along with the RMP
plan in June of 2014 to incorporate recommendations given in the June 2013 ISO Audit.
17. Summarize the emergency response activities conducted at the source (e.g., CWS or TEN
activation) in response to major chemical accidents or releases: None
34
Annual Performance Review and Evaluation Submittal
June 30, 2014
*Attach additional pages as necessary
1. Name and address of Stationary Source:
Chemtrade West US LLC - Bay Point Works (BPW), 501 Nichols Road, Pittsburg, CA 94565
2. Contact name and telephone number (should CCHMP have questions):
Bradford D. Anderson 925-458-7362 or Todd M. Ravazza 925-458-7301
3. Summarize the status of the Stationary Source’s Safety Plan and Program (450-8.030(B)
(2)(i)): BPW Safety Plan and Prevention Programs (e.g. Cal ARP, ISO, RMP, PSM) have recently been revised
to reflect recent CCCHMP ISO Audit findings action items, PHA recommendations and Third party Audit,
recent acquisition of BPW by Chemtrade West US LLC, current staffing levels, decommissioned processes
and emergency response capabilities. Personnel have been trained as to all the aforementioned revisions.
Due to significant changes (e.g. process decommissioning, reductions in force, etc.) major overhauls of all of
these programs were necessary and have been completed.
4. Summarize Safety Plan updates (i.e., brief explanation of update and corresponding date)
(450-8.030(B)(2)(ii)): BPW Safety Plan was recently revised to reflect action items form the past 2 ISO
audits, these revisions include the following: Name change from General Chemical to Chemtrade West US
LLC as new owner/operator; Section I (C)—updates to remove decommissioned processes in the Chemically
Pure process; Section I (D—Updated volumes in Table 1a for CalARP/RMP Regulated Substances on site;
updated Table 1b Non-Regulated Substances on site; Section II—Process Hazard Analysis, added Procedural
PHA requirement; Section II (O)—Safety Program Management, added Chemtrade goal to become
Responsible Care 14001 certified ASAP.
5. List of locations where Safety Plans are/will be available for review, including contact
telephone numbers if the source will provide individuals with copies of the document
(450-8.030(B)(2)(ii)): CCHMP Office at 4585 Pacheco Boulevard, Suite 100, Martinez; Bay Point 205
Pacifica Ave., Bay Point, CA 94565 (library closest to the stationary source).
6. Provide any additions to the annual accident history reports (i.e. updates) submitted
pursuant to Section 450-8.016(E)(2) of County Ordinance 98-48 (450-8.030(B)(2)(iii)) (i.e.,
provide information identified in Section 450-8.016(E)(1) for all major chemical accidents
or releases occurring between the last annual performance review report and the current
annual performance review and evaluation submittal (12-month history)): There have been no
major chemical accidents or releases in the last 12 months.
7. Summary of each Root Cause Analysis (Section 450-8.016(C)) including the status of the
analysis and the status of implementation of recommendations formulated during the
analysis (450-8.030(B)(2)(iv)): NA.
35
8. Summary of the status of implementation of recommendations formulated during audits,
inspections, Root Cause Analyses, or Incident Investigations conducted by the Department
(450-8.030(B)(2)(v)): Since the August 2013 ISO Audit conducted by the department, of the 38 Ensure items 18 have
beeen closed; of the 27 Consider items 10 have been closed, these clsoures have been based on the Administrative Draft
of the Preliminary Determination Audit Report for Chemtrade West /Bay Point Works—CalARP/ISO Program Audit.
9. Summary of inherently safer systems implemented by the source including but not limited
to inventory reduction (i.e., intensification) and substitution (450-8.030(B)(2)(vi)): Continued
reduction in diversity and volume of hazardous materials handled on site and of the amount of samples obtained.
10. Summarize the enforcement actions (including Notice of Deficiencies, Audit Reports, and
any actions turned over to the Contra Costa County District Attorney’s Office) taken with the
Stationary Source pursuant to Section 450-8.028 of County Ordinance 98-48 (450-8.030(B)(2)
(vii)): There were no enforcement actions during this period.
11. Summarize total penalties assessed as a result of enforcement of this Chapter (450-8.030(3)):
No penalities have been assessed against this facility.
12. Summarize the total fees, service charges, and other assessments collected specifically for
the support of the ISO (450-8.030(B)(4)): The total CalARP Program fees for the seven County ISO facilities
subject to the Industrial Safety Ordinance was $515,347. The total Industrial Safety Ordinance program fees for the seven
County ISO facilities was $317,823. (NOTE: These fees do not include the two City of Richmond ISO facilities).
13. Summarize total personnel and personnel years utilized by the jurisdiction to directly
implement or administer this Chapter (450-8.030(B)(5)): 5518 hours were used to audit/inspect and
issue reports on the Risk Management Chapter of the Industrial Safety Ordinance.
14. Copies of any comments received by the source (that may not have been received by the
Department) regarding the effectiveness of the local program that raise public safety
issues(450-8.030(B)(6)): None.
15. Summarize how this Chapter improves industrial safety at your stationary source (450-
8.030(B)(7)): This chapter has assisted the facility by sharing best practices within the industry and by helping the
facility achieve consistency amongst the various programs regulated by the County and other agencies.
16. List examples of changes made at your stationary source due to implementation of the
Industrial Safety Ordinance (e.g., recommendations from PHA’s, Compliance Audits, and
Incident Investigations in units not subject to CalARP regulations; recommendations from
RCA’s) that significantly decrease the severity or likelihood of accidental releases.
The recent Siting PHA of regulated substances offered recommendations to improve receiving, storing and
distribution of regulated and non-regulated hazardous substances.
The recent Procedural PHA of bulk transfer operations provided actual operating practice improvement
recommendations and clarity of the written operating procedures for both regulated and non-regulated substances.
36
17. Summarize the emergency response activities conducted at the source (e.g., CWS or TEN
activation) in response to major chemical accidents or releases: No MCAR’s occurred during
the past 12 months, this question is N/A.
