Loading...
HomeMy WebLinkAboutMINUTES - 07092013 - C.08RECOMMENDATION(S): APPROVE the 4th Street Sidewalk Improvements Project and AUTHORIZE the Public Works Director, or designee, to advertise the project [DCD-CP#12-51], Rodeo area. (District V) [Project No.: 0676-6P1025] FIND that the project is a California Environmental Quality Act (CEQA), Class 1(c) Categorical Exemption, pursuant to Section 15301(c) of the CEQA Guidelines; and DIRECT the Director of Conservation and Development to file a Notice of Exemption with the County Clerk; and AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to Conservation and Development for processing, and a $50 fee to the County Clerk for filing the Notice of Exemption. FISCAL IMPACT: 100% Local Road Funds. APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 07/09/2013 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: L. CHAVEZ, 925-313-2366 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: July 9, 2013 David Twa, County Administrator and Clerk of the Board of Supervisors By: Stacey M. Boyd, Deputy cc: T. Torres, PWD Environmental, CAO, D. Twa, G. Kramer, County Assessor , L. Mangabay, PWD Finance, L. Chavez, PWD, Environmental, A. Villar, PWD, TransEng C. 8 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:July 9, 2013 Contra Costa County Subject:APPROVE the 4th Street Sidewalk Improvements Project and CONSIDER related actions under the California Environmental Quality Act (CEQA), (District V) BACKGROUND: The project consists of providing pedestrian facilities along a segment of 4th Street in Rodeo, which is a major collector road joining Parker Avenue. The project will construct curb, gutter, and sidewalk facilities along 4th Street from Parker Avenue to Vaqueros Avenue, as well as improvements at the Rodeo Creek Trail Crossing at the 4th Street Bridge. The bridge connects residents east of Rodeo Creek to the office and commercial establishments along Parker Avenue. The project will construct approximately 400 feet of continuous sidewalk along 4th Street. Existing gaps in the sidewalk along both sides of the roadway provide an uneven surface that is difficult for pedestrians to navigate. The existing sidewalks will be reconstructed to meet Americans with Disabilities Act (ADA) requirements. ADA facilities will include curb ramps and detectable warning surfaces. The project will also provide ADA compliant access to the existing trail crossing at 4th Street. The project will be constructed within the existing right-of-way and maintain the existing roadway drainage. The project will have no impacts to Rodeo Creek. Driveways will be provided within the new sidewalk to provide access to the adjacent parcels. Access to these parcels will be maintained during construction. Existing roadway signs and striping may require relocation. The project may require relocation of existing utilities and the removal of one existing non-native tree. Studies conducted in the area have revealed high levels of hydrocarbons in the soil. As a result, soils encountered during construction will not be reused and will be disposed of at licensed landfill facilities. Real Property transactions and utility relocations may be necessary in support of this project. At least one lane of traffic will be open at all times during construction activities. Emergency vehicles will have access at all times. CONSEQUENCE OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS CEQA 4th street attachment