Loading...
HomeMy WebLinkAboutMINUTES - 05222012 - C.03RECOMMENDATION(S): APPROVE and AUTHORIZE the Public Works Director, or designee, to execute Amendment No. 3, effective April 24, 2012, to an existing Consulting Services Agreement with AECOM Technical Services, Inc., effective November 14, 2000, to revise the consultant’s name and address, increase the current payment limit by $99,375.96 to a new payment limit of $816,286.44, extend the completion date to June 30, 2012, and to amend Appendix A in order to provide additional work associated with the final design and construction support phases for the Bethel Island Road Bridge Replacement Project, Bethel Island area. (Project No. 0662-6R4043-02) FISCAL IMPACT: This Consulting Services Agreement Amendment allows for an additional $99,375.96 above the previously approved contract payment limit of $716,910.48. The increase in payment is to be funded by Federal Highway Bridge Program (HBP) funds and local road funds (80% federal, 20% local). BACKGROUND: On November 14, 2000, the Board of Supervisors approved the Consulting APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 05/22/2012 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor ABSENT:Gayle B. Uilkema, District II Supervisor Contact: Neil Leary, (925) 313-2278 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: May 22, 2012 David Twa, County Administrator and Clerk of the Board of Supervisors By: STACEY M. BOYD, Deputy cc: C. 3 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:May 22, 2012 Contra Costa County Subject:Amendment No. 3 to Consulting Services Agreement with AECOM Technical Services, Inc. (Project No. 0662-6R4043-02) BACKGROUND: (CONT'D) Services Agreement (CSA) with AECOM Technical Services, Inc. (successor to Earth Tech (infrastructure) Inc. and J. Muller International) to provide professional bridge design services for the Bethel Island Road Bridge Replacement Project. Bridge design services are required for the design of this project. AECOM Technical Services, Inc. has been assisting County staff by providing bridge design services, technical support, coordination with regulatory and outside agencies, and construction support throughout the design and construction phases of this project. The proposed amendment will amend the consultant’s name and address, payment limit, completion date, and Appendix A to that described in the CSA. This amendment is needed due to additional work associated with the Final Design and Construction Support phases, such as revised plans and specifications to address unanticipated regulatory and outside agency coordination (i.e. U.S. Coast Guard, utilities, Reclamation District 799, and Bethel Island Municipal Improvement District), retaining wall design, and participating in Value Analysis Study. CONSEQUENCE OF NEGATIVE ACTION: If the amendment is not approved, AECOM Technical Services, Inc. cannot be paid for the additional required work. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS CSA