HomeMy WebLinkAboutMINUTES - 08122014 - D.5RECOMMENDATION(S):
ACCEPT public testimony and CLOSE the appeal hearings on the permit for 801 Coventry Road and the permit for
110 Ardmore Road.
OPTION A, to approve the permit for Ardmore Road:
1. FIND that the proposed project is categorically exempt from the California Environmental Quality Act - Class 3
(CEQA Guidelines section 15303(d)).
2. DENY the appeals of Kevin and Michelle Ferguson, and Laura Owen, Kellin Cooper, Krista Bessinger, John
Sarlin, and David Kwett.
3. SUSTAIN the decision of the County Planning Commission to approve the land use permit to install a wireless
telecommunications facility at 110 Ardmore Road in Kensington (Permit No. LP13-2020).
4. ADOPT the findings contained in County Planning Commission Resolution No. 15-2013.
5. DIRECT staff to file a California Environmental Quality Act Notice of Exemption with the County Clerk and pay
the statutory filing fee.
6. ACCEPT the withdrawal by AT&T of its permit application for 801 Coventry Road.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 08/12/2014 APPROVED AS RECOMMENDED OTHER
Clerks Notes:Adopted Option A
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Francisco Avila, (925)
674-7801
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: August 12, 2014
David Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc:
D. 5
To:Board of Supervisors
From:John Kopchik, Interim Director, Conservation & Development Department
Date:August 12, 2014
Contra
Costa
County
Subject:Appeal of the County Planning Commission's Approval of LP13-2020, for a Wireless Cell Site in the Kensington
Area (110 Ardmore Road).
RECOMMENDATION(S): (CONT'D)
OPTION B, to approve the permit for Coventry Road:
1. FIND that the proposed project, to install a wireless telecommunications facility at 801 Coventry Road in
Kensington, is categorically exempt from the California Environmental Quality Act - Class 3 (CEQA Guidelines
section 15303(d)).
2. DENY the appeal of Chris Hall.
3. SUSTAIN the decision of the County Planning Commission to approve the land use permit to install a wireless
telecommunications facility at 801 Coventry Road in Kensington (Permit No. LP14-2014).
4. ADOPT the findings contained in County Planning Commission Resolution No. 8-2014.
5. DIRECT staff to file a California Environmental Quality Act Notice of Exemption with the County Clerk and
pay the statutory filing fee.
6. ACCEPT the withdrawal by AT&T of its permit application for 110 Ardmore Road.
FISCAL IMPACT:
The applicant has paid the initial application deposit and is obligated to pay supplemental fees to cover any and all
additional staff time and material costs associated with the processing of this application.
BACKGROUND:
This is a continued public hearing item on the appeal of Kevin and Michelle Ferguson, and Laura Owen, Kellin
Cooper, Krista Bessinger, Jon Sarlin and David Kwett of the County Planning Commission's decision to approve
a proposal by New Cingular Wireless (AT&T) to attach a wireless telecommunications facility to an existing
utility pole in the Ardmore Road public right-of-way in Kensington. The Board has indicated that visual
intrusiveness is a concern at the 110 Ardmore Road site and gave the applicant specific direction to pursue County
approval of an alternative site located at 801 Coventry Road. In response, AT&T submitted County File
#LP14-2014 on March 17, 2014. That application was unanimously approved by the County Planning
Commission on May 13, 2014. An appeal of that decision was received on May 23, 2014. As County File #'s
LP13-2020 and LP14-2014 are related, both appeals were heard simultaneously by the Board at the July 8, 2014,
hearing. After opening the public hearing, receiving public testimony, and deliberating, the Board continued both
items to August 12, 2014. The continuance was in order to allow staff sufficient time to have AT&T's coverage
maps reviewed by an independent consultant.
Since the July 8, 2014, Board hearing, staff was able to procure the services of RCC Consultants, Inc. (consultant).
This consultant was chosen primarily due to their recent work in the cities of El Cerrito, Berkeley, and Albany
and the fact that they were able to complete the review in an expedited manner. The consultant reviewed AT&T's
justification (coverage maps) for the proposed facility at this location and concluded that a coverage gap does
exist in the Ardmore Road area (see report for LP14-2014, being considered concurrently, for additional detail).