Annual Performance Review and Evaluation Submittal
June 30, 2014
*Attach additional pages as necessary
1. Name and address of Stationary Source: Phillips 66 Rodeo Refinery, 1380 San Pablo Avenue,
Rodeo, CA 94572
2. Contact name and telephone number (should CCHMP have questions):
Jim Ferris 510-245-4517
3. Summarize the status of the Stationary Source’s Safety Plan and Program (450-8.030(B)
(2)(i)): The Safety Plan was last revised in August 2012 per the 3 year update cycle required by the County.
The plan was made available to the public at the July 21, 2013 Sugartown Festival & Street Fair in Crockett
after addressing comments from the CCHMP review.
4. Summarize Safety Plan updates (i.e., brief explanation of update and corresponding date)
(450-8.030(B)(2)(ii)): The original Safety Plan for this facility was filed with Contra Costa Health Services
on January 14, 2000. A revised plan was filed on April 7, 2000 with the updated recommendations requested
by CCHS. A Human Factors Amendment was submitted on January 15, 2001. In conjunction with CCHSs
required 2nd public meeting on our plan and audit findings, we submitted a complete revision of the plan
to reflect the change in ownership of our facility and to update where needed. We took this opportunity to
include Human Factors within the plan instead of having it as an amendment. On August 9, 2002 the plan
was resubmitted. Public meetings for our plans were held on June 22, 2004 in Rodeo and July 8, 2004 in
Crockett. As required the Plan was fully updated in August 2005 on the 3 year cycle. The Plan was reviewed
by CCHS and was revised on July 28, 2006 with recommended changes. The Safety Plan was updated in July
2009 per the 3 year cycle. Recommendations requested by CCHMP were incorporated into the Safety Plan
11-4-2010. Safety Plan was again updated in August 2012 per the 3 year cycle.
5. List of locations where Safety Plans are/will be available for review, including contact
telephone numbers if the source will provide individuals with copies of the document
(450-8.030(B)(2)(ii)): CCHMP Office at 4585 Pacheco Boulevard, Suite 100, Martinez; Rodeo Public
Library; Crockett Public Library (libraries closest to the stationary source).
6. Provide any additions to the annual accident history reports (i.e. updates) submitted
pursuant to Section 450-8.016(E)(2) of County Ordinance 98-48 (450-8.030(B)(2)(iii)) (i.e.,
provide information identified in Section 450-8.016(E)(1) for all major chemical accidents
or releases occurring between the last annual performance review report and the current
annual performance review and evaluation submittal (12-month history)): There have been no
major chemical accidents or releases (MCARs) during the current reporting year.
37
7. Summary of each Root Cause Analysis (Section 450-8.016(C)) including the status of the
analysis and the status of implementation of recommendations formulated during the analysis
(450-8.030(B)(2)(iv)): There have been no MCARs therefore no RCAs were required in the past year.
8. Summary of the status of implementation of recommendations formulated during audits,
inspections, Root Cause Analyses, or Incident Investigations conducted by the Department
(450-8.030(B)(2)(v)): There are two remaining action items from the 2011 CalARP audit that will be closed this
year with an update to the RMP (October). We expect to receive a preliminary report from CCHMP for an audit
that was conducted in May 2014 of the CalARP and ISO programs.
9. Summary of inherently safer systems implemented by the source including but not limited to
inventory reduction (i.e., intensification) and substitution (450-8.030(B)(2)(vi)): See Attachment 1
for the listing of Inherently Safer Systems improvements.
10. Summarize the enforcement actions (including Notice of Deficiencies, Audit Reports, and
any actions turned over to the Contra Costa County District Attorney’s Office) taken with the
Stationary Source pursuant to Section 450-8.028 of County Ordinance 98-48 (450-8.030(B)(2)
(vii)): There were no enforcement actions during this period.
11. Summarize total penalties assessed as a result of enforcement of this Chapter (450-8.030(3)):
No penalities have been assessed against this facility.
12. Summarize the total fees, service charges, and other assessments collected specifically for
the support of the ISO (450-8.030(B)(4)): The total CalARP Program fees for the seven County ISO facilities
subject to the Industrial Safety Ordinance was $515,347. The total Industrial Safety Ordinance program fees for the seven
County ISO facilities was $317823. (NOTE: These fees do not include the two City of Richmond ISO facilities).
13. Summarize total personnel and personnel years utilized by the jurisdiction to directly
implement or administer this Chapter (450-8.030(B)(5)): 5518 hours were used to audit/inspect and
issue reports on the Risk Management Chapter of the Industrial Safety Ordinance.
14. Copies of any comments received by the source (that may not have been received by the
Department) regarding the effectiveness of the local program that raise public safety
issues(450-8.030(B)(6)): No comments have been received.
15. Summarize how this Chapter improves industrial safety at your stationary source (450-
8.030(B)(7)): In addition to the Phillips 66 Corporate Health Safety Environment Management Systems the ISO
provides another tool for the improvement of process safety performance.
38
16. List examples of changes made at your stationary source due to implementation of the
Industrial Safety Ordinance (e.g., recommendations from PHA’s, Compliance Audits, and
Incident Investigations in units not subject to CalARP regulations; recommendations from
RCA’s) that significantly decrease the severity or likelihood of accidental releases. Units
not covered by RMP, CalARP, and PSM are covered under the ISO and PHAs are scheduled and performed on
all these units. Recommendations from the PHAs are implemented at an accelerated rate. A list of inherently
safer system improvements, required by the ISO for PHA recommendations and projects, are listed in
Attachment 1.
17. Summarize the emergency response activities conducted at the source (e.g., CWS or TEN
activation) in response to major chemical accidents or releases: None have occurred since the last
report.
39
Attachment 1: June 2013—June 2014 ISS improvements
Reference Approach ISS Category MOC Description
M20121605-001 Simplify Inherent Remove the FD Fan and ID Fan turbine drivers from service.
M2013381-003 Simplify Inherent Decommission Plant 4, including removal of all associated graphics, alarming, logic, yoking/registry, and documentation.
M2013437-001 Substitute Passive Replace the existing asphalt in the Selenium Plant Bin Yard with an engineered concrete slab.
M2013915-001 Simplify Inherent Remove the currently installed oversized Biocide injection pumps and install smaller injection pumps to allow continuous injection.
