HomeMy WebLinkAboutMINUTES - 06242014 - C.99RECOMMENDATION(S): APPROVE the 2014/2015 North Richmond Waste and Recovery Mitigation Fee Expenditure Plan (Exhibit A), which specifies intended activities and respective allocations of Mitigation Fee revenue from July 1, 2014 through June 30, 2015, as recommended by the North Richmond Waste and Recovery Mitigation Fee Joint Expenditure Planning Committee. FISCAL IMPACT: The proposed action will not impact the County’s General fund. The North Richmond Waste and Recovery Mitigation Fee Expenditure Plan includes a contingency line item in the budget to address any shortfall in actual annual revenue. Staff does not anticipate any revenue shortfall, however if the actual revenue does not match or exceed the amount projected for FY 2014/15, the contingency line item will be sufficient for this purpose. BACKGROUND: The Waste & Recovery Mitigation Fee was established in 2003 to mitigate designated impacts resulting from the expansion of the Bulk Material Processing Center (BMPC) located in North Richmond pursuant to the Use Permits issued by the County and City of Richmond. Prior to the end of each fiscal year (June 30 th ), approval of an Expenditure Plan for the next fiscal year is required by both the County Board of Supervisors and Richmond City Council in order to authorize the use of Waste & Recovery Mitigation Fee funding. APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 06/24/2014 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYES 5 NOES ____ ABSENT ____ ABSTAIN ____ RECUSE ____ Contact: Demian Hardman, (925) 674-7826 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: June 24, 2014 David J. Twa, County Administrator and Clerk of the Board of Supervisors By: Stephanie L. Mello, Deputy cc: C. 99 To:Board of Supervisors From:Catherine Kutsuris, Conservation and Development Director Date:June 24, 2014 Contra Costa County Subject:2014/2015 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan BACKGROUND: (CONT'D) Summary of Recommended 2014/2015 Expenditure Plan At the North Richmond Mitigation Fee Committee (NRMFC) meeting on May 30, 2014, the NRMFC voted to recommend that the County Board of Supervisors and Richmond City Council approve a 2014/2015 Expenditure Plan that allocates funding for the period between July 1, 2014 through June 30, 2015. The 2014/2015 Expenditure Plan (EP) allocates funding that is 19% less than the amount allocated in the prior 2013/2014 EP cycle. However, this reduction is primarily due to the absence of the Parks Rehabilitation Initiative Project ($200,000.00) and the limited number of incomplete Community-Based Projects needing to be rolled over from the prior Expenditure Plan. Otherwise, a majority of the strategies recommended for funding by the NRMFC are recommended to receive increases in funding for the 2014/2015 Fiscal Year. The increase in funding is generally attributed to: Actual revenue exceeding projected revenue by $12,316.83 under the previous 2012/2013 Expenditure Plan, the first time in several years this has occurred; and Unspent funding of $69,098.48 is available from several funded strategies from the previous 2012/2013 Expenditure Plan and $17,272.00 from the current 2013/2014 Expenditure Plan (due to a Community-Based Project no longer needing their funds). Funding Allocation Changes Recommended The funding changes recommended by the NRMFC for the 2014/2015 Expenditure Plan include the following: 100% increase (to $1,500) to fully re-instate funding for the Bulky Item Pick-ups & Disposal Vouchers Strategy (Strategy 1) 85% increase (to $10,000) to fully fund the Neighborhood Clean-ups Strategy (Strategy 2) 71% increase (to $17,000) to the City/County Right-of-Way Pick-up Strategy (Strategy 4) 5% increase to the Prevention Services Coordinator (Strategy 3), County Code Enforcement (Strategy 5), Illegal Dumping Law Enforcement – County Sheriff (Strategy 6), Community Services Coordinator (Strategy 8), and Committee Administration/Staffing 0% change in the level of funding for the Surveillance Cameras (Strategy 7), North Richmond Green Community Service Programs (Strategy 10), and North Richmond Green Campaign Strategy (Strategy 11) 100% decrease (from $26,666.67) to eliminate the City Code Enforcement Strategy per the City's request (not in the recommended EP) After earmarking all other funding allocations, there was a total of $133,899.22 available for Community-Based Projects. At the direction of the NRMFC, Committee Staff prepared and released a Request for Funding Proposals in April 2014 to solicit funding allocation requests from non-profit organizations. Proposals were submitted, evaluated and scored by Committee Staff for consideration by the NRMFC. NRMFC reviewed the Proposals and staff information and recommended Eight (8) of eleven (11) Proposals for funding. Of the eight (8) non-profits recommended for funding, the NRMFC recommended that $93,899.22 be allocated to the Community-Based Project Strategy (Strategy 9) to fund one-time projects within or which serve the specified North Richmond funding area. Five (5) of the eight (8) Projects being recommended to receive awards fall under this Strategy. The NRMFC is recommending that the remaining $40,000.00 be used to create a new Neighborhood Community Gardens Project Strategy (Strategy 12) to fund the on-going maintenance and up-keep of existing Community Gardens in the funding area. The funding under this Strategy is recommended to be allocated among three (3) Neighborhood Garden Projects. The next NRMFC meeting is scheduled for February 20, 2015, where discussions regarding the projected future revenue, potential 2013/2014 Expenditure Plan roll-over funding and planned use of funds for 2015/2016 fiscal year will begin. CONSEQUENCE OF NEGATIVE ACTION: Each new Expenditure Plan must receive final approval from the County Board of Supervisors and Richmond City Council. The Expenditure Plan recommended by the NRMFC would not take effect, even if/when approved by the Richmond City Council, unless and until it is also approved by the Board of Supervisors. Therefore, if the 2014/2015 Expenditure Plan is not approved by the Board prior to July 1, 2014 a vast majority of the previously approved strategies (activities) could not continue to be funded and implemented without interruption. If both the City and County do not approve the same Expenditure Plan, the City and County have the right to split the NRMF revenue pursuant to the terms of the Memorandum Of Understanding between the City and County. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS Recommended NRMF Expenditure Plan 2014-15 North Richmond Waste & Recovery Mitigation Fee 2014/15 Expenditure Plan The Waste & Recovery Mitigation Fee was established as a result of the Draft Environmental Impact Report (EIR) dated November 2003 for the WCCSL Bulk Materials Processing Center (BMPC) and Related Actions (Project). The Project involved new and expanded processing and resource recovery operations on both the incorporated and unincorporated area of the Project site, which the EIR concluded would impact the host community. To mitigate this impact Mitigation Measure 4-5 called for a Mitigation Fee to benefit the host community, described as follows: “Mitigation Fee. The facility operator shall pay a Mitigation Fee of an amount to be determined by the applicable permitting authority(ies) to defray annual costs associated with collection and disposal of illegally dumped waste and associated impacts in North Richmond and adjacent areas. The mitigation fee should be subject to the joint-control of the City and County and should be collected on all solid waste and processible materials received at the facility consistent with the existing mitigation fee collected at the Central IRRF.” In July 2004, the City of Richmond and Contra Costa County entered into a Memorandum of Understanding (MOU) agreeing to jointly administer Mitigation Fee monies collected from the BMPC for the benefit of the incorporated and unincorporated North Richmond area. This North Richmond Waste & Recovery Mitigation Fee Joint Expenditure Planning Committee (Committee) was formed pursuant to the terms of the MOU for the specific purpose of preparing a recommended Expenditure Plan. This Expenditure Plan provides a means to jointly administer the Mitigation Fee funding for the benefit of the host community, as described in the EIR. The Expenditure Plan is subject to final approval of the Richmond City Council and the Contra Costa County Board of Supervisors. By approving this Expenditure Plan, the City Council and Board of Supervisors authorize the use of Mitigation Fee funding for only the purposes and in the amounts specified herein. The City and County have each designated their respective staff persons responsible for administering the development and implementation of the approved Expenditure Plan, which includes responsibility for drafting and interpreting Expenditure Plan language. However, the City and County have not delegated to the Committee or to staff the authority to expend funding for purposes not clearly identified in the Expenditure Plan document officially approved by their respective decision-making bodies. Activities which can be funded in this Expenditure Plan period with the Mitigation Fee amounts specified within this Expenditure Plan are described herein as “Strategies” or “Staff Costs”. Strategies are categorized as either “Core Services” or “Supplemental Enhancements”. Core Services includes the higher funding priority strategies that most directly address the intended purpose of this City/County approved Mitigation Fee, “to defray annual costs associated with collection and disposal of illegally dumped waste and associated impacts in North Richmond”. All references to the “Mitigation Fee Primary Funding Area” or “Mitigation Fee Funding Area” pertain to the geographic area shown in the attached map (Attachment 5). Expenditure Plan Period: July 1, 2014 - June 30, 2015 (unless otherwise specified herein) Exhibit A 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee Page 2 of 12 BUDGET The funding allocation amounts included in this document apply to the Expenditure Plan Period specified on the first page unless otherwise specified herein. The total amount of funding allocated in the Expenditure Plan Budget is based on revenue projections provided by the BMPC operator, Republic Service, which are dependant upon multiple variables (e.g. number of tons of recovered materials vs. solid waste, per ton gate rate charged and amount of CPI- adjusted per ton Mitigation Fee). Actual Mitigation Fee revenue may deviate from revenue projections provided by Republic and used to prepare this Budget. A “Contingency” line item is included in the Budget to help accommodate variations between projected and actual revenue. Excess funding allocated to strategies and not expended by the end of each Expenditure Plan period is treated as “roll-over” funding for reallocation in a subsequent Expenditure Plan period. The Budget includes some line items that are based on fixed costs, however there are other line items which are scalable and/or dependant on utilization thereby providing flexibility to reallocate amounts if and when a significant need is identified. Allocated funding may remain unspent due to under-utilization of a particular program. If the amount allocated to a particular line item is determined to exceed needs based upon usage, the remaining funding can only be reallocated by officially amending the Expenditure Plan. This Expenditure Plan may only be adjusted upon official action taken by both the City and County. Although there has been some interest in allowing flexibility for staff to adjust funding allocations under specific circumstances, the authority to approve or modify the Expenditure Plan rests solely with the City Council and Board of Supervisors. Annual fiscal year Expenditure Plan cycle is expected to reduce margin of error of Mitigation Fee revenue projects, streamline financial reconciliation/budgeting process and minimize need to amend Expenditure Plans mid-cycle. Amending Expenditure Plans involve administrative burden and costs due to the joint approval needed from both the Richmond City Council and County Board of Supervisors. In order to minimize the amount of funding needed to cover staff costs incurred to amend the Expenditure Plan, staff will only recommend changes to the Expenditure Plan when necessary to address a significant and time-sensitive need. NORTH RICHMOND MITIGATION FEE EXPENDITURE PLAN BUDGET #Expenditure Plan (EP) Strategy (EP Cycle: July 1, 2014 thru June 30, 2015) Approved by Committee in May 2014 1 Bulky Item Pick-ups & Disposal Vouchers 1,500.00$ 2 Neighborhood Clean-ups 10,000.00$ 3 Prevention Services Coordinator 29,400.00$ 4 City/County Right-of-Way Pick-up & Tagging Abatement 17,000.00$ 5 Code Enforcement - County 92,568.00$ 6 Illegal Dumping Law Enforcement 177,187.50$ 7 Surveillance Cameras 2,700.00$ 8 Community Services Coordinator $ 60,245.85 9 Community-Based Projects1 93,899.22$ 10 North Richmond Green Community Service Programs 39,133.33$ 11 North Richmond Green Campaign 10,000.00$ 12 Neighborhood Community Garden Project(s)2 40,000.00$ Contingency (3.5% of Projected Revenue)4 20,000.25$ Subtotal (without Committee Staffing) 593,634.15$ X Committee Administration/Staffing 58,228.78$ Total Projected Revenue in 2014/153 569,764.20$ Unobligated (Not Spent) Carry-Over Funding from 2012/2013 Expenditure Plan4 82,098.48$ 69,734.89$ Total 2014/15 Expenditure Plan Budget 721,597.82$ Core Services1 Selected projects are incorporated in the 2014/15 Community Based Projects Table (Attachment 2) included as part of this 2014/2015 Expenditure Plan. Funding allocations for the $69,734.89 previously obligated to ongoing Projects approved in the 2013/14 Expenditure Plan is reflected in Attachment 3. 