Therefore, staff recommends that the Board of Supervisors deny the appeals of Kevin and Michelle Ferguson, and
Laura Owen, Kellin Cooper, Kim Bessinger, Jon Sarlin, and David Kwett, and sustain the County Planning
Commission's approval of County File #LP13-2020. Alternatively, if the Board of Supervisors determines that the
proposed facility location behind 801 Coventry Road is a more appropriate site for AT&T's equipment, approve
that application, County File #LP14-2014 and accept AT&T's withdrawal of this application.
CONSEQUENCE OF NEGATIVE ACTION:
If the Board of Supervisors grants the appeal, the County Planning Commission's approval will be overturned and
AT&T will not have the authority to construct their proposed project at 110 Ardmore Road.
CHILDREN'S IMPACT STATEMENT:
None.
CLERK'S ADDENDUM
ClOSED the hearing; APPROVED the permit for Ardmore Road; FOUND that the proposed project is
ClOSED the hearing; APPROVED the permit for Ardmore Road; FOUND that the proposed project is
categorically exempt from the California Environmental Quality Act - Class 3 (CEQA Guidelines section
15303(d)); DENIED the appeals of Kevin and Michelle Ferguson, and Laura Owen, Kellin Cooper, Krista
Bessinger, John Sarlin, and David Kwett; SUSTAINED the decision of the County Planning Commission to
approve the land use permit to install a wireless telecommunications facility at 110 Ardmore Road in
Kensington (Permit No. LP13-2020); ADOPTED the findings contained in County Planning Commission
Resolution No. 15-2013; DIRECTED staff to file a California Environmental Quality Act Notice of Exemption
with the County Clerk and pay the statutory filing fee; ACCEPTED the withdrawal by AT&T of its permit
application for 801 Coventry Road.
ATTACHMENTS
Planning Commission Resolution
Conditions of Approval
CPC Approved Plans
Photosims
Coverage Gap #1
Coverage Gap #2
Coverage Gap Peer Review
COA - 1
FINDINGS AND CONDITIONS OF APPROVAL FOR COUNTY FILE #LP13-2020;
NEW CINGULAR WIRELESS – AT&T MOBILITY (Applicant), CONTRA COSTA
COUNTY/NORTHERN CALIFORNIA JOINT POLE ASSOCIATION (Owners)
FINDINGS
A. Growth Management Performance Standards
1. Traffic: The project will not significantly increase existing traffic levels in the area.
However, there will be a temporary increase in traffic as a result of the co nstruction
phase of the project which is anticipated to take 5-7 days. The applicant will be required
to obtain an encroachment permit from the Public Works Department, as this project is
located within the public right-of-way. One additional truck and employee may be
temporarily located at the work site to assist in traffic management. The facility will
require routine maintenance which will be 1 to 2 visits a month. Street parking is
available in the immediate area to accommodate maintenance vehicles. According to
County records, no other wireless pro viders are currently proposed at this site.
2. Water: The proposed equipment will be located on an existing utility pole; therefore,
staff is not recommending vegetative screening for this project. Consequently, the
project will not increase the demand for water supplies in the area or for the subject site.
Additionally, the East Bay Municipal Utilities District has reviewed the project and has
indicated that they did not have any concerns with the proposal as submitted.
3. Sanitary Sewer: The project will not increase the demand for sanitary sewer service in the
area as the project is to be un-manned. Therefore, the project does not involve any toilets
or sanity sewer facilities. The Stege Sanitary District has reviewed the project submittal
and has returned an Agency Comment Request indicating that they did not have any
comments on this application.
4. Fire Protection: The project will not significantly increase the demand for fire protection
at the site. There are no fuel cells or back-up generators proposed for this site.
5. Public Protection: The project will not increase the demand for police service facilities; on
the contrary, the project will improve wireless telecommunication services in the area
which is considered to be a benefit during emergency situations .
6. Parks & Recreation: The project will not increase the demand for parks or recreation
facilities, as the project will not increase the housing stock in the County.
7. Flood Control & Drainage: The subject site is not located within a Federal Emergency
Management Agency-designated special flood hazard zone. Therefore, the project will
not create a hazard associated with any existing physical conditions at the site.
COA - 2
B. Land Use Permit Findings
1. That the proposed project shall not be detrimental to the health, safety and general welfare of the
County.