M20132825-001 Substitute Inherent Remove insufficient lights at Butane Loading Rack and add additional lights.
M20133345-001 Simplify Inherent Eliminate the unused water cooling at the jacket pump and bearing housing
M20132090-001 Substitute Passive Upgrade sample station with closed loop at 1D-101 OVHD Naphta Sample off 1G-110
discharge.
M2014607-001 Moderate Passive Replace the API view port doors at the Sludge Ejectors and Roll Drum Skimmers in the
Afterbays with Plexiglas view panels to prevent personnel exposure.
M2014574-001 Substitute Passive Upgrade the spool upstream of 31LV-203 to stainless steel.
M2013682-001 Substitute Passive Upgrade G-104A from Packing to Mechanical Seal
M20134614-001 Simplify Inherent Rewire control circuit to remove unused klixon switch.
M20134607-001 Substitute Passive Replace 500 ft of new carbon steel/HDPE piping to route storm water to Junction Box 1 at Unit
100
M2013458-001 Substitute Passive Upgrade 3-inch Resid Piping from G-218 to D-206 with 317L SS
M20134464-001 Substitute Passive Upgrade the Unit 200 E-525 shell and shell cover metallurgy from 316L SS clad to Alloy 825
clad CS.
M20134437-001 Substitute Passive
Replace existing P-503 conveyor system with a new conveyor comprised of corrosion
resistant rollers, tensioners, and a stainless steel frame. The new conveyor will include the
appropriate roll off bin pad and shelter replacement.
M20134265-001 Simplify Inherent
Remove abandoned piping and associated supports, re-route other piping, and modify
other equipment orientation to improve the access around pumps G-37A/B, G-31, and
G -209.
M2013381-002 Simplify Inherent Remove all Unicracker Triconex SIS (safety instrumented system) interlock programming
associated with out of service Plant 4 equipment.
M2013381-001 Minimize Inherent
Decommission Unit 240 Plant 4 Hydrogen Plant. Major equipment to be isolated and
removed from service; utility and blowdown connections throughout the unit will be
separated and blocked-in from the rest of the Unit 240 complex; hazardous waste will be
removed and disposed.
M20133307-001 Simplify Passive Plug remaining 3 surface drains that are at elevations under 10-feet in U100.
M20132649-001 Simplify Inherent Remove Sample Station on Concord Line
M20131742-001 Substitute Passive
The existing Butane Loading Rack (BLR) vapor arms are mechanically limited from reaching the
vent connection of a rail car when the connection is on the far side of the railcar. This limitation
is due to interference with the personnel fall protection rails. Phase 1 of this project will replace
the last hard piped joint of one vapor recovery arm with a flexible hose.
M20131642-001 Substitute Passive Replace the bundle on exchanger 200: E-108B, upgrade the tube metallurgy from 316 SST to
Incoloy 825.
M20131641-001 Substitute Passive Replace the shell on exchanger 200: E-111A-1, upgrade the metallurgy from CS to Hastelloy
Clad CS.
M20131640-001 Substitute Passive Replace the shell on exchanger 200: E-111A-2, upgrade the metallurgy from CS to Hastelloy
Clad CS.
M20131638-001 Substitute Passive Replace the Administration Building Water Heater heat exchanger, E-603U, with an upgraded
metallurgy (Duplex 2205).
M2013097-002 Simplify Inherent
Plant 4 Catacarb Area Demolition: Demolish all equipment, foundation, instrumentation and
piping in Plant 4. The Catac arb system will be cleaned from the storage tank and removed
from the unit.
M20123996-001 Substitute Passive Replace the entire LCGO line from the tower draw to the suction of the G-216/A pumps with
new 10” line and upgrade the piping metallurgy to 316L per ME&I recommendation.
M20123819-001 Moderate Passive Replace the noisy transformer located in the utility closet in the Unit 80 Control Room. Locate
the new transformer outside of the control room.
M20122408-001 Simplify Passive Upgrade the butane loading rack and rail car sampling stations on both racks so that
samples can be taken without venting any product to atmosphere.
M20121894-001 Substitute Passive Replace temporary underground piping with permanent piping routed above ground for
Decoking Water Line.
M20112915-002 Substitute Passive Replace leaking 10” cement lined firewater pipe with carbon steel
M20101727-003 Moderate Passive Upgrade sample station with closed loop for the D-202 effluent stream.
40
Annual Performance Review and Evaluation Submittal
June 30, 2014
*Attach additional pages as necessary
1. Name and address of Stationary Source: Shell Oil Products U.S. Martinez Refinery, 3485 Pacheco
Blvd., Martinez, CA 94553
2. Contact name and telephone number (should CCHMP have questions): Mary Kay Nye:
925-313-3358
3. Summarize the status of the Stationary Source’s Safety Plan and Program (450-8.030(B)
(2)(i)): SMR’s Safety Plan was last updated in August 2013. SMR’s Safety Program was reviewed by the CCHS
during the CalARP/ISO audit conducted in February 2012.
4. Summarize Safety Plan updates (i.e., brief explanation of update and corresponding date)
(450-8.030(B)(2)(ii)): SMR’s Safety Plan was last updated in August 2013. The changes addressed actions
from the CCHS 2012 audit. The next update is due August 28, 2016.
5. List of locations where Safety Plans are/will be available for review, including contact
telephone numbers if the source will provide individuals with copies of the document
(450-8.030(B)(2)(ii)): CCHMP Office at 4585 Pacheco Boulevard, Suite 100, Martinez; Martinez Public
Library (library closest to the stationary source).
6. Provide any additions to the annual accident history reports (i.e. updates) submitted
pursuant to Section 450-8.016(E)(2) of County Ordinance 98-48 (450-8.030(B)(2)(iii)) (i.e.,
provide information identified in Section 450-8.016(E)(1) for all major chemical accidents
or releases occurring between the last annual performance review report and the current
annual performance review and evaluation submittal (12-month history)): There were no
MCAR’s in the current reporting period (July 1, 2013 to June 30, 2014), and therefore no updates to the
Accident History.