3 Total Projected Revenue shown above reflects the amount projected to be received between July 1, 2014 and June 30, 2015. Supplemental Enhancements5 Funding obligated for previously approved Supplemental Enhancement activities within the Community Based Project Strategy is recommended to be carried over to fund the completion of selected Projects under the 2014/15 Expenditure Plan since they are not expected to be completed by June 30, 2014. See Attachment 3 for listing of the previously approved Community Based Projects that are recommended to be carried over and implemented under Strategy 9 of this 2014/15 Expenditure Plan. Funding obligated in the 2013/14 Expenditure Plan to carry over into the 2014/2015 Expenditure Plan5 4 Amount of carry-over funding shown includes $64,826.48 of unspent 2012/13 Expenditure Plan funding available for reallocation and $17,272.25 (0.25 cents of this amount was placed into the Contingency line item) allocated under the Community Based Project strategy in the 2013-14 Expenditure Plan but will not be used as int ended due to the closure of the Center for Human Development. 2 Selected projects are incorporated in the 2014/15 Neighborhood Community Garden Project(s) Table (Attachment 4) included as part of this 2014/2015 Expenditure Plan. Page 3 of 12 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 4 of 12 - DESCRIPTION OF STRATEGIES RECOMMENDED FOR FUNDING Funding allocation amounts for each strategy are specified in the Budget table on page 3. The following Strategies describe the activities allowed to be funded with the amounts allocated to each in the Budget (associated allowable agency staff costs are described in the Staff Costs section). Strategies are grouped based on relative funding priority levels and the “Core Services” category contains higher priority Strategies than the “Supplemental Enhancements” category. Higher funding priority Strategies are those which best address the Fee’s intended purpose, “to defray annual costs associated with collection and disposal of illegally dumped waste and associated impacts in North Richmond”) and “Supplemental Enhancements”. Level 1 Priority - PRIMARY CORE SERVICES STRATEGIES  1 - Bulky Item Pick-ups & Disposal Vouchers  2 - Neighborhood Clean-up Events  4 - City/County Right-of-Way Trash & Tagging Removal  5 - Code Enforcement - County  6 - Illegal Dumping Law Enforcement Level 2 Priority - SECONDARY CORE SERVICES STRATEGIES  3 - Prevention Services Coordinator  7 - Surveillance Cameras Level 3 Priority - PRIMARY SUPPLEMENTAL ENHANCEMENTS STRATEGIES  8 - Community Services Coordinator  9 - Community Based Projects (SOME)  11 - North Richmond Green Campaign  12 – Neighborhood Community Garden Project(s) Level 4 Priority - SECONDARY SUPPLEMENTAL ENHANCEMENTS STRATEGIES  9 - Community Based Projects (SOME)  10 - North Richmond Green Community Service Programs CORE SERVICES 1. Bulky Item Pick-ups & Disposal Vouchers Provide residents in the Mitigation Fee Primary Funding Area, who prove eligibility consistent with City/County procedures, with the option of choosing to: o Request up to one on-call pick-up service per household per calendar year for bulky items that are not accepted in the current on-call clean-ups through Richmond Sanitary Service (RSS), only available to those with an active account with RSS; or o Request up to twelve $5 vouchers per household for disposal at Republic’s transfer station on Parr Blvd. per calendar year (vouchers expire after six months, Mitigation Fees only pay for vouchers that are actually redeemed). [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 5 of 12 - 1 Administering agency contracting charge applies ($3,000 per contract) Administering Agency: City of Richmond Implementing Entity(ies): Community Housing Development Corporation (processes requests and issues Disposal Vouchers/arranges Bulky Item Pick-ups) Republic Services - Golden Bear Transfer Station & Richmond Sanitary Service (reimbursed for Disposal Vouchers redeemed and Bulky Item Pick-ups provided) Reporting/Payment Requirements: Effective July 1, 2012, CHDC and Republic Services shall provide required data pertinent to Strategy 1 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments. 2. Neighborhood Clean-ups Provide at least one neighborhood and/or creek clean-up event in the Mitigation Fee Funding Area; additional clean-up event may be scheduled as funding allows. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: City of Richmond Implementing Entity(ies): City Manager’s Office (coordinates scheduling of clean-up dates and associated arrangements in conjunction with partner entities) Republic Services - Richmond Sanitary Service (reimbursed for providing/servicing clean-up boxes and disposing of debris placed in clean-up boxes) Reporting/Payment Requirements: Effective July 1, 2012, the City Manager’s Office and Republic Services shall provide required data pertinent to Strategy 2 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments (funding transfers). 3. Prevention Services Coordinator Fund at least a portion of a Prevention Services Coordinator (PSC) position (including salary/benefits/overhead and administering agency contracting charge1) on a contract basis to assist the City and County in implementing Strategy 1 as the point of contact for community members interested in claiming Disposal Vouchers or Bulky-Item Pick ups. Assist community members interested in reporting illegal dumping and seeking referral/resources. Track and report data related to illegally dumped waste collected by Republic Services Hot Spot Crew and handle associated referrals to applicable public agencies, including right-of-way referrals for Strategy 4. 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 6 of 12 - [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: City of Richmond & Contra Costa County Implementing Entity: Community Housing Development Corporation (CHDC) (reimbursed actual cost for part-time position and issues Disposal Vouchers/arranges Bulky Item Pick-ups) Reporting/Payment Requirements: Effective July 1, 2012, CHDC shall provide required data pertinent to Strategy 1 and Strategy 3 based upon the strategy- specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments. 4. City/County Right-of-Way Pick-up & Tagging Abatement Fund consolidated pick-up program (including personnel, mileage, equipment rental and administrative costs) for removal of illegal dumping and tagging abatement* in the public right-of-way located within the unincorporated & incorporated Mitigation Fee Primary Funding Area. Removal of illegal dumping is intended to occur based upon referrals from the Prevention Services Coordinator for items/debris not collected by the designated Republic Services Hot Spot Route crew. * Allocation of funding under this Strategy for this Expenditure Plan cycle is primarily intended to cover the cost incurred for City/County Right-of-Way Pick-up activities throughout the Primary Funding Area. Funds for Tagging Abatement were not allocated in this Expenditure Plan cycle. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: City of Richmond Implementing Entity: Richmond Police Department’s Code Enforcement Division Reporting/Payment Requirements: Effective July 1, 2012, the Richmond Police Department’s Code Enforcement Division shall provide required data pertinent to Strategy 4 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF- funded payments (funding transfers). 