Finding: As previously mentioned, the Federal Communications Commission (FCC) has
adopted standards for public exposure, as well as , occupational exposure to electro-
magnetic fields (EMF). Compliance with these standards is considered to be evid ence
that the project does not present health and safety risks. Therefore, the applicant has
submitted an EMF report, dated August 20, 2013, indicating that the EMF strength for
this project falls within the FCC limit for public exposure.
2. That the proposed project shall not adversely affect the orderly development within the County or
the community.
Finding: The proposed equipment is so compact and innocuous that granting AT&T a
10 year conditional use permit for the installation and operation of the proposed project
cannot reasonably be expected to influence the orderly development of property within
the County. Additionally, as discussed in the staff report, the project as conditioned is
consistent with applicable policies of the County’s 2005-2020 General Plan for the
Kensington area, as well as, the 1998 Telecommunications Policy.
3. That the proposed project shall not adversely affect the preservation of property values and the
protection of the tax base within the County.
Finding: The project site is located within the Ardmore Road right-of-way. As proposed,
the project would not require the existing pole to be extended to accommodate the 2
antennas and associated electrical equipment. According to the photographs of the
subject pole as seen from adjacent properties, the project will not block any views and
only represent a minor change to the physical conditions of the site and area .
Furthermore, no tree removal is required to attach the proposed electrical equipment to
the pole or to establish the required electrical power for the facility.
Due to the relatively small scope of the project, staff does not anticipate that the
operation of one cell site at the subject location will limit the potential range of uses at
the site or on adjacent properties. No evidence has been provided to staff that confirms
cell sites lower property value. Therefore, the project will not adversely affect the
preservation of property values and the protection of the tax base within the County.
4. That the proposed project as conditioned shall not adversely affect the policy and goals as set by
the General Plan.
Finding: The General Plan designation for the site is Single -Family Residential-High
Density (SH). Accordingly, the site in general is primarily developed with single-family
homes, streets, sidewalks and the public utilities which serve the area . As new services
are made available to residential customers (e.g., satellite cable and associated
antennas), the supporting infrastructure must be upgraded to address the new services.
The wireless technology proposed with this application , will allow AT&T to attach two
COA - 3
relatively small antennas and associated electrical equipment to an existing utility pole
in the public right-of-way. The subject pole currently supports electrical power, cable
and telephone landline services. Therefore, AT&T’s proposal is consistent with the
existing uses at the site, immediate area and intent of the SH General Plan designation
in which it is situated.
The 2005-2020 Contra Costa County General P lan also prescribes that many localized
scenic vistas, major ridgelines and views of the San Francisco Bay/Delta area, are
components of the County’s environmental setting which are perceived by many as
desirable. The General Plan policies for the Kensington area provide that items such as;
parking, views and design compatibility should be considered as part of the application
process. As conditioned, the proposed equipment will not block any views currently
had by adjacent residents. The photosimulations submitted for this project; show that
the slim design of the equipment will reduce the visual intrusiveness of the proposed
equipment. Therefore, the proposed wireless telecommunications facility complies with
the policies and goals set by the General Plan for the Kensington area.
5. That the proposed project shall not create a nuisance and/or enforcement problem within the
neighborhood or community.
Finding: The project, as conditioned, will not create a nuisance and/or enforcement
problem within the neighborhood or community. There has been no record of code
enforcement issues with these types of facilities . Nevertheless, the applicant has
submitted a noise study dated July 30, 2013, indicating that the equipment proposed
will meet the 2005-2020 Contra Costa County General Plan residential noise limits.
Furthermore, if approved, the applicant will be required to submit 3-year condition of
approval compliance reviews in order for the County to evaluate the on-going
compliance efforts by AT&T.
6. That the proposed project as conditioned shall not encourage marginal development within the
neighborhood.
Finding: The proposed cell site is consistent with the allowable uses in R -6,-TOV,-K
Zoning District. The R-6,-TOV,-K Zoning District also clearly defines the other types of
uses determined to be appropriate for the su bject site and area. The project will increase
the wireless services to an area of the County currently experiencing poor
coverage/capacity. Therefore, staff does not anticipate that the project will encourage
marginal development within the neighborhood.
7. That special conditions or unique characteristics of the subject property and its location or
surroundings are established.
Finding: Kensington is unique with its steep slopes and undulating topogr aphy. Cell
sites require a reasonably clear line -of-sight to function properly. As a result, AT&T has
proposed to install the subject project, as well as five other strategically placed cell sites
to accommodate for the line-of-sight challenges in the area. The subject site is located
within the public right -of-way along Ardmore Road and does not require the removal
COA - 4
of any trees or grading. There are no other concurrent applications that propose to
develop this site. Therefore, establishment of the subject wireless facility will not
significantly alter the physical or visual characteristics that currently exist at the site or
within the immediate vicinity.