7. Summary of each Root Cause Analysis (Section 450-8.016(C)) including the status of the
analysis and the status of implementation of recommendations formulated during the analysis
(450-8.030(B)(2)(iv)): There were no MCAR’s in the current reporting period (July 1, 2013 to June 30, 2014), and
therefore no RCA’s were required.
8. Summary of the status of implementation of recommendations formulated during
audits, inspections, Root Cause Analyses, or Incident Investigations conducted by the
Department (450-8.030(B)(2)(v)): The status of the recommendations from the February 2012 CalARP/
ISO Audit are: 59 of 60 Action items were completed. The last action will be completed in 2015. All of the
actions from the December 2013 Unannounced Inspection are complete. There have been no RCA’s or
Incident Investigations conducted by the Department.
41
9. Summary of inherently safer systems implemented by the source including but not limited to
inventory reduction (i.e., intensification) and substitution (450-8.030(B)(2)(vi)): See Attachment 1, Table 1
10. Summarize the enforcement actions (including Notice of Deficiencies, Audit Reports, and
any actions turned over to the Contra Costa County District Attorney’s Office) taken with the
Stationary Source pursuant to Section 450-8.028 of County Ordinance 98-48 (450-8.030(B)(2)
(vii)): There were no enforcement actions during this period.
11. Summarize total penalties assessed as a result of enforcement of this Chapter (450-8.030(3)):
No penalities have been assessed against this facility.
12. Summarize the total fees, service charges, and other assessments collected specifically for
the support of the ISO (450-8.030(B)(4)): The total CalARP Program fees for the seven County ISO facilities
subject to the Industrial Safety Ordinance was $515,347. The total Industrial Safety Ordinance program fees for the seven
County ISO facilities was $317823. (NOTE: These fees do not include the two City of Richmond ISO facilities).
13. Summarize total personnel and personnel years utilized by the jurisdiction to directly
implement or administer this Chapter (450-8.030(B)(5)): 5518 hours were used to audit/inspect and
issue reports on the Risk Management Chapter of the Industrial Safety Ordinance.
14. Copies of any comments received by the source (that may not have been received by the
Department) regarding the effectiveness of the local program that raise public safety
issues(450-8.030(B)(6)): None received
15. Summarize how this Chapter improves industrial safety at your stationary source (450-
8.030(B)(7)): SMR has integrated requirements of the Industrial Safety Ordinance into our Health, Safety,
and Environment Management System; in the context of our HSE MS, the ISO requirements drive continual
improvement in our HSE performance.
16. List examples of changes made at your stationary source due to implementation of the
Industrial Safety Ordinance (e.g., recommendations from PHA’s, Compliance Audits, and
Incident Investigations in units not subject to CalARP regulations; recommendations from
RCA’s) that significantly decrease the severity or likelihood of accidental releases. See
Attachment 1, Table 2
17. Summarize the emergency response activities conducted at the source (e.g., CWS or TEN
activation) in response to major chemical accidents or releases: There were no MCAR’s in the
current reporting period (July 1, 2013 to June 30, 2014).
42
ISS Item Number ISS Type Source/Study Description
M20132508-001 Passive /
Moderate
ISS Review of
Existing Units Apply fireproof insulation to DSHT Feed Cooler Supports
M20132414-001 Passive /
Minimize
ISS Review of
Existing Units
Modify routing of the RFG fuel piping from king tool filter to heaters F-66 and F-67
to avoid long run first away from heater and then back to heater.
M20131199-001 Inherent /
Minimize
ISS Review of
Existing Units
Remove Drain Piping from V-485; V-488; V-753; V-755. The drain piping was a
dead-led due to lack of use.
M2010936-001 Passive /
Simplify
ISS Review of
Existing Units Improve CO Boiler Circulation Pumps Isolation
M20103217-001 Passive /
Moderate
ISS Review of
Existing Units
Replace CFH Product (C118) Sample Station Cooler with upgraded metallurgy
and capacity
M2013461-001 Passive /
Moderate
ISS Review of
Existing Units HP1 Replace E809A/B/C bundles, channel, and shells with upgraded materials
M2013813-001 Passive /
Moderate
ISS Review of
Existing Units Re-design of E-729 with upgraded materials and anti vibrations bars
M2013455-001 Passive /
Moderate
ISS Review of
Existing Units Replace SGP EB604A/B bundles with upgraded materials
M20121392-001 Passive /
Moderate
ISS Review of
Existing Units Change From Carbon Steel to Duplex SS Bundle for E-17362
M2012123-001 Passive /
Moderate
ISS Review of
Existing Units E-646A-H Exchanger Bundles - Materials Upgrade
M20113404-001 Passive /
Moderate
ISS Review of
Existing Units EA-804A/B/C/D - Materials upgrade of header boxes due to leaking plug sheets
M2012646-003 Inherent /
Minimize
ISS Review of
Existing Units Remove Caustic Washout Line from Settler, line was a dead-leg
M20122694-001 Active /
Moderate
ISS Review from
Projects
Install Dimersol High Temperature Shutdown to mitigate the risk of vessel
overpressure due to high reactor temperature
M20131049-001 Inherent /
Moderate
ISS Review from
Projects
Enhanced DHT Processing Project - Reduced Air Cooler pressure
drop/backpressure
M20131049-001 Passive /
Minimize
ISS Review from
Projects
Enhanced DHT Processing Project - Added tandem seal pots for Frac Btms
Pumps that vent to flare rather than to atmosphere
M2011147-001 Inherent /
Moderate
ISS Review from
Projects
New Biotreater and Clarifier - Water treatment chemicals injected into top of
tanks rather than into pressurized line
M2011147-001 Inherent /
Substitute
ISS Review from
Projects New Biotreater and Clarifier - Chose air injection rather than pure O2
M2011147-001 Passive /
Simplify
ISS Review from
Projects New Biotreater and Clarifier - Chose open tank rather than covered tank
Table 1. Summary of Implemented ISS
Attachment 1
43
ISS Item Number ISS Type Source/Study Description
M2013227-001 Passive /
Moderate
ISS Review from
Projects
Recovery LPG from Isom Vent - Routing of Vent Gas to Frac Ovhd Drum rather
than WGC 2nd Stage Suction lowers risk of filling KO drum and causing flaring
event.
