HomeMy WebLinkAboutMINUTES - 07092013 - C.02RECOMMENDATION(S):
ADOPT Resolution No. 2013/280 approving and authorizing the Public Works Director, or designee, to file an
application for the federal Surface Transportation Program (STP) and/or Congestion Mitigation and Air Quality
Improvements (CMAQ) funding under the Local Streets and Roads Preservation (LSRP) Program for the
Countywide Overlay Project (Project No. 0662-6R4073) for up to $1,936,000.00 and committing local support and
assurance to complete the project. (District II, III)
FISCAL IMPACT:
The LSRP Program will provide approximately $1,936,00.00 (57%) of federal funds for the Countywide Overlay
Project and the local match for the project will be funded by County Road Funds (43%).
BACKGROUND:
In May 2012, the Metropolitan Transportation Commission adopted Resolution 4035, outlining improvements to be
funded with federal transportation funds expected through 2016. One of the programs identified is the One Bay Area
Grant (OBAG) Program. As one of the Bay Area congestion management agencies (CMA), the Contra Costa
Transportation Authority will be responsible for programming federal funds available through OBAG for Contra
Costa. Funding for the OBAG Program comes from the Surface Transportation Program (STP), the Congestion
Mitigation-Air Quality (CMAQ) Program, and the new Transportation Alternatives Program (TAP).
Through OBAG, each CMA will recommend projects to be funded through six separate programs: Local Streets and
Roads Preservation (LSRP), Bicycle and Pedestrian Improvements, Transportation for Livable Communities, Safe
Routes to School, Priority Conservation Area, and Planning and Outreach Activities. The LSRP program is reserved
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 07/09/2013 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Angela Villar, (925)
313-2016
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: July 9, 2013
David Twa, County Administrator and Clerk of the Board of Supervisors
By: Stacey M. Boyd, Deputy
cc:
C. 2
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:July 9, 2013
Contra
Costa
County
Subject:Resolution of local support of the federal STP/CMAQ funding for Countywide Overlay Project
for pavement rehabilitation and preventative maintenance projects located on the Federal-Aid System.
The Countywide Overlay Project will provide pavement rehabilitation on three arterial roadway segments within
unincorporated Contra Costa County. The arterial roadways selected include segments of Pleasant Hill Road
(northbound), Vasco Road, and Byron Highway. The roadways were selected based upon current pavement
condition, pavement history, and roadway functional classification within the Federal-Aid Highway System.
Pavement rehabilitation treatments may include overlay, cold-in-place recycle, and/or reconstruction in order to
extend the service life of the pavement.
CONSEQUENCE OF NEGATIVE ACTION:
Failure to approve the submittal of this application will eliminate a potential funding source.
CHILDREN'S IMPACT STATEMENT:
Not applicable.
ATTACHMENTS