HomeMy WebLinkAboutMINUTES - 09301986 - 1.49 TO: REDEVELOPMENT AGENCY 1-049 FROM: PHIL BATCHELOR, EXECUTIVE DIRECTOR . DATE: September 30, 1986 SUBJECT: Approve Agreement to Relocate Transmission Line with PG&E, Pleasant Hill BART Station Street Improvements, Phase IIB, Project No. 7891-6X5591-85 Specific Request-53 or Recommendations & Background & Justification RECOMMENDED ACTION: APPROVE agreement to relocate the Lakewood-Meadow Lane 115 KV transmission line with PG&E and AUTHORIZE Executive Director or his designee to execute agreement for relocation of the PG&E electrical line .north of Treat Boulevard in the Jones Road right of way for the Pleasant Hill BART Station Street Improvements, Phase IIB Project, Project No. 7891-6X5591-85. FINANCIAL IMPACT: The agreement provides for relocation of the transmission line by PG&E forces at agency expense. Estimated cost of relocation work is $110,000. Funds are available from the agency. REASONS FOR RECOMMENDATION/BACKGROUND: The redevelopment plan calls for the construction of Jones Road north of Treat Boulevard and extends into the Pleasant Hill BART Station. This alignment supersedes the current location of Coggins Drive and is located somewhat easterly of Coggins alignment in order to align with Jones Road to the south of Treat Boulevard. PG&E' s 115 KV transmission line currently crosses Treat Boulevard on the east side of the Southern Pacific right of way. It then crosses the right of way and runs north to the Meadow Lane substation on the westerly side of the Southern Pacific right of way. This current location puts the transmission line poles in the middle of the new Jones Road alignment requiring relocation of the transmission line. Because PG&E has prior rights. to this location, the agency is responsible for relocation of the facility and the right of way that contains it. This agreement provides for the relocation by PG&E forces and for all costs by the agency associated with this relocation. CONSEQUENCES OF NEGATIVE ACTION: Nonapproval of this agreement will mean that PG&E will not relocate its transmission line. This will leave transmission line poles in the middle of Jones Road which is unacceptable. The roadway cannot be relocated because of commitment of right of way to the future light rail corridor to the east and the BART Station prop rty to the west. Continued on attachment: yes Signature: ,� Recommendation of Executive Director Recommendation of Agency Com0fttee Approve Other: Signature(s): Action of Agency on: ���6 Approved as Recommended Other Vote of Commissioners I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN -ACTION TAKEN 1� Unanimous (Absent--_2-- ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: REDEVELOPMENT AGENCY ON DATE SHOWN. Absent: Abstain: AttestedJ36. 9 �6 Orig. Div.: Redevelopment Agency (Constr. ) Phil Batchelor cc: Redevelopment Director Agency Secretary . Auditor-Controller Chief Engineer PW Design Construction Accounting �_ PG&E, c/o Warren Fuller By .L DEPUTY Regional Land Dept. 1919 Webster Street Oakland, CA 94612 LT/bb BO:23.t9