M20123424-001 Active /
Moderate
ISS Review from
Projects
Install IPF on Columns C-236 and C15602 - Added Instrumented Protective
Function Systems shutdown to avoid liquid full column and release through
Atmospheric Pressure Relief Valves
M20121479-001 Active /
Moderate
ISS Review from
Projects
Upgrade COB1 IPF - Added shutoff valves for RFG, a low air flow trip, and a
high burner pressure trip.
M20121480-001 Active /
Moderate
ISS Review from
Projects
Upgrade COB3 IPF Added shutoff valves for RFG, a low air flow trip, and a high
burner pressure trip.
M20122502-001 Active /
Moderate
ISS Review from
Projects
CGP Column Relief Enhancement - Added new PSV to WGC discharge to
prevent overpressure
M20122502-001 Passive /
Simplify
ISS Review from
Projects
CGP Column Relief Enhancement - Replaced EA-746 with higher design pressure
rating, rerated design pressure for E-747A/B and various piping,
M20122262-001 Inherent /
Moderate
ISS Review from
Projects
F-40 Air Preheater - reduces firing required, hence lower heat flux and operating
conditions.
M20122262-001 Active /
Moderate
ISS Review from
Projects
F-40 Air Preheater - project included provisions to enable lead-lag control of fuel-
to- air ratio, which assures adequate combustion air is always supplied to firebox,
providing an extra degree of safety.
M2013321-004 Active /
Moderate
ISS Review from
Projects
Review CCU CGP PSV's per PHA - Added 3rd PSV to CCU MF to
accommodate new relief scenario
M20121339-001 Inherent /
Substitute
ISS Review from
Projects
DHT Sight Glass Mitigation - Sight glasses replaced by magnetic level indicators to
reduce risk of leakage to atmosphere
M20131790-001 Inherent /
Substitute
ISS Review from
Projects
Isom Sight Glass Mitigation - Sight glasses replaced by magnetic level indicators to
reduce risk of leakage to atmosphere
M2013164-001 Active /
Moderate
ISS Review from
Projects Upgrade Alky IPF - Upgrade existing IPF to latest standards
M20121479-001 Active /
Moderate
ISS Review from
Projects Upgrade CGH IPF - Upgrade existing IPF to latest standards
Table 1. Summary of Implemented ISS (cont)
Number Source Description
R2012046-002 2012 CO Boiler PHA Revalidation Complete SIFPro project to add ZT positioner input to the COB1 ES-
5 and COB3 ES-7 shutdown systems.
R2012046-001 2012 CO Boiler PHA Revalidation Repair piping for raw or alternate water make-up to the CO Bypass
Water seal.
R2012021-007 2012 Flexsorb PHA Revalidation Add a sign at the tank to warn of presence of N2 blanket on tank.
R2012021-006 2012 Flexsorb PHA Revalidation Modify PSV SV 15536 and P-17102 to ease the prepping for
maintenance
R2012021-006 2012 Flexsorb PHA Revalidation Add labeling in field to warn that High H2S is present at sample
station.
R2012021-004 2012 Flexsorb PHA Revalidation Add ESP high level alarm on hydrocarbon drain drum; 19LI211.
Table 2. ISO-only Recommendations Implemented (not required by CalARP)
44
Annual Performance Review and Evaluation Submittal
June 30, 2014
*Attach additional pages as necessary
1. Name and address of Stationary Source: Tesoro Golden Eagle Refinery, 150 Solano Way,
Martinez, CA 94553
2. Contact name and telephone number (should CCHS have questions): Claire Spencer at
925-370-3274, Rich Leland at 925-370-3264 or Sabiha Gokcen at 925-370-3620.
3. Summarize the status of the Stationary Source’s Safety Plan and Program (450-
8.030(B)(2)(i)): An updated Safety Plan was submitted to Contra Costa Health Services on June 1, 2012.
Contra Costa Health Services has completed six audits on the safety programs. The first audit was in
September 2000 on the safety programs. The second audit was in December 2001 and focused
on Inherently Safer Systems and Human Factors. CalARP/ISO audits were conducted in August 2003,
November—December 2005,
August—October 2008, April—May 2011 and most recently January, 2014. All safety program elements
required by the ISO have been developed and are implemented.
4. Summarize Safety Plan updates (i.e., brief explanation of update and corresponding date)
(450-8.030(B)(2) (ii)): The original Safety Plan for this facility was filed with Contra Costa Health Services
on January 14, 2000. An amended plan, updated to reflect CCHS recommendations and ownership change,
was filed on November 30,2000. A Human Factors Amendment was submitted on January 15, 2001. A Power
Disruption Plan was submitted, per Board of Supervisor request, on June 1, 2001. An amended Safety Plan,
updated to reflect ownership change was submitted on June 17, 2002.
The Safety Plan for this facility will be updated whenever changes at the facility warrant an update or
every three years from June 17, 2002. In addition, the accident history along with other information is
updated every year on June 30. Most recently, updated Safety Plan was submitted to Contra Costa Health
Services on June 1, 2012.
5. List of locations where Safety Plans are/will be available for review, including contact
telephone numbers if the source will provide individuals with copies of the document
(450-8.030(B)(2)(ii)): CCHMP Office at 4585 Pacheco Boulevard, Suite 100, Martinez; Martinez Library
(library closest to the stationary source)
6. Provide any additions to the annual accident history reports (i.e. updates) submitted
pursuant to Section 450-8.016(£)(2) of County Ordinance 98-48 (450-8.030(B)(2)(iii)) (i.e.,
provide information identified in Section 450-8.016(£)(1) for all major chemical accidents
or releases occurring between the last accident history report submittal (January 15) and
the annual performance review and evaluation submittal (June 30)): There was one incident
in 2013 meeting the Major Chemical Accident or Release criteria. The incident was a power outage on
November 15, 2013 and was a CWS Level 2 event. Please refer to the attached root cause analysis report.