5. Code Enforcement Staff - County Fund at least a portion of County code enforcement position (including salary/benefits and related vehicle and equipment costs), to assist with vacant/ abandoned lot abatements and fencing as well as other health/building/zoning violations related to illegal dumping and blight throughout the unincorporated Mitigation Funding Area. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: Contra Costa County 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 7 of 12 - Implementing Entity: County Department of Conservation & Development’s Building Inspection Division Reporting/Payment Requirements: Effective July 1, 2012, the County Department of Conservation & Development’s Building Inspection Division shall provide required data pertinent to Strategy 5 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments (funding transfers). 6. Illegal Dumping Law Enforcement Fund majority of a full-time Sheriff Deputy (between 90-100% of salary/benefits, overtime, uniform and related cell phone, equipment, and vehicle costs) to assist with law enforcement investigations and patrols to combat illegal dumping within the Mitigation Fee Primary Funding Area. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: Contra Costa County Implementing Entity: County Sheriff’s Office Reporting/Payment Requirements: Effective July 1, 2012, the County Sheriff’s Office shall provide required data pertinent to this Strategy based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments (funding transfers). 7. Surveillance Cameras Fund the purchase of cameras, camera infrastructure, camera signage and costs related to maintenance, warranty, repair & relocation of surveillance camera system equipment within the Mitigation Fee Primary Funding Area to assist the dedicated Illegal Dumping Law Enforcement officer in targeting specific locations where illegal dumping occurs most regularly. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: Contra Costa County Implementing Entity(ies): Richmond Police Department (operate, move and maintain eight Pan-Tilt-Zoom wireless video surveillance cameras and associated camera system infrastructure throughout NR -AND- install/clean/move FlashCam cameras located within the incorporated NR area if funding is available) County Sheriff’s Department (coordinate monitoring of FlashCams located throughout NR and identify/request relocation of surveillance cameras throughout NR as needed) County Public Works Department (install/clean/move FlashCam cameras located within the unincorporated NR area upon request if funding is available) 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 8 of 12 - Reporting/Payment Requirements: Effective July 1, 2012, each Implementing Entity shall provide required data pertinent to each entity’s applicable Strategy 8 responsibilities based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF- funded payments (funding transfers) now or in the future. SUPPLEMENTAL ENHANCEMENTS 8. Community Services Coordinator Fund at least a portion of a Community Services Coordinator (CSC) position to be staffed on a contract basis (including salary/benefits/overhead and administering agency contracting charge2). The CSC shall:  serve as a link between the community of North Richmond, the City of Richmond, and Contra Costa County for issues related to beautification, illegal dumping, and blight;  coordinate outreach activities related to illegal dumping and beautification within the Primary Funding area, as specified by the City/County, including North Richmond Green community service programs and outreach activities described under Strategies 10 & 11; and  be bilingual in order to assist with Spanish translation as needed. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: City of Richmond Implementing Entity: Neighborhood House of North Richmond (NHNR). Reporting/Payment Requirements: Effective July 1, 2012, NHNR shall provide required data pertinent to Strategies 8, 10 & 11 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments. 9. Community Based Projects Fund the development, implementation and oversight of a variety of community- based projects with specific focuses on anti-littering, environmental stewardship, blight reduction and/or beautification (including personnel/labor, administrative oversight, materials, equipment and related maintenance costs plus administering agency contracting charges3). Rather than funding stipend programs separately (including stipends, administrative oversight and related materials/equipment), new community-based projects/programs should include component for stipends, where appropriate, to pay local youth and/or other community members for assisting with illegal dumping prevention/abatement or beautification activities within the Mitigation Fee Primary Funding Area. Community Based Projects to be funded were solicited through an open Funding Request Proposal & Application process. Examples of potential project types that may be funded include but are not limited to: 2Administering agency contracting charge is $3,000 per contract. 3Administering agency contracting charge is $3,000 per contract if directly contracting with City or County. 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 9 of 12 - a. Neighborhood Landscaping Improvements b. Community Art Projects (e.g. Tile Art, Murals or Safe Routes/Popsicle Project) c. Stipend Beautification Programs Details, including recommended allocation amounts, for each of the selected Community Based Projects to be funded under this Expenditure Plan are contained in the Community Based Projects Tables included as Attachments 2 & 3. Funding for carry-over Projects in Attachment 3 is not included in the amount listed under Strategy 9 in the Budget. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agencies: Contra Costa County and City of Richmond and/or Community Housing Development Corporation (CHDC) on behalf of the City or County. CHDC may, under contract with either the City or County as a Administering Agency, administer Community Based Project contracts funded under this Strategy for some or all of the new Community Based Projects selected for funding in the 2014/2015 Expenditure Plan cycle. CHDC shall use no more than twenty (20) percent (%) of the total amount awarded to each Community- Based Project (after subtracting City/County contracting cost) listed in Attachment 2 to oversee project implementation, including facilitating review/assessment of reports’ and deliverables. Payments to Implementing Entities for Community- Based Projects shall not be issued by CHDC without the written approval of City and County Committee Staff. Implementing Entity: Various Non-Profit Organizations (see Community Based Projects Tables in Attachments 2 and 3) Reporting/Payment Requirements: Any Community Based Project contracts issued or amended by the City/County shall incorporate Reporting & Invoicing Requirements generally consistent with those shown in Attachment 1. Community- Based Project contracts being administered by CHDC on behalf of either the City or County shall also incorporate Reporting and Invoicing Requirements generally consistent with those shown in Attachment 1. Attachment 1 only applies to Community-Based Project contracts with the Implementing Entities. The City and/or County will issue advance payments to CHDC, as needed, to ensure there is adequate funding available to payments requested by Implementing Entities if and when authorized by City and County Staff. Additionally, CHDC would be subject to contractual payment and reporting provisions that differ from those in Attachment 1 due to the nature of the services to be provided. 