Loading...
HomeMy WebLinkAboutMINUTES - 08052014 - C.06RECOMMENDATION(S): APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and Water Conservation District (FC District), or designee, to execute an on-call contract with ENGEO, Inc. (Consultant), in an amount not to exceed $100,000 to provide on-call professional engineering services relating to fluvial geomorphology, effective March 10, 2014 through March 10, 2017, Countywide. FISCAL IMPACT: All costs associated with this on-call contract will not exceed $100,000 and will be funded 100% Flood Control District Funds and Road Funds under various project specific activities. BACKGROUND: The FC District provides regional flood protection, technical information, hydrology data and education to cities and residents, and environmental stewardship for over 79 miles of streams and 29 detention basins as part of the County’s flood protection system. The FC District prepares and reviews designs prepared by others that modify the existing flood protection system and require fluvial geomorphology professional services in these efforts. In many cases, the APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 08/05/2014 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Tim Jensen (925) 313-2390 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: August 5, 2014 David Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: D. Twa, County Administrator, T. Geiger, County Counsel's Office, B. Campbell, County Auditor-Controller's Office, L. Waters, County Auditor-Controller's Office, M. Carlson, Flood Control, T. Jensen, Flood Control, T. Rie, Flood Control, J. Wong, Flood Control, C. Windham, Flood Control C. 6 To:Contra Costa County Flood Control District Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:August 5, 2014 Contra Costa County Subject:On-Call Consulting Services Agreement with ENGEO, Inc., Countywide. (100% Flood Control and Road Funds) Project No.: Various BACKGROUND: (CONT'D) flood protection facility proposed for modification was constructed by the U.S. Army Corps of Engineers, or the U.S. Department of Agriculture Natural Resources Conservation Service, which means following their standards, policies, and procedures. In executing modifications to the flood control system, the FC District, at times, requires additional temporary services from persons specially trained, experienced, expert, and competent to perform professional engineering services. For that reason, the FC District is entering into this Agreement with Consultant. Under this Agreement, Consultant will provide professional engineering services relating to fluvial geomorphology on an on-call basis for a variety of FC District projects, whether proposed by the FC District or outside agencies, throughout Contra Costa County. The Consulting Services Agreement limits the Consultant’s liability for damages arising out of its errors or omissions in providing professional services under the CSA to $3,000,000, the amount stated in the Consultant’s professional liability insurance policy provided. This is for professional liability and does not limit the Consultant’s responsibility with regard to general liability claims. CONSEQUENCE OF NEGATIVE ACTION: Without the approval of the Board of Supervisors, the FC District will be unable to obtain on-call services for professional engineering services relating to fluvial geomorphology. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS Engeo CSA