45
7. Summary of each Root Cause Analysis (Section 450-8.016(C)) including the status of the
analysis and the status of implementation of recommendations formulated during the analysis
(450-8.030(B)(2)(iv)): Status of Root Cause Analysis Recommendations: The recommended action items from
the November 15, 2013 power outage are on schedule for completion in November, 2014.
8. Summary of the status of implementation of recommendations formulated during audits,
inspections, Root Cause Analyses, or Incident Investigations conducted by the Department
(450-8.030(B)(2)(v)): “CCHS Information”: CCHS completed an audit on September 15, 2000, December, 2001,
August, 2003, November/December, 2005, August–October, 2008, April–May 2011 and January, 2014. There
are no RCA or Incident Investigations that have been conducted by the Department.
Facility status of audit recommendations: All recommendations from CCHS audits prior to 2014 are closed. The
recommendations from the 2014 audit have not yet been received by the facility at this time.
9. Summary of inherently safer systems implemented by the source including but not limited to
inventory reduction (i.e., intensification) and substitution (450-8.030(B)(2)(vi)): Golden Eagle is
submitting a list of the Inherently Safer Systems (ISS) that meet the criteria for Inherent or Passive levels only and
that were completed within the last year (see attached).
10. Summarize the enforcement actions (including Notice of Deficiencies, Audit Reports, and
any actions turned over to the Contra Costa County District Attorney’s Office) taken with
the Stationary Source pursuant to Section 450-8.028 of County Ordinance 98-48 (450-
8.030(B)(2)(vii)): “CCHS Information”: none
11. Summarize total penalties assessed as a result of enforcement of this Chapter (450-8.030(3)):
“CCHS information”: No penalties have been assessed against this facility.
12. Summarize the total fees, service charges, and other assessments collected specifically for
the support of the ISO (450-8.030(B)(4)): The total CalARP Program fees for the seven County ISO facilities
subject to the Industrial Safety Ordinance was $515,347. The total Industrial Safety Ordinance program fees for
the seven County ISO facilities was $317823. (NOTE: These fees do not include the two City of Richmond
ISO facilities).
13. Summarize total personnel and personnel years utilized by the jurisdiction to directly
implement or administer this Chapter (450-8.030(B)(5)): “CCHS Information”: 5518 Hours were used to
audit/inspect and issue reports on the Risk Management Chapter of the Industrial Safety Ordinance.
14. Copies of any comments received by the source (that may not have been received by the
Department) regarding the effectiveness of the local program that raise public safety
issues(450-8.030(B)(6)): This facility has not received any comments to date regarding the
effectiveness of the local program.
46
15. Summarize how this Chapter improves industrial safety at your stationary source (450-
8.030(B)(7)): Chapter 450-8 improves industrial safety by expanding the safety programs to all units in
the refmery. In addition, the timeframe is shorter to implement recommendations generated from the
Process Hazard Analysis (PHA) safety program than state or federal law. This has resulted in a faster
implementation of these recommendations.
Chapter 450-8 also includes requirements for inherently safer systems as part of implementing PHA
recommendations and new construction. This facility has developed an aggressive approach to implementing
inherently safer systems in these areas.
Chapter 450-8 has requirements to perform root cause analyses on any major chemical accidents or
releases (MCAR). This facility has applied that rigorous methodology to investigate any MCARs that
have occurred since January, 1999.
Chapter 450-8 requires a human factors program. This facility has developed a comprehensive human
factors program and is in the process of implementing the program.
Chapter 450-8 requires a safety culture assessment. This facility has developed a safety culture
assessment program that meets the requirements in the ordinance.
16. List examples of changes made at your stationary source due to implementation of the
Industrial Safety Ordinance (e.g., recommendations from PHA’s, Compliance Audits, and
Incident Investigations in units not subject to CalARP regulations; recommendations from
RCAs) that significantly decrease the severity or likelihood of accidental releases.
This question was broadly answered under question 15 above. Some examples of changes that have
been made due to implementation of the ordinance are as follows. There are some units that were
not covered by RMP, CalARP or PSM. Those units are now subject to the same safety programs as
the units covered by RMP, CalARP and PSM. They have had PHAs performed on them according to
the timeline specified in the ISO and the PHA recommendations have been resolved on the timeline
specified in the ISO. A list of inherently safer systems as required by the ISO for PHA recommendations
and new construction is attached to this filing as mentioned in the response to question 9. With respect
to Compliance Audits, there was a compliance audit performed in April 2012 in addition to the CCHS
audits mentioned above. All audit findings are being actively resolved. Root Cause Analysis findings and
recommendations for MCARs are listed in the response under question 6.
17. Summarize the emergency response activities conducted at the source (e.g., CWS or TEN
activation) in response to major chemical accidents or releases: Please refer to #6 which has
the CWS classifications for the major chemical accidents and releases as well as any information regarding
emergency responses by agency personnel.
47
Root Cause Analysis Report Tesoro Golden Eagle Refinery November 15, 2013
Power Outage
Summary of Event:
At approximately 11:29 A.M. on November 15, 2013, the Tesoro Golden Eagle Refinery experienced a brief power
outage. The outage resulted in the shutdown of several refinery units and consequent flaring of excess hydrocarbons.
Notifications were made to requisite outside agencies including the Contra Costa County Health Department’s
Hazardous Materials Division (CWS Level 2) and the Bay Area Air Quality Management District. Reportable quantities
of Sulfur Dioxide were detected as a result of the flaring, and requisite notifications were made to the Bay Area Air
Quality Management District. (Note: to detect Sulfur Dioxide emissions, the Hydrogen Sulfide concentration is
measured in the gas going to the flare system; based on this concentration, the amount of Sulfur Dioxide emissions
can be calculated.) No community complaints of odors were received, and the ground level monitors at the refinery’s
perimeter did not indicate any exceedances. Based on odor patrols conducted by Tesoro’s contractor Odor Science and
Engineering (OS&E), no odors were detectable off site. Visible pluming was detected at the Delayed Coker Unit (DCU)
flare. Separately, a hydrocarbon leak and consequent fire occurred at the No. 3 Crude unit. The fire was immediately
extinguished. Power was quickly restored and process units were started up in a controlled manner.