CONDITIONS OF APPROVAL
Project Approval
1. ____ ____ Development is approved as generally described in the application materials
received by the Department of Conservation and Development/Community
Development Division (CDD) on, January 24, 2013 (revised plans dated, June 19,
2013) and subject to the conditions below.
Administrative Review
2. ____ ____ This land use permit is granted for a period of ten (10) years and shall be
administratively reviewed at three -year intervals. The applicant shall initiate the
first review by submitting a statement as to the current status of the project to CDD
no later than three (3) years following the effective date of the project approval. This
review by CDD will be for the purpose of ensuring continued compliance with the
conditions of permit approval.
Non-compliance with the approved conditions and/or the ordinance cod e
provisions after written notice thereof shall be cause for revocation proceedings.
For the review of existing commercial wireless telecommunication facilities,
submittal shall include photo documentation of existing conditions and equipment
for comparison with the applicable approved conditions.
The applicant is encouraged, at the time of each administrative review, to review the
design of the telecommunications facility and make voluntary upgrades to the
facility for the purpose of improving safety and lessening visual obtrusiveness.
A review fee in the amount of $500.00 (subject to time and materials) will be filed
through a Compliance Review Application to allow for review of the approved
conditions.
Initial Compliance Report Required Prior to the Issuance of a Building Permit
3. ____ ____ 30 days prior to the issuance of a building permit, the applicant shall submit a
report addressing compliance with the conditions of appro val for review and
approval by CDD staff. The report shall list each condition followed by a description
of what the applicant has provided as evidence of compliance with that condition.
CDD staff may reject the report if it is not comprehensive with respect to applicable
requirements for the requested permit. The deposit for review of the Compliance
Report is $500.00; the actual fee shall be time and materials.
COA - 5
Replacement of Equipment
4. ____ ____ The replacement of existing equipment may be done administrative ly (without the
submittal of a Land Use Permit) after review and approval by CDD staff. The
replacement of equipment will need to conform to the following:
A. The proposed replacement equipment will not create a greater visual impact on
the surrounding area and will not increase the risk to public health or safety;
and
B. Will not otherwise conflict with the permit conditions.
An additional review fee in the amount of $500.00 (subject to time and materials)
will be filed through a Compliance Verification Application to allow for review of
the equipment to be replaced. This condition shall not require prior approval to
replace malfunctioning equipment where necessary to restore or maintain service.
Nothing in this condition shall excuse the applicant from obtaining a building or
electrical permit where otherwise required under the applicable code.
A new land use permit approval will be necessary prior to the installation of any
equipment that does not satisfy Criteria A and B above, or prior to co -location by
another carrier.
Financial Assurance
5. ____ ____ 30 days prior to the issuance of a building permit, the applicant or permittee shall
provide financial guarantee, which shall be indexed annually for inflation,
satisfactory to CDD staff, for the removal of the facility in the event that the use is
abandoned or the use permit expires, or is revoked, or otherwise terminated.
If the owner or lessee does not remove a ny obsolete or unused equipment, as
described above, the financial guarantee shall be used by the County to remove any
obsolete or unused facilities and to return the site to its pre-development condition.
Any unused financial guarantee shall be returned to the applicant upon termination
of the use and removal of the facility or transfer of the lease accompanied by a
financial guarantee by the new lessee or owner.
Removal of Facility/Site Restoration
6. ____ ____ All structures and equipment associated with the applicant’s commercial wireless
telecommunications facility shall be removed within 30 days of the discontinuance
of the use and the site shall be restored by the permittee to its original pre-
development condition.
In the event that County staff receives confirmation that the overhead utilities
attached to this pole are to be undergrounded, the applicant shall remove the
subject wireless facility within 30 days of written notice by this Department.
Additionally, in the event a macro site is developed, or another alternative is
COA - 6
discovered that allows for the removal of the subject site while still providing the
permittee an opportunity to provide the intended coverage, the permittee shall
remove the approved equipment in favor the of the visually less intrusive
alternative.
General Provisions
7. ____ ____ Any deviation from or expansion beyond the limits of this permit approved under
this application may require the filing and approval of a request for modification of
the Land Use Permit.