10. North Richmond Green Community Services Programs Fund the following North Richmond Green programs on a contract basis4 to the extent the specific details submitted are determined to align with the purpose of the Mitigation Fee and Expenditure Plan:  NR Little League Baseball Program - Includes cost of registration and uniforms with customized North Richmond Green patches for up to 5-6 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 10 of 12 - 4 Administering agency contracting charge applies ($3,000 per contract) teams, season kick-off event/parade, equipment, stipends for game monitoring and oversight, food and transportation.  NR Adult Softball program - Includes cost of registration, jerseys with North Richmond Green patches and hats for the men’s and women’s team.  NR Youth Twilight Basketball Program - Includes cost of registration and uniforms with North Richmond Green patches for up to 5-6 teams, equipment, stipends for game monitoring and oversight, food and transportation.  NR Youth Eco Academy - Youth projects to include school gardens, recycling efforts, habitat restoration, creek/bay/ocean water quality monitoring, beach/creek/neighborhood clean-ups and ecological field trips. May fund the cost of materials, transportation and fees associated with pre-approved community beautification projects such landscaping and murals. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: City of Richmond & Contra Costa County Implementing Entity: Neighborhood House of North Richmond (NHNR). Reporting/Payment Requirements: Effective July 1, 2012, NHNR shall provide required data pertinent to Strategies 8, 10 & 11 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments. 11. North Richmond Green Campaign Fund the design, printing and/or distribution of education and outreach materials on a contract basis4 which must align with the purpose of the Mitigation Fee and Expenditure Plan and be pre-approved by Committee Staff. Outreach materials must include “Jointly funded by City of Richmond & Contra Costa County” unless otherwise specified herein. Outreach materials may be any of the types specified below, however must clearly intend to directly:  Inform the community about Mitigation Fee funded programs/efforts,  Increase participation in Mitigation funded programs/efforts,  Reduce illegal dumping and blight in the Mitigation Fee Funding Area, and/or  Promote beautification in the Mitigation Fee Funding Area. The following type of outreach material expenditures may be funded if reviewed and pre-approved by Committee Staff:  STIPENDS – Pay local community members (youth and adults) to distribute printed outreach materials door-to-door to promote mitigation-funded strategies (Jointly Funded text not applicable to stipend expenses, only materials)  HANDOUTS/MAILERS – Newsletters, flyers, brochures or other documents intended to be handed out or mailed to local residents/organizations. 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 11 of 12 - 6 Administering agency contracting charge applies ($3,000 per contract) with the County or City  T-SHIRTS - Shirts shall include the NRGreen.org website to encourage people to learn more about Mitigation funded programs/efforts (local phone number should also be included when possible, however inclusion of Jointly Funded text may not be required)  NR GREEN FESTIVAL – Event held once per year and generally include information booths to raise awareness about mitigation-funded efforts and other local beautification efforts as well as fun activities for kids and food. Materials promoting the event shall include the NRGreen.org website as well as a local phone number.  SIGNAGE – Printed or manufactured signage, which includes promotional banners for local events/parades, which should include the NRGreen.org website for Community members to learn more about Mitigation funded programs/efforts. Repair, replacement and removal of NRMF-funded Light Pole Banners. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agency: City of Richmond & Contra Costa County Implementing Entity: Neighborhood House of North Richmond (NHNR). Reporting/Payment Requirements: Effective July 1, 2012, NHNR shall provide required data pertinent to Strategies 8, 10 & 11 based upon the strategy-specific invoicing/reporting parameters and schedule developed/maintained by Committee Staff in order to receive NRMF-funded payments. 12. Neighborhood Community Garden Project(s) Fund on-going maintenance and up-keep of existing community gardens within the Primary Funding Area, which may include a component for stipends, where appropriate, to pay local youth and/or other community members for assisting with Community Garden upkeep and maintenance. Neighborhood Community Garden Projects to be funded were solicited through an open Funding Request Proposal & Application process. Projects selected under this Strategy could be funded on an on-going basis if separately awarded funding in multiple Expenditure Plan cycles. Details, including recommended allocation amounts, for each of the selected Neighborhood Community Garden Projects are included in Attachment 4. [See “Staff Costs” section for agency activities that may also be funded under this Strategy.] Administering Agencies: Contra Costa County, City of Richmond and/or Community Housing Development Corporation (CHDC)5 on behalf of the City or County. CHDC may, under contract with either the City or County as the Administering Agency, administer Neighborhood Community Garden Project contracts being funded under this Strategy for some or all of the Neighborhood Community Garden Project non-profit organizations selected for funding in the 2014/2015 Expenditure Plan cycle. CHDC shall use no more than twenty (20) 5 Administering agency contracting charge is $3,000 per contract. 2014/2015 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee - Page 12 of 12 - percent (%) of the total amount awarded to each Project to oversee project implementation, including facilitating review/assessment of reports and deliverables. Payments to Implementing Entities for Neighborhood Community Garden Projects shall not be issued by CHDC without the written approval of both City and County Committee Staff. Implementing Entity: Various Non-Profit Organizations (see Neighborhood Community Garden Projects Table in Attachment 4) Reporting/Payment Requirements: Any Neighborhood Community Garden Project contracts issued or amended by the City/County shall incorporate Reporting & Invoicing Requirements generally consistent with those shown in Attachment 1. Neighborhood Community Garden Project contracts being administered by CHDC on behalf of either the City or County shall also incorporate Reporting & Invoicing Requirements generally consistent with those shown in Attachment 1. Attachment 1 only applies to the Neighborhood Community Garden Project contracts with the Implementing Entities. CHDC would be subject to contractual payment and reporting provisions that differ from those in Attachment 1 due to the nature of the services to be provided. The City and/or County will issue advance payments to CHDC, as needed, to ensure there is adequate funding available to payments requested by Implementing Entities if and when authorized by City and County Staff. STAFF COSTS Committee Administration/Staffing Funding: The funding allocated for Committee Administration/Staffing may not be adequate to cover the full cost of staff time necessary for jointly staffing the North Richmond Waste & Recovery Mitigation Fee Joint Expenditure Planning Committee as well as developing, administering and overseeing this Expenditure Plan for the specified period. Supplemental funding allocation may be necessary upon determining actual costs exceed the amount budgeted to cover the intended City/County costs for joint staffing. Strategy-Specific Funding: The cost of City/County staff time spent providing direct implementation assistance and/or coordination for specific Strategies may be covered with a portion of the NRMF funding budgeted for each applicable Strategy. Additionally, a portion of the NRMF funding budgeted for Strategies will be used to pay fixed administering agency contracting charge for each applicable contract ($3,000 per contract) unless otherwise specified herein. G:\Conservation\Deidra\Illegal Dumping\BMPC Mitigation Fee Committee\2014-2015 Exp Plan\2014-15 Bd Order Files\NRMF 2014- 15 Final for City-County Approval.doc Community-Based Project & Neighborhood Community Garden Project Reporting and Invoicing Requirements Substantially equivalent language to be included in all NRMF-funded Community Project Agreements/Amendments Contractor shall submit Progress Reports, using attached City/County provided template, in conjunction with each invoice covering the period since last report/invoice submitted, consistent with the Payment Provisions (Specify the Section of the Service Plan of the Agreement). Contractor shall monitor, document, and report all Participants activities and other costs for which reimbursement will be requested. Upon completion of work, Contractor shall submit a Final Report, using attached City/County provided template, in conjunction with the final invoice. Authorized Advance Payments: In order to receive any potential payment in advance, such must be authorized for the specified Project in Attachment 2 of the Expenditure Plan approved by both the County Board of Supervisors and Richmond City Council. No Contractor authorized for advance payment may receive more than ten (10) percent (%) of the approved Implementing Entity Award for this Project. In order to seek potential payment in advance, the Contractor shall submit a written request to both the City and County Committee Staff detailing the reason(s) advance payment is necessary and the amount of funding requested in advance (not to exceed 10% of total award) specifying which applicable allowable expenses would be covered by such payment. Contractor shall submit invoices and required supporting documentation requesting reimbursement for allowed costs in the Budget contained in the “Eligible Costs” Section, which together may not total more than $ (enter applicable contract amount). 1. Invoices: Invoices shall contain the following information in sufficient detail and be submitted in a form which adequately demonstrates consistency with this Service Plan. Invoices shall be accompanied by the applicable Required Supporting Documentation described in the following subsection. a. Number of hours per staff member being billed for which stipends have been paid, b. Number of hours Contractor staff performed work per Task described herein at the rates allowed in the “Eligible Costs” Section, and c. Separately identify number of hours spent attending North Richmond Green Meetings (Attendance Required at least Quarterly). d. Itemization of any other direct costs (e.g. supplies, travel, operating expenses, etc.) incurred for which reimbursement is being requested within that invoice period. 2. Required Supporting Documentation: The following Required Supporting Documentation must be submitted with invoices when applicable as described below. a. Every invoice must be accompanied by a Progress Report, with the exception of the final invoice which must be accompanied by a Final Report. Both types of Reports must contain all of the information specified in the City/County provided Report templates. b. If stipends are included in an invoice, such invoice must be accompanied by copies of Interns daily logs or timesheets covering all stipend hours for which reimbursement is being requested. c. If staff time is included in an invoice, such invoice must be accompanied by copies of timesheets covering all staff hours for which reimbursement is being requested. d. If an invoice is requesting reimbursement of any other direct costs (any costs other than staff time or stipends), such invoice must be accompanied by copies of actual Attachment 1 itemized invoices or receipts for all applicable direct costs (bus transportation or curriculum materials). If an invoice is requesting reimbursement for copying or printing, at least one copy of the printed item should accompany the invoice. City/County shall review submitted invoices and supporting documentation within a reasonable period of time and remit payment to Contractor promptly upon determining the purpose and amount of payment requested are authorized under this Agreement. G:\Conservation\Deidra\Illegal Dumping\BMPC Mitigation Fee Committee\2014-2015 Exp Plan\2014-15 Bd Order Files\NRMF 2014-15 Exp Plan Attachment 1.doc North Richmond Waste & Recovery Mitigation Fee Community-Based Project Progress Report Page 1 of 1 Organization: Contact Person: Progress Report Period: - Brief Description of the Project: Provide a brief description of the project activities/services your Organization is providing with this North Richmond Mitigation Fee (NRMF) funding. Funded activities must be consistent with the signed Agreement. Tasks Accomplished to Date: Describe the various tasks that your Organization has completed in whole or in part during the Progress Report Period (can be bullet points). [Save for use/reference when preparing Final Progress Report.] Materials Produced to Date: Provide a listing of any materials/documents produced during this Progress