The initiating event of the partial power outage occurred at Switching Station #4 (SS#4). SS#4, which is normally fed
by two separate power feeds, was only being fed by one power feed due to scheduled project work on the electrical
system. Circuit breaker 1420 was feeding power to Bus B while power to Bus A was being fed through tie breaker
1415. A new protection circuit for tie breaker 1415 energized unexpectedly during commissioning of the new
equipment. The energized circuit sent a trip signal to open the tie breaker resulting in loss of power on Bus A Tesoro
electricians and specialty contractors for the project work were on site when the outage occurred and were able to
immediately respond.
A brief primer on electrical systems: Switching stations contain electrical switch gear and are used to distribute electricity.
Substations contain both electrical switch gear and transformers. Substations are used to step down the voltage of the
electricity to feed equipment. When power comes into the refinery, it is at the 12470 Volt level. The voltage needs to
be reduced before the electricity is fed to the process unit equipment; this voltage transformation is the function of the
substation. A Bus is an electrical switchgear conductor internal to the switching station or substation. For reliability
purposes, switching stations and substations have two parallel feeder cables supplying them electricity. A breaker is a
piece of switchgear equipment that can interrupt the electrical current by opening up upon detection of a fault. A tie
breaker is a piece of electrical equipment that performs two functions; it ties the two busses together to make them
parallel as well as can perform the breaker function to interrupt current when a fault is detected.
48
A brief timeline follows:
11:29 hrs:Power failure at Switching Station No. 4
11:40 hrs:Shut down of seven refinery process units
11:44 hrs:CWS Level 1 Notification
11:45 hrs:Power to Switching Station No. 4 restored
11:50 hrs:BAAQMD Notified. Visible plume detected by BAAQMD inspector
11:56 hrs:OS&E personnel dispatched to monitor community
12:10 hrs:CWS Level 2 Notification sent over terminal due to visible plume from DCU flare
12:15 hrs:DCU Flare cleared, visible plume eliminated
12:20 hrs:Fire reported at the No. 3 Crude Unit
12:25 hrs:Fire at the No. 3 Crude Unit extinguished and monitoring commenced
12:27 hrs:BAAQMD inspector arrives on scene
13:15 hrs:BAAQMD inspector leaves facility
14:00 hrs:All Clear notification issued to the refinery
Agency Notification and Response:
The following agencies were immediately notified: Contra Costa Hazardous Materials Program (CCHMP) via the CWS,
the Bay Area Air Quality Management District (BAAQMD} via the CWS, Contra Costa Fire Protection District, and the
Contra Costa County Office of Emergency Services. The following agencies responded with personnel to the scene:
BAAQMD.
[Note: Notifications over the CWS terminal: CWS level 1 notifies CCHMP, Contra Costa OES, and the Contra Costa
Sheriff with a specific message. Additional notice informs BAAQMD, Contra Costa Fire Protection District, Martinez
Police, Antioch Police, Pinole Police and Richmond Police. CWS level 2 notifies CCHMP, Contra Costa OES, Contra
Costa Sheriff and BAAQMD with a specific message. Additional notice informs Contra Costa Fire Protection District,
California Highway Patrol, California Dept. of Health, San Ramon Valley Fire, Martinez Police, Antioch Police, Pinole
Police and Richmond Police. CWS level 3 notifies CCHMP, Contra Costa OES, Contra Costa Sheriff and BAAQMD
with a specific message. Additional notice informs Contra Costa Fire Protection District, California Highway Patrol,
California Dept. of Health, San Ramon Valley Fire, Martinez Police, Antioch Police, Pinole Pollee, Richmond Police, EDIS
and National Weather Service. CWS level 3 also activates sirens and the news media with a shelter in place message.]
Emergency Response Actions:
Operations personnel shut down the units and worked to restore power. Emergency response crews immediately
responded to the scene of the fire at the No. 3 Crude unit and activated the fire water suppression monitors.
Material Released:
Hydrocarbon compounds were routed to the flare system as a result of the emergency shutdown. These compounds
were mostly consumed (burned off) during the combustion process, resulting in the release of Carbon Dioxide and
other gases present during combustion. The refinery flares have a hydrocarbon destruction efficiency of greater than
98% converting any hydrocarbon to Carbon Dioxide. Hydrogen Sulfide in the flare gas is oxidized to Sulfur Dioxide. The
consequent sulfur dioxide emissions exceeded 7,000 lbs.
49
Meteorological Conditions:
The weather was clear, with wind direction varying from 200 to 330 degrees (wind blowing toward the ESE to ENE).
The wind speed varied from 1.5 to 9.5 MPH. The temperature was about 62 degrees F minimum at 11:30 AM and
warmed to about 66 degrees F at 2:00 PM.
Injuries:
No injuries were reported on or off site.
Community Impact:
No community complaints were received. The Bay Area Air Quality Management District reported evidence of visible
pluming.
Incident Investigation of the event:
This investigation focused mainly on the unexpected trip of tie breaker 1415, causing the breaker to “Open” and
subsequent loss of power to process units.
Background:
Under normal conditions, Switching Station #4 (SS#4) is fed by two separate feeders (1107 & 1108) from Foster
Wheeler (FW). Each feeder has a breaker at FW and a corresponding breaker at SS#4. Both feeders are joined together
via a normally closed tie breaker (1415). Feeder 1107 goes to breaker 1410 then to Bus 4A. Feeder 1108 goes to breaker
1420 then to Bus 4B. Bus 4A and 4B are joined together by the normally closed tie breaker 1415. SS#4 feeds power to a
number of other switching stations and substations in the refinery.
There is a protective system consisting of various relays at SS#4. Protective relays act to protect switching station
equipment from potentially damaging electrical faults by immediately isolating the equipment if a fault is detected.
A Protective relay is a piece of equipment that monitors specific electrical parameters such as current, voltage,
temperature and breaker positions. They have pre-programmed alarms and trip values that if exceeded will cause the
protective relay to act opening the appropriate breaker. This action occurs automatically upon fault detection and
isolates the electrical equipment as close to the fault as possible while continuing to power other devices not affected
by the fault.
On November 15, a project was under construction to improve the reliability of the electrical system at the refinery.