8. ____ ____ The conditions contained herein shall be accepted by the applicant, his agents,
lessees, survivors or successors for continuing obligation.
9. ____ ____ All commercial wireless telecommunication facilities shall comply at all times with
all Federal Communications Commission (FCC) rules, regulations and standards,
and any other applicable federal, state or County law or regulation.
10. ____ ____ Facilities shall be operated in such a manner so as not to contribute to ambient
RF/EMF emissions in excess of then current FCC adopted RF/EMF emission
standards.
11. ____ ____ The equipment and accessory structures shall be maintained in good condition over
the term of the permit. This shall include keeping the lease area clean and free of
trash accumulation and the structures graffiti-free. In the event a piece of equipment
needs to be repainted, the applicant shall paint the entire unit to ensure a uniform
appearance.
12. ____ ____ Antennas, cabinets and mountings shall not be used for advertising.
13. ____ ____ No lights and no signage beyond what is required by this permit and the Federal
Communications Commission shall be allowed.
Frequency Interference
14. ____ ____ 30 days prior to the issuance of a building permit, the applicant shall submit a
letter, on AT&T letterhead, agreeing to participate in a County-wide program to
resolve frequency interference problems.
Exterior Noise
15. ____ ____ Within 30 days of issuance of the final building permit, the applicant shall submit
evidence for review and approval by the CDD staff that the wireless
telecommunications facility meets acceptable exterior noise level standards as
established in the Noise and Land Use Compatibility Guidelines contained in the
Noise Element of the County General Plan. The noise levels considered for this site
shall be the aggregate of the approved equipment, as well as, any existing
equipment on the subject pole. The evidence shall include actual noise monitoring
COA - 7
data recorded at the site. The report shall be prepared by a consultant chosen by
CDD staff and paid for by the applicant.
The facility shall be kept in good working order at all times so that noise levels do
not increase above 60 decibels over the life of the project. If the noise emanating
from the facility increases above 60 decibels for any reason, then the applicant shall
take immediate corrective action (for example, replace the fan).
Camouflaging
16. ____ ____ A. All proposed antennas, antenna supports, and conduits shall have a non-
reflective finish. Paints with a reflectivity less than 55 percent are required. All
equipment shall be painted to match its surroundings (e.g., light brown for the
antennas, supports and equipment boxes).
B. Color photographs showing the as-built condition shall be submitted for review
of the CDD staff to verify compliance with this Condition of Approval within 30
days of completing construction.
17. ____ ____ Prior to construction, the applicant, CDD and Public Works Department must
engage adjacent neighbors to identify and provide the least impactful aesthetic
options for the proposed project (e.g., colors) to ensure the project is consistent with
this particular residential street.
Work Restrictions
18. ____ ____ The applicant shall make a good faith effort to minimize project -related disruptions
to adjacent properties, and to nearby uses. This shall be communicated to all project-
related contractors and maintenance personnel.
19. ____ ____ The project sponsor shall require their contractors and subcontractors to fit all
internal combustion engines with mufflers which are in good condition and shall
locate stationary noise-generating equipment such as air compressors as far away
from existing residences as possible.
20. ____ ____ The site shall be maintained in an orderly fashion. Following the cessation of
construction activity, all construction debris shall be removed from the site.
21. ____ ____ Non-emergency maintenance, construction, and other activities on the site related to
this use are restricted to the hours of 8:30 A.M. to 5:00 P.M., Monday through
Friday, and shall be prohibited on State and Federal holidays on the calendar dates
that these holidays are observed by the State or Federal government as listed below:
New Year’s Day (State and Federal)
Birthday of Martin Luther King, Jr. (State and Federal)
Washington’s Birthday (Federal)
Lincoln’s Birthday (State)
President’s Day (State and Federal)
COA - 8
Cesar Chavez Day (State)
Memorial Day (State and Federal)
Independence Day (State and Federal)
Labor Day (State and Federal)
Columbus Day (State and Federal)
Veterans Day (State and Federal)
Thanksgiving Day (State and Federal)
Day after Thanksgiving (State)
Christmas Day (State and Federal)
For specific details on the actual day the state and federal holidays occur, please
visit the following websites:
Federal Holidays:
http://www.opm.gov/Operating_Status_Schedules/fedhol/2013.asp
California Holidays:
http://www.ftb.ca.gov/aboutFTB/holidays.shtml
Party Responsib le for Permit Compliance
22. ____ ____ The permittee (wireless facility operator) is responsible for keeping CDD informed
of who is responsible for maintenance of compliance with this permit and how they
may be contacted (e.g. mailing and email addresses , telephone number) at all times.
