Loading...
HomeMy WebLinkAboutMINUTES - 09301986 - 1.4 (2) 1-040 TO: BOARD OF SUPERVISORS ' Contra FROM: PHIL BATCHELOR County Administrator Costa DATE: September 12, 1986 "1 SUBJECT: APPROVING FIRST AMENDMENT TO AGREEMENT FOR ARCHITECTURAL SERVICES FOR WEST COUNTY JUSTICE CENTER, RICHMOND (4411-4101; 0928-WH101B) SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION RECOMMENDATION: APPROVE the First Amendment to the Architectural Services Agreement with Dworsky/Design Partnership, a Joint Venture, and AUTHORIZE the County Administrator or his designee to execute the Amendment which will (1) revise the Fixed Limit of Initial Construction Contract Cost to $331152,220, (2) modify a portion of the design fee to 8.67 percent of the Fixed Limit of Initial Construction Contract Cost required to construct the off-site improvements including road and utility realignment and upgrading, and (3) reimburse the Joint Venture for any increased premiums. for Professional Liability Insurance resulting from expanded design services for providing off-site design services. FINANCIAL IMPACT:' This Amendment, in part will reduce the fees paid to the Architect. The reduction of the estimated Construction Contract Cost from $37,918,042 to $33,152,220 reduces the Architect's fee for the Schematic Design and Design Development phases by $95,077. This reduction will be partially offset by another part of this Amendment; which has the potential to increase the encumbrance for basic Architectural Services by a maximum of $40,400 (from a projected total architectural fee of.. $',204,623 to $2.245,023) and increase the reimbursable limit for Professional Liability Lnsurance from I'l_'10,470 to $211,500. The $40,400 increase for Architectural Services is based on the assumption that off-site construction costs shall not exceed $2,000,000 of the $33,152,220 construction budget. If this- work has a lower construction estimate, the financial impact will be proportionately less REASONS FOR RECOMMENDATION/BACKGROUND: A. On December . 17, 1985, the Board approved and the County executed an Architectural Services Agreement . with Dworsky/Design Partnership for two phases of architectural service: Schematic Design and Design Development. The contract also established a total full service fee of 6.65 percent of the Fixed Limit of Initial Construction Contract Cost based on the limit to be established in the -Predesign Program (the contract estimated an Initial' Construction Contract Cost .of $37,918,042, which is now being revised 'to $33,152,220 based on the Board of Supervisors' July 8, 1986 approval of the Predesign Program). The percentage fee becomes effective when the contract is amended to include full services upon completion of the Design Development Phase. In addition, the contract provides for the reimbursement of premiums for Professional Liability Insurance up to a total $210,470. CONTINUED ON ATTACHMENT: X YES SIGNATURE: X RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OA D COMMITTEE X APPROVE OTHER SIGNATURE(S) ACTION OF BOARD ON Ju 1986 APPROVED AS RECOMMENDED OTHER VOTEOFSUPERVISORS v UNANIMOUS (ABSENT. ) I HEREBY CERTIFY THAT THIS IS A TRUE AYES: NOES: AND CORRECT COPY OF AN ACTION TAKEN ABSENT: ABSTAIN: AND ENTERED ON THE MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. CC: CAO —Justice System Programs ATTESTED SEP 3 0 1986 Gen'1 Svcs. Dept. - R. Rygh, T. Mann II Batchelor, Cletk of the Board o County Administrator - D. Bell UpetYisnadC&AtyAdmm*ft County' Counsel Auditor-Controller - M302/7-e3 Sheriff-Coroner BY _�� � DEPUTY Dworsky/Design Partnership (Via CAO) � J APPROVING FIRST AMENDMENT TO AGREEMENT FOR ARCHITECTURAL SERVICES Page Two FOR WEST COUNTY JUSTICE CENTER; RICHMOND (4411-4101; 0928-WH101B) The Architectural Services Agreement was negotiated between April and December 1985, before the decision was made to relocate Atlas Road and Giant Highway and the utilities that parallel these two roads. Although limited off-site work was anticipated, the extent 'of this specialty civil engineering service was not anticipated nor considered during contract negotiation. The Architect has selected a local engineering firm' with experience in off-site road and utility design. This amendment adjusts the Architect's fee to provide for these extra services. The selection of a local firm with experience in this type of engineering design work, as well as familiarity in city and utility company requirements and standards, should .expedite this phase of the project and has the potential to decrease the County's cost for .off-site construction.. In addition, the insurance underwriter, in calculating premiums for Professional Liability Insurance, did not initially include coverage for off'-site design services. B. The project is currently in the Schematic Phase of Design. In order for the project to proceed. without delay or 'discontinuity of service, it is necessary to amend the Agreement for Architectural Services to provide for these expanded services to be provided by a civil engineering firm with off-site engineering expertise and knowledge of the northern Richmond area. Approval of this Amendment will modify the Agreement to require the Architect to provide professional services for this expanded scope of work. This amendment does not affect the extent of these services which remain limited to the Schematic Design and Design Development Phases; a separate contract amendment will required to authorize the Contract Documents Phase.