The objective of the project was to add line differential protection against faults occurring between the FW breakers
and Tesoro’s breakers on eight feeders and to install an additional level of protection at tie breaker 1415 to
increase reliability of the overall protection scheme. Line differential protection is a system to measure the current
leaving FW and arriving at the switching station. If there is an electrical short somewhere in this path, a differential in
the current will be detected indicating a problem in the system; the line differential protection equipment would then
act to open breakers to isolate the electrical issue. In order to Install the new equipment, one feeder to SS#4 had to be
isolated and was no longer supplying power to the switching station. (This means during the period of this work, the
normal “double ended” switching station becomes “single ended”. “Double ended” refers to the switching station having
two feeders to it, which decreases the likelihood of a power interruption. “Single ended” refers to the switching station
having only one feeder to it supplying power.)
50
The work on the switching station was expected to last approximately two weeks. Due to the length of time the
switching station would be “single ended”, an MOC was prepared and a PHA performed for this unusual mode of
operation. On November alh, feeder 1107 to Bus 4A was isolated to begin the work.
Partial Power Outage at 55#4:
On Thursday November 15, at approximately 11:18 PST while SS#4 was “single ended”, the recently installed
protection circuitry for tie breaker 1415 unexpectedly energized. The circuitry energized when the last test switch was
closed during the commissioning of the new circuit. This sent a spurious trip signal to breaker 1415, which opened as
part of its designed function to protect against detected faults.
The opening of tie breaker 1415 caused a complete loss of power to Bus A at SS#4. As a result of losing power at Bus A,
all downstream switching stations and substations lost power. This power loss resulted in the loss of several refinery
units including the Fluidized Catalytic Cracking Unit (FCCU), Sulfuric Acid Plant, Sulfur Recovery Unit (SRU), No. 2
Hydrogen Desulfurization Unit (2 HDS), No. 5 Gas Plant, No. 4 Gas Plant, and the No. 3 Crude Unit.
During the investigation, it was found that the newly installed backup protection circuit for the tie breaker 1415 contained
a Direct Current (DC) polarity sensitive (+ I -) surge suppressor component, which was not installed correctly. Even through
the positive of the new suppressor component was connected to the DC positive voltage as shown on the switchgear
manufacturer’s drawings, it was determined the reason for the incorrect installation was because the original factory drawings
for SS#4 switchgear indicated the opposite (wrong) polarity at the connection point of the new surge suppressor. Note: SS#4 is
approximately 30 years old; the drawing was from the original installation of the switching station.
A procedure had been developed to install and commission the line differential protection equipment by a specialty
contractor company who is familiar with this type of work. They were given the original factory drawings for SS#4 and
developed the procedure from this Information.
The investigation also revealed that the surge suppressor product information from the manufacturer did not clearly
describe its behavior in relation to polarity, nor did it describe proper testing procedures for the equipment. The surge
suppressor was one of the pieces of equipment being installed as part of the line differential protection. In
addition, the investigation team noted that the commissioning procedure failed to recognize that the circuit was
polarity sensitive, and therefore did not include steps to verify that the surge suppressor component was installed
in the correct position. During the commissioning of the circuit, the trip circuitry energized unexpectedly when the
test switch was manually closed. The energized trip circuitry sent a spurious trip signal to breaker 4115 to trip “Open”,
resulting in complete loss of power on Bus A of SS#4.
Root Causes:
The causal analysis for this incident yielded the following root causes and corrective actions (see table):
Root Cause #1: Existing procedures for working on in-service electrical equipment did not contain adequate
requirements to prevent power supply interruptions while work is being performed.
Root Cause #2: The original factory switch gear drawing for SS#4 contained an error regarding the polarity at the
point of connection for the new trip circuit. The source of the error was not able to be determined.
Root Cause #3: The electrical installation procedures and manufacturer product information did not adequately
address the hazard of the polar sensitivity of new equipment and proper testing to verify correct installation.
51
Corrective Actions
Corrective Actions
Anticipated
Date of
Completion
Root
Cause
1
Review refinery Rules and Standing Instructions
and electrical procedures regarding working on in- service
electrical equipment. As applicable, revise these documents to
include the implementation of a workflow process to ensure
multi-discipline review prior to performing any work on in-service
electrical equipment. Include the requirement that as part of the
multi-discipline review, a plan will be developed to prevent power
supply interruptions while work is being performed should be
developed along with a hazard mitigation plan in the event that
power supply is interrupted.
11/30/14 1
2
Correct the original factory switch gear drawings to indicate
the correct polarity of the trip circuit (note: this will require
polarity testing to obtain the necessary information to correct the
drawings)
11/30/14 2
3
Review electrical system installation procedures and schematics
and revise as applicable to clearly indicate the hazard of polarity
sensitivity of new equipment and account for testing of correct
circuit polarity prior to commissioning of equipment
11/30/14 3
52
Inherently Safer Systems Implemented
Item Identifier Implementation
Categmy
Risk Reduction
Categmy ISS Approach
A055-2009-001 PHA Passive
Moderate – Incorporation of equipment
design features which reduce the potential
to release hazardous material.
A055-2009-004 PHA Inherent
Eliminate – Eliminated the hazard by removal
of hazardous material equipment and potential
release points.
A068-2009-002 PHA Passive
Moderate – Incorporation of equipment design
features which reduce potential to release
hazardous material.
A082-2006-189 PHA Passive
Moderate – Incorporation of equipment design
features which reduce the potential to release
hazardous material.
PTS 12524 Project Passive Minimize – Reduction of hazardous material
inventory.
PTS 12375 Project Passive
Minimize – Reduction of hazardous material
inventory.
MOC 9451 Project Passive
Moderate – Incorporation of equipment design
features which reduce the potential to release
hazardous material.
MOC 9681 Project Passive
Moderate – Incorporation of equipment design
features which reduce the potential to release
hazardous material.
MOC 9714 Project Passive
Moderate – Incorporation of equipment design
features which reduce the potential to release
hazardous material.
53
INDUSTRIAL SAFETY ORDINANCE
4585 Pacheco Blvd. Suite 100
Martinez, CA 94553
ccchazmat@hsd.cccounty.us