Loading...
HomeMy WebLinkAboutMINUTES - 03122013 - C.12RECOMMENDATION(S): APPROVE and AUTHORIZE the Chair, Board of Supervisor’s or designee, to execute a Temporary Construction and Access Easement, on behalf of the Contra Costa County Flood Control and Water Conservation District, for a temporary stockpile and pipeline protection area with Aviano Farms LLC., identified as a portion of APN 057-030-005 effective March 1, 2013 through March 31, 2014 for the Upper Sand Creek Basin Project, Antioch Area. Project No.: 7562-6D8518. APPROVE payment of $3,000.00 for said property rights and AUTHORIZE the Auditor-Controller to issue a check in said amount payable to Aviano Farms, LLC. to be forwarded to the Real Estate Division for delivery. DIRECT the Real Estate Division to have the above referenced Temporary Construction Easement recorded in the Office of the County Recorder. FISCAL IMPACT: Payment of $3,000 from Drainage Area 130 funds. APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 03/12/2013 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Cheryl Sousa, (925) 313-2252 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: March 12, 2013 David Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: C.12 To:Board of Supervisors From:Julia R. Bueren, Public Works Date:March 12, 2013 Contra Costa County Subject:Temporary Construction Easement for Upper Sand Creek Basin Project, Antioch area. BACKGROUND: The Contra Costa County Flood Control and Water Conservation District (District) plans to expand the Upper Sand Creek Basin (USCB) located in the southeast portion of the City of Antioch, south of Lone Tree Way and, east of Deer Valley Road. In 1992, this Board as governing Board of the District, approved the Final EIR for Sand Creek watershed improvements. This EIR considered eight alternatives made up of various detention basin sites throughout the watershed. After careful consideration, the Board chose Alternative 8, which included USCB in its current location. Phase One of the USCB was constructed in 1994 as part of Assessment District 27 in Antioch. The interim USCB currently receives local runoff from the adjacent subdivisions. The expansion will provide regional flood protection benefits for downstream communities. The USCB expansion project consists of excavating soil from the existing interim basin to create a deeper basin for holding storm water during major storm events, then slowly releasing this storm water though the outlet pipe; reducing peak flows downstream in both Sand and Marsh Creeks. The project will expand the interim basin to its ultimate size. The Temporary Construction Easement will allow the District to have a soil stockpile and pipeline protection area during the expansion of the basin. A Notice of Determination was filed and Posted on September 14, 1992, [CP#88-69, SCH 90030280]. CONSEQUENCE OF NEGATIVE ACTION: The District will not have sufficient rights for the construction phase of the project and will not be able to expand USCB to its ultimate configuration. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS Right of Way Contract