Loading...
HomeMy WebLinkAboutMINUTES - 03122013 - C.86RECOMMENDATION(S): AUTHORIZE the Public Works Director, or designee, to advertise for On-Call Contract(s) for Various Road and Flood Control Maintenance Work, Contract No. 0672-6U2009, for routine maintenance, repair, replacement, or reconstruction of existing road and flood control facilities, Countywide. FISCAL IMPACT: The On-Call Contract(s) for Various Road and Flood Control Maintenance Work is to be funded by Local Road and Flood Control funds (100%). BACKGROUND: The Public Works Department uses On-Call Contract(s) for Various Road and Flood Control Maintenance Work to provide support as needed to Public Works Maintenance crews for various routine road and flood control maintenance repairs, such as but not limited to, storm damage repair work, including rock slope protection, slope stabilization, culverts, and concrete structures, on an as-needed basis, in various locations within Contra Costa County. The Public Works Department intends to award at least one $300,000 contract, but not more than four $300,000 APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 03/12/2013 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Henry Finch, 925-313-7004 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: March 12, 2013 David Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: C.86 To:Board of Supervisors From:Julia R. Bueren, Public Works Date:March 12, 2013 Contra Costa County Subject:Advertise the On-Call Contract(s) for Various Road and Flood Control Maintenance Work BACKGROUND: (CONT'D) contracts, to the responsible bidder(s). Each contract will have a term of two years with the option of a one-year extension and will be used as needed with no minimum amount that has to be spent. CONSEQUENCE OF NEGATIVE ACTION: The Public Works Department may be unable to complete routine road and flood control maintenance work in a timely manner. CHILDREN'S IMPACT STATEMENT: Not applicable.