HomeMy WebLinkAboutMINUTES - 05222012 - C.01RECOMMENDATION(S):
APPROVE and AUTHORIZE the Public Works Director to execute the Temporary Construction Permit and
Sidewalk Conform with SVF Oak Road Walnut Creek Corporation, effective August 1, 2012 through December 31,
2012, for the Contra Costa Centre Infrastructure Project, as recommended by the Public Works Director. Project No.:
0662-6R4120
FISCAL IMPACT:
No fiscal impact.
BACKGROUND:
Contra Costa County (County) is required to obtain a Temporary Construction Permit and Sidewalk Conform for the
Contra Costa Centre Infrastructure Improvements Project in order to ensure the curb ramps meet current ADA
standards. As a condition of the permit, the Property Owners have required the County to indemnify them. Without
the Property Owner’s approval to remove and replace the sidewalