HomeMy WebLinkAboutMINUTES - 03122013 - C.86RECOMMENDATION(S):
AUTHORIZE the Public Works Director, or designee, to advertise for On-Call Contract(s) for Various Road and
Flood Control Maintenance Work, Contract No. 0672-6U2009, for routine maintenance, repair, replacement, or
reconstruction of existing road and flood control facilities, Countywide.
FISCAL IMPACT:
The On-Call Contract(s) for Various Road and Flood Control Maintenance Work is to be funded by Local Road and
Flood Control funds (100%).
BACKGROUND:
The Public Works Department uses On-Call Contract(s) for Various Road and Flood Control Maintenance Work to
provide support as needed to Public Works Maintenance crews for various routine road and flood control
maintenance repairs, such as but not limited to, storm damage repair work, including rock slope protection, slope
stabilization, culverts, and concrete structures, on an as-needed basis, in various locations within Contra Costa County.
The Public Works Department intends to award at least one $300,000 contract, but not more than four $300,000
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 03/12/2013 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Henry Finch,
925-313-7004
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: March 12, 2013
David Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc:
C.86
To:Board of Supervisors
From:Julia R. Bueren, Public Works
Date:March 12, 2013
Contra
Costa
County
Subject:Advertise the On-Call Contract(s) for Various Road and Flood Control Maintenance Work
BACKGROUND: (CONT'D)
contracts, to the responsible bidder(s). Each contract will have a term of two years with the option of a one-year
extension and will be used as needed with no minimum amount that has to be spent.
CONSEQUENCE OF NEGATIVE ACTION:
The Public Works Department may be unable to complete routine road and flood control maintenance work in a