Loading...
HomeMy WebLinkAboutMINUTES - 02251986 - X.5 x � THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on February 25, 1986 by the following vote: AYES: Supervisors Fanden, Schroder, McPeak, Torlakson & Powers NOES : None ABSENT: None ABSTAIN: None SUBJECT: In the Matter of Award of Contract for San Pablo Dam Road Slide at Sta. 250, Project No. 0671-6R6717-83, Orinda Area. Bidder Total Amount Bond Amounts Kulchin & Associates, Inc. $194,850.00 Payment $97,475.00 PO Box 151 Faith. Perf. $194,850.00 South San Francisco, CA 94080 Soil Engineering Construction, Inc. William P. Young, Inc. Messa Construction Co. Schnabel Foundation Company Brudigam Construction, Inc. J. H. Pomeroy & Co. , Inc. Ross Bros. Construction, Inc. Benco Construction and Engineering, Inc. 0. C. Jones & Sons Pleasanton Engineering Contractors R. L. Davis Construction Co. , Inc. R. M. Harris Co. M.T.L. Construction Co. , Inc. Valentine Corporation M & M Drilling Power-Anderson, Inc. The above-captioned project and the specifications therefor being approved, bids being duly invited and received by the Public Works Director; and The Public Works Director recommending that the bid listed first above is the lowest responsible bid and this Board concurring and so finding; IT IS BY THE BOARD ORDERED, that the contract for the furnishing of labor and materials for said work is awarded to said first listed bidder at the listed amount and at the unit prices submitted in said bid; and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Public Works Department shall prepare the contract therefor. IT IS FURTHER ORDERED that, after the contractor has signed the contract and returned it together with bonds as noted above and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director is authorized to sign the contract for this Board. IT IS FURTHER ORDERED that, in accordance with the project specifica- tions and/or upon signature of the contract by the Public Works Director, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned. Orig.Dept.: Public Works Department (D/C) ihereby cerlifytha,ihisisatrue and correct copy of an action taken and entcrad on the r..Inutes of the Board of Supervisors on the date shown. cc: County Administrator ATTESTED: FEB 2 .9 mqs Auditor-Controller PHIL BATCHELOR, C'erk of the Saa;d P. W. Accounting Contractor of Supervisora and County"-Idmiristrator Award.S P.t4 By �M� . Deputy