Loading...
HomeMy WebLinkAboutMINUTES - 10212014 - C.14RECOMMENDATION(S): APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and Water Conservation District (FC District), or designee, to execute an on-call Consulting Services Agreement (Agreement) with GEI Consultants, Inc. (Consultant), in an amount not to exceed $500,000 to provide on-call professional engineering services relating to facility conditions assessment, effective October 1, 2014 through October 1, 2017, Countywide. FISCAL IMPACT: All costs associated with this Agreement will not exceed $500,000 and will be funded 100% by FC District Funds or Road Funds under various project specific activities. BACKGROUND: The FC District provides regional flood protection, technical information, hydrology data and education to cities and residents, and environmental stewardship for over 70 miles of streams and several detention basins as part of the County’s flood protection system. The FC District is initiating a facility conditions assessment program for its flood control facilities, which includes, among other facilities, concrete channels, earthen channels, steel structures, APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 10/21/2014 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Carl Roner (925) 313-2213 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: October 21, 2014 David Twa, County Administrator and Clerk of the Board of Supervisors By: Stacey M. Boyd, Deputy cc: D. Twa, County Administrator, T. Geiger, County Counsel's Office, B. Campbell, County Auditor-Controller's Office, L. Watters, County Auditor-Controller's Office, M. Carlson, Flood Control, Paul Detjens, Flood Control, C. Roner, Flood Control, E. Balita, Flood Control, C. Windham, Flood Control C. 14 To:Contra Costa County Flood Control District Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:October 21, 2014 Contra Costa County Subject:On-Call Consulting Services Agreement with GEI Consultants, Inc., Countywide. (100% Flood Control and Road Funds) BACKGROUND: (CONT'D) drop structures, levees, detention basins, and other hydraulic structures (each referred to as “Facility”). The FC District, at times, requires additional temporary services from persons specially trained, experienced, expert, and competent to perform professional engineering and technical services required for Facility conditions assessment. For that reason, the FC District is entering into this Agreement with Consultant. Under this Agreement, Consultant will provide professional engineering and technical services relating to Facility conditions assessment on an on-call basis for a variety of FC District projects throughout Contra Costa County. CONSEQUENCE OF NEGATIVE ACTION: Without the approval of the Board of Supervisors, the FC District will be unable to obtain on-call services for professional engineering and technical services relating to Facility conditions assessment. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS GEI Agreement