Report period as a part of this project (e.g. pictures, surveys, handouts, work products, etc.) and attach copies of each. Number of Persons Served to Date: Provide total number served from the NRMF Funding Area during this Progress Report period. Provide total number served from outside the NR Funding Area during this period. Provide total number of residents paid with NRMF funding during this period. North Richmond Green Meeting Attendance to Date: Specify which monthly North Richmond Green meetings (list meeting dates) your Community Based Project representative(s) attended during this Progress Report period. [Must attend at least once per quarter] MEETING DATE(s): ATTENDEE NAME(s): Successes to Date: Identify whether and how your project is addressing the intended problems associated with illegal dumping (be specific). Describe any other beneficial outcomes/success stories resulting from your project activities to date. Challenges to Date: List any and all issues/problems (e.g. change in personnel, inadequate public awareness, applicability of regulatory restrictions/requirements, etc.) identified during this period which may impact the project’s ability to achieve the intended outcome(s) identified by your Organization. Include all challenges/obstacles/barriers that may inhibit or compromise your ability to address the intended illegal dumping problem(s). Lessons Learned to Date & Feedback from Participants/Community: Share any lessons learned from participants, staff and/or the community during this Progress Report period. Provide any feedback about the NRMF-funded project/program received from participants and/or community members (such as copies of quotes, emails/letters and completed surveys/evaluations). Other Project Information: Provide any additional information about your organization’s work that did not fit in any of the other sections, including description(s) of any additional services or enhanced activities provided beyond those specified. Project Expenses to Date: Attach completed Progress Report to each Invoice being submitted for any reimbursable costs incurred during this Progress Report Period. North Richmond Waste & Recovery Mitigation Fee Community-Based Project Final Progress Report Page 1 of 1 Organization: Contact Person: Contract Period: - Brief Description of the Project: Provide a brief description of the project activities/services your Organization provided with this North Richmond Mitigation Fee (NRMF) funding. Funded activities must be consistent with the terms of your signed Agreement. Tasks Accomplished: Describe all project tasks/activities that your Organization completed during the entire contract period. Summarize any work completed not previously reported and consolidate with updated information from prior Progress Reports. Materials Produced: Provide a listing of any materials/documents produced as a part of the program (e.g. pictures, surveys, handouts, work products, etc.). Attach copies of anything not included with prior Progress Reports submitted. Number of Persons Served: Provide total number served from the NRMF Funding Area during the entire contract period. Provide total number served from outside the NR Funding Area during the entire contract period. Provide total number of residents paid with NRMF funding during the entire contract period. North Richmond Green Meeting Attendance: Specify which monthly North Richmond Green meetings (list all meeting dates) your Community Based Project representative(s) attended during the contract period. [Must attend at least once per quarter] MEETING DATE(s): ATTENDEE NAME(s): Successes: Identify extent to which your project addressed the intended problems associated with illegal dumping and how (be specific). Describe any other beneficial outcomes/success stories resulting from your project activities. Challenges: Explain why your Organization was not able to achieve the intended project outcomes and/or address the illegal dumping problems previously identified, if applicable. Include any challenges/obstacles/barriers (e.g. personnel changes, lack of public awareness, previously unknown regulatory restrictions/requirements, etc.) that compromised or inhibited your project’s success in addressing problems associated with illegal dumping. Lessons Learned & Feedback from Participants/Community: Share any lessons learned from participants, staff and/or the community during the contract period. Summarize all participant and/or community feedback received about this NRMF-funded project/program (attach any findings/summary of final project evaluation and copies of related documents not previously submitted). Other Project Information: Provide any additional information about your organization’s work that did not fit in any of the other sections, including description(s) of any additional services or enhanced activities provided beyond those specified. Final Project Expenses: Attach completed Final Progress Report to the Final Invoice being submitted for any reimbursable costs not included on invoice(s) submitted with prior Progress Report(s). Implementing Entity / Fiscal Sponsor (if applicable)Project TitleAdvance Payment Allowed (Up to 10% of the Award) Requested AmountImplementing Entity AwardAgency Contracting Costs 1Total Project Award & Contracting CostsNotesMcGlothen Temple Educational Community CenterMcGlothen Temple Educational Community CenterNo $ 10,000.00 $ 10,000.00 $2,788.29 - $3,000 $12,788.29 - $13,000 Neighborhood House of North Richmond (NHNR)North Richmond Green Team Yes $ 25,000.00 $17,907.45 - $19,728.41 $3,000 - $4,988.68 $22,728.41 - $22,896.13 Reach Fellowship International Reach Clean Up Initiative Yes $ 25,000.00 $17,907.45 $19,728.41 $3,000 - $4,988.68 $22,728.41 - $22,896.13 Contra Costa County Service Integration Team (SIT)/North Richmond Economic Development CorporationContra Costa County Service Integration, Family Service Center, Build Men and WomenNo $ 9,714.00 $ 9,714.00 $2,708.55 - $3,000 $12,422.55 - $12,714.00 The Remember Us People Project (TRUPP) / Self-Sustaining Communities Beautification, food and community building projectYes $ 25,000.00 $17,907.45 - $19,728.41 $3,000 - $4,988.68 $22,728.41 - $22,896.13 $ 94,714.00 $73, 436.35 - $78,899.23 $15,000.00 - $20,462.88 $ 93,899.23 Selected organization(s) may be asked to submit scaled-back versions of their Scope of Work describing what element(s) of their selected project they are proposing to complete with the amount available.Attachment 2 - Community Based Projects Table (Strategy 9)Funding Allocations for New 2014/15 Community Based Projects selected and recommended by the North Richmond Mitigation Fee CommitteeIn April 2014, the NRMF Committee recommended an allocation of $93,899.22 for new 2014/15 Community Based Projects. At their meeting on May 30, 2014 the NRMF Committee recommended allocation of this funding based on Funding Request Proposals submitted by eligible non-profit organizations in May 2014. The funding recommendations made by the Committee are shown in the below Table. New Community Based Projects Recommended for Funding in 2014/2015Total Funding Requested/Allocated. 