HomeMy WebLinkAboutMINUTES - 04232013 - C.02RECOMMENDATION(S):
APPROVE and AUTHORIZE the Public Works Director, or designee, to execute the Temporary Construction Permit
and Sidewalk Conform with SVF Oak Road Walnut Creek Corporation, effective May 1, 2013 through December 31,
2013, for the Contra Costa Centre Infrastructure Project. (Project No.: 0662-6R4120)
FISCAL IMPACT:
100% Redevelopment Tax Exempt Capital Bonds funds.
BACKGROUND:
The Contra Costa County (County) Public Works Department is required to obtain a Temporary Construction Permit
and Sidewalk Conform for the Contra Costa Centre Infrastructure Improvements Project in order to improve the curb
ramps to meet current ADA standards. As a condition of the permit, the Property Owners have required the County to
indemnify the Property Owners. Without the property owner’s approval to remove and replace the sidewalk within
their property line, there will be a difference in the elevation between the existing sidewalk and the improved
sidewalk.
CONSEQUENCE OF NEGATIVE ACTION:
After the project is completed, there would be a difference in the elevations between the existing and the improved
sidewalks.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 04/23/2013 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Angela Bell,
925-313-2337
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: April 23, 2013
David Twa, County Administrator and Clerk of the Board of Supervisors
By: Stacey M. Boyd, Deputy
cc:
C. 2
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:April 23, 2013
Contra
Costa
County
Subject:APPROVE Temporary Construction Permit for Contra Costa Centre Infrastructure Improvements Project
CHILDREN'S IMPACT STATEMENT:
Not applicable.
ATTACHMENTS
Temp Construction Permit