A. 30-days prior to the issuance of a building permit, the permittee shall provide
the name of the party (carrier) responsible for permit compliance and their
contact information.
B. Should the responsible party subsequently change (e.g., facility is acquired by a
new carrier), within 30 days of the date of the change, the permittee shall issue
a letter to CDD on the name of the new party who has been assigned permit
compliance responsibility and their contact information. Failure to satisfy this
condition may result in the commencement of procedures to revoke the permit.
Application Costs
23. ____ ____ This application is subject to an initial application deposit of $2,700.00 which was
paid with the application submittal, plus time and material costs if the application
review expenses exceed 100% of the initial deposit. Any additional costs due must
be paid within 60 days of the permit effective date or prior to use of the permit,
whichever occurs first. The applicant may obtain current costs by contacting the
project planner. If you owe additional fees, a bill will be sent to you shortly after
permit issuance.
COA - 9
PUBLIC WORKS CONDITIONS OF APPROVAL
Applicant shall comply with the requirements of Title 8, Title 9 and Titl e 10 of the Ordinance
Code. Any exception(s) must be stipulated in these Conditions of Approval. Conditions of
Approval are based on the site plans submitted to the Department of Conservation and
Development, Community Development Division, on June 19, 2013.
COMPLY WITH THE FOLLOWING CONDITIONS OF APPROVAL PRIOR TO ISSUANCE OF
A BUILDING PERMIT AND PRIOR TO INITIATION OF THE USE PROPOSED UNDER THIS
PERMIT.
Access to Adjoining Property - Proof of Access
24. ____ ____ Applicant shall furnish proof to the Public Works Department of the acquisition of
all necessary rights -of-way, rights of entry, permits, and/or easements for the
construction of off-site, temporary or permanent, public and private road and
drainage improvements and cell site improvements.
Encroachment Permit
25. ____ ____ Applicant shall obtain an encroachment permit from the Application and Permit
Center for construction of improvements within the right -of-way.
Proof of Franchise Agreement/Owner of Light Pole Authorization
26. ____ ____ For cell sites within the public right -of-way, the applicant shall provide evidence to
the Public Works Department, Real Property Division that they are included in the
statewide franchise agreement issued by the CPUC (California Public Utilities
Commission); or, if unable to do so, the applicant shall enter into a license
agreement with the County.
ADVISORY NOTES
ADVISORY NOTES ARE NOT CONDITIONS OF APPROVAL; THEY ARE PROVIDED
TO ALERT THE APPLICANT TO ADDITIONAL ORDINANCES, STATUTES, AND
LEGAL REQUIREMENTS OF THE COUNTY AND OTHER PUBLIC AGENCIES THAT
MAY BE APPLICABLE TO THIS PROJECT.
A. Additional requirements may be imposed by the Fire District, Water District, Sanitary
District or the Building Inspection Division. It is advisable to check with these agencies
prior to requesting a building permit or proceeding with the project.
B. The Building Inspection Division will require three full sized sets of building plans
which must be stamped by the Community Development Division and by the Sanitary
District prior to issuance of building permits.
COA - 10
C. The project sponsor is required by the FCC to work with neighbors to correct any
interference to telephones, televisions or other electronic equipment caused by wireless
telecommunication facilities.
D. NOTICE OF OPPORTUNITY TO PROTEST FEES, ASSESSMENTS, DEDICATIONS,
RESERVATIONS OR OTHER EXACTIONS PERTAINING TO THE APPROVAL OF
THIS PERMIT.
Pursuant to California Government Code Section 66000, et seq., the applicant has the
opportunity to protest fees, dedications, reservations or exactions required as part of
this project approval. To be valid, a protest must be in writing pursuant to Government
Code Section 66020 and must be delivered to the Community Development Division
within a 90-day period that begins on the date that this project is approved. If the 90th
day falls on a day that the Community Development Division is closed, then the protest
must be submitted by the end of the next business day.
G:\Current Planning\curr-plan\Staff Reports\Land Use Permits\LP13-2020\LP13-2020_BOS_COA_2-25-14.doc