1 Contracting cost for 3rd party organization to manage and oversee contracts with Entities for Projects selected for funding may be up to twenty (20) percent (%) of the award amount. Expenses for 3rd party may be lower and is based on actual expenses administering individual contracts. County/City contracting cost to contract with 3rd Party to oversee Entities and/or to directly contract with individual Entities for each Project is $3,000 per City/County Contract.G:\Conservation\Deidra\Illegal Dumping\BMPC Mitigation Fee Committee\2014-2015 Exp Plan\2014-15 Bd Order Files\CommBasedProjects_for City-County Approval_Final-Attachment2.xlsNew 2013 CBPsPrinted: 6/9/2014, 2:20 PM Implementing Entity / Fiscal Sponsor (if applicable)Project TitleRequested AmountImplementing Entity AwardAgency Contracting CostsTotal Project Award & Contracting CostsNotesAthletes United for PeaceCommunity Media Outreach Project $ 150,000.00 $ 14,272.25 $ 3,000.00 $ 17,272.25 Communities United Resorting Mother Earth (CURME) / Greater Richmond Interfaith Program (GRIP)Lots of Crops $ 242,681.80 $ 14,272.25 $ 3,000.00 $ 17,272.25 2013/14 Expenditure Plan Funding to be Carried Over Into 2014/2015 EP 1 $ 34,544.50 $ 392,681.80 $ 28,544.49 $ 6,000.00 $ 34,544.50 Total Funding Requested/Allocated1 Amount shown is a portion of the total Community-Based Projects funding not spent in 2013/2014 EP. This funding is shown as Carry-Over funding in the Budget and not included in the budgeted amount listed under Strategy 9.Attachment 3 - Community Based Projects Table (Strategy 9)Funding obligated for Community Based Projects in the 2013/14 Expenditure Plan to be carried over into the 2014/2015 Expenditure Plan to allow completion of work beyond June 30, 2014. At their meeting held on May 31, 2013, the NRMF Committee voted to approve recommending the following allocations totalling $51,816.74 to fund 2013/14 Community Based Projects. The following projects were selected based on Proposals submitted by eligible non-profit organizations in 2012. Center for Human Development (CHD) is not included in this table, since the ogranization no longer exists. The allocated funding ($17,272.25) for CHD is included in the budgeted carry-over funding that is being reallocated to new Projects in this 2014/2015 Expenditure Plan. Community Based Projects Carried Over From 2013/2014 Expenditure PlanG:\Conservation\Deidra\Illegal Dumping\BMPC Mitigation Fee Committee\2014-2015 Exp Plan\2014-15 Bd Order Files\CommBasedProjects_2014-15 Attachment3.xlscarryover 2013 CBPsPrinted: 6/9/2014, 3:46 PM Implementing Entity / Fiscal Sponsor (if applicable)Project TitleRequested AmountImplementing Entity AwardAgency Contracting CostsTotal Project Award & Contracting CostsAmount Spent in FY 13/14 (YTD)Amount Remaining to be SpentNotesCommunities United Resorting Mother Earth (CURME) / Greater Richmond Interfaith Program (GRIP)Lots of Crops$242,681.80 $18,768.08 $3,000.00 $21,768.08 $18,714.54$3,053.54Contracting Costs have not yet been transferred Verde Partnership GardenVerde Elementary School Garden$14,000.00 $14,000.00 $0.00 $14,000.00 $0.00$14,000.00Eco-VillageEco-Stewardship Ambassadors Project$83,860.00 $35,000.00 $0.00 $35,000.00 $16,863.15$18,136.852013/14 Expenditure Plan Funding to be Carried Over Into 2014/2015 EP 1 $ 35,190.39 $ 340,541.80 $ 67,768.08 $ 3,000.00 $ 70,768.08 Attachment 3 - Community Based Projects Table (Strategy 9)Funding obligated for Community Based Projects in the 2013/14 Expenditure Plan to be carried over into the 2014/2015 Expenditure Plan to allow completion of work beyond June 30, 2014. 1 Amount shown is a portion of the total Community-Based Projects funding not spent in 2013/2014 EP. This funding is shown as Carry-Over funding in the Budget and not included in the budgeted amount listed under Strategy 9.Total Funding Requested/AllocatedCommunity Based Projects Carried Over from 2012/2013 Expenditure Plan (EP) Projects Originally Carried Over from 2010/2011 EPG:\Conservation\Deidra\Illegal Dumping\BMPC Mitigation Fee Committee\2014-2015 Exp Plan\2014-15 Bd Order Files\CommBasedProjects_2014-15 Attachment3.xlsCarryover 2012 CBPsPrinted: 6/9/2014, 3:43 PM Implementing Entity / Fiscal Sponsor (if applicable)Project TitleRequested AmountImplementing Entity AwardAgency Contracting Costs 1Total Project Award & Contracting CostsNotesCommunities United Restoring Mother Earth (CURME) / Greater Richmond Interfaith ProgramLots of Crops $ 15,000.00 $10,500 - $10,641.52 $2,963.93 - $3,000 $13,500 - $13,605.45 Urban TilthCultivating Hope: Maintaining North Richmond Gardens $ 10,000.00 $ 10,000.00 $2,789.10 - $3,000 $12,789.10 - $13,000 Davis Chapel Neighborhood Enhancement Team (DCNET)Davis Chapel A. Moore NR Community Garden $ 25,000.00 $10,500 - $10,641.52 $2,963.93 - $3,000 $13,500 - $13,605.45 Total Funding Requested/Allocated $ 50,000.00 $31.000 - $31,283.04 $7,820.76 - $9,000 $ 40,000.00 1 Contracting cost for 3rd party organization to manage and oversee contracts with Entities for Projects selected for funding may be up to twenty (20) percent (%) of the award amount. Expenses for 3rd party may be lower and is based on actual expenses administering individual contracts. County/City contracting cost to contract with 3rd Party to oversee Entities and/or to directly contract with individual Entities for each Project is $3,000 per City/County Contract.Attachment 4 - Neighborhood Community Garden Projects (Strategy 12)Funding Allocations for New 2014/15 Neighborhood Community Garden Projects selected and recommended by the North Richmond Mitigation Fee Committee In April 2014, the NRMF Committee recommended an allocation of $40,000 for new Neighborhood Community Garden Projects for 2014/2015. At their meeting on May 30, 2014 the NRMF Committee selected recommended projects and funding allocations based on Funding Request Proposals submitted by eligible non-profit organizations in May 2014. The project selections and funding recommendations made by the Committee are shown in the below Table. New Neighborhood Community Garden Projects Recommended for Funding in 2014/2015Selected organization(s) may be asked to submit scaled-back Scope of Work describing what element(s) of their selected project they are proposing to complete with the amount available.G:\Conservation\Deidra\Illegal Dumping\BMPC Mitigation Fee Committee\2014-2015 Exp Plan\2014-15 Bd Order Files\CommGardenProjects_2014-15 Attachment4.xlsNew 2013 CBPsPrinted: 6/9/2014, 2:24 PM Hensley St Ga r r a r d Bl v d Richmond Pkwy 7th St Hensley St Duboce Ave Sanford Ave 8th St Willard Ave 9th St York St Vernon Ave Filbert St Lincoln Ave Battery St Factory StN Castro St Kelsey St 6th St Tri angl e Ct Leo St 10th St Amstan Ln Cherry St Lucas Ave Presco Ln J o y A v e Enterprise Ave Factory StCommittee Approved Additions to Primary Mitigation Funding Area Market Ave Chesley Ave Rumrill BlvdLegend July 2006 Additiion to Mitigatin Funding Area Primary Mitigation Funding Area ²0 130 260 390 52065Feet