HomeMy WebLinkAboutMINUTES - 06262012 - C.09RECOMMENDATION(S):
1) APPROVE plans, specifications, and design for the above project (Project Nos. 0672-6U2170-12 &
0662-6R4105-12).
(2) DETERMINE that Graham Contractors, Inc. (“Graham”), the lowest monetary bidder, has complied with the
requirements of the County’s Outreach Program for this project, as provided in the project specifications, and
FURTHER DETERMINE that Graham has submitted the lowest responsive and responsible bid for this project.
(3) AWARD the construction contract for the above project to Graham in the total amount ($1,665,448.53) and the
unit prices submitted in the bid and DIRECT that Graham shall present two good and sufficient surety bonds as
indicated below, and that the Public Works Director, or designee, shall prepare the contract.
(4) ORDER that, after the contractor has signed the contract and returned it, together with the bonds as noted below
and any required certificates of insurance or other required documents, and the Public Works Director has reviewed
and found them to be sufficient, the Public Works Director, or designee, is authorized to sign the contract for this
Board.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 06/26/2012 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Candace Andersen, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Kevin Emigh, (925)
313-2233
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: June 26, 2012
David Twa, County Administrator and Clerk of the Board of Supervisors
By: STACEY M. BOYD, Deputy
cc:
C. 9
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:June 26, 2012
Contra
Costa
County
Subject:AWARD & AUTHORIZE Execution of Contract for the 2012 Tara Hills Term. Blend Cape Seal & N. Richmond
Slurry Seal proj., Tara Hills & N. Richmond areas.
RECOMMENDATION(S): (CONT'D)
(5) ORDER that, in accordance with the project specifications and/or upon signature of the contract by the Public
Works Director, or designee, any bid bonds posted by the bidders are to be exonerated and any checks or cash
submitted for security shall be returned.
(6) ORDER that, the Public Works Director, or designee, is authorized to sign any escrow agreements prepared for
this project to permit the direct payment of retentions into escrow or the substitution of securities for moneys
withheld by the County to ensure performance under the contract, pursuant to Public Contract Code Section 22300.
(7) DELEGATE, pursuant to Public Contract Code Section 4114, to the Public Works Director, or designee, the
Board’s functions under Public Contract Code Sections 4107 and 4110.
(8) DELEGATE, pursuant to Labor Code Section 6705, to the Public Works Director or to any registered civil or
structural engineer employed by the County the authority to accept detailed plans showing the design of shoring,
bracing, sloping, or other provisions to be made for worker protection during trench excavation covered by that
section.
(9) DECLARE that, should the award of the contract to Graham be invalidated for any reason, the Board would not in
any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject all
of the bids received. Nothing in this Board Order shall prevent the Board from re-awarding the contract to another
bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract, or fails to furnish
required bonds or insurance (see Public Contract Code Sections 5100-5107).
FISCAL IMPACT:
The construction contract will be funded by 88% Road funds and 12% CalRecycle Rubberized Asphalt Grant funds.
BACKGROUND:
The above project was previously approved by the Board of Supervisors, plans and specifications were filed with the
Board, and bids were invited by the Public Works Director. On May 15, 2012, the Public Works Department received
bids from the following contractors:
BIDDER, TOTAL AMOUNT, BOND AMOUNTS
Graham Contractors, Inc., Inc. $1,665,448.53
Payment Bond: $1,665,448.53
Performance Bond: $1,665,448.53
Western Pavement Solutions $1,804,460.60
International Surfacing Systems $3,322,787.00
The bidder listed first above, Graham Contractors, Inc. (“Graham”), submitted the lowest responsive and responsible
bid, which is $139,012.07 less than the next lowest bid.
The Public Works Director has determined that Graham documented an adequate good faith effort to comply with the
requirements of the County’s Outreach Program, as provided in the project specifications, and the Public Works
Director recommends that the construction contract be awarded to Graham.
The Public Works Director recommends that the bid submitted by Graham is the lowest responsive and responsible
bid, and this Board so concurs and finds.
The Board of Supervisors previously determined that the project is exempt from the California Environmental Quality
Act (CEQA) as a Class 1(c) exemption, and a Notice of Exemption was filed with the County Clerk on March 28,
2012.
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with
the Clerk of the Board, and copies will be made available to any party upon request.
CONSEQUENCE OF NEGATIVE ACTION:
Construction of the project would be delayed, and the project might not be built.
CHILDREN'S IMPACT STATEMENT:
Not applicable.