Loading...
HomeMy WebLinkAboutMINUTES - 08212012 - C.06RECOMMENDATION(S): APPROVE the San Pablo Dam Road Walkability Project, and AUTHORIZE the Public Works Director, or Designee, to advertise the project [DCD-CP#11-75] Project No.: 0662-6R4051, and FIND the project is a California Environmental Quality Act (CEQA), Class 1c Categorical Exemption, pursuant to Article 19, Section 15301(c) of the CEQA Guidelines, and DIRECT the Director of Conservation and Development to file a Notice of Exemption with the County Clerk, and AUTHORIZE the Public Works Director to arrange for payment of $25 fee to Conservation and Development for processing, and a $50 fee to the County Clerk for filing the Notice of Exemption. APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 08/21/2012 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Candace Andersen, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Kimani Birden, 925-313-2190 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: August 21, 2012 David Twa, County Administrator and Clerk of the Board of Supervisors By: STACEY M. BOYD, Deputy cc: C. 6 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:August 21, 2012 Contra Costa County Subject:APPROVE San Pablo Dam Road Walkability Proj & AUTHORIZE Public Works Director, or Designee, to advertise the project, make related CEQA findings FISCAL IMPACT: This project is funded with Transportation for Livable Communities 55%, Prop 1B 30%, and Local Road funds 15%. BACKGROUND: The purpose of this project is to reconstruct and adjust sidewalk features along an existing section of San Pablo Dam Road within the County right of way to provide an unobstructed path of travel that is compliant with the Americans with Disabilities Act (ADA). The project consists of the reconstruction or redesign of existing concrete sidewalk, curb ramps and gutters along an approximately 2,700 foot section of San Pablo Dam Road, between Appian Way and El Portal Drive, compliant with ADA standards. The project will include drainage improvements and utility adjustments. The project will also construct potted landscaping, improve existing signage, and relocate bus stop signage. The project may remove approximately five bus stop benches that obstruct ADA and pedestrian traffic. Some illegal parking areas have encroached into the County’s sidewalk right of way obstructing pedestrian traffic, so they will be adjusted to increase sidewalk accessibility. These improvements to the County’s sidewalk right of way will create more accessibility for pedestrian traffic and members of the community that require ADA compliant sidewalks. The project will require temporary construction easements for selected driveways. It may be necessary to remove 40 urban landscape trees (i.e. street trees) to accommodate the improvements; however the project also includes landscaping with street trees. In order to minimize damage to any nearby trees that will not be removed, any roots exposed during excavation will be cut cleanly. In addition, tree branches and shrubbery may need to be trimmed throughout the project. To ensure compliance with the Migratory Bird Treaty Act (MBTA), trees will be removed outside the nesting season (February 15th to August 31st), or a preconstruction nesting survey will be conducted. Prior to construction, affected property owners will be notified by the contractor of the upcoming construction activity and access to private property or businesses will be maintained throughout the project. Emergency vehicles will have access through the project area at all times. Real property transactions and utility relocation may be necessary in support of this project. CONSEQUENCE OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design, construction and loss of funding. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS Signed IS NOE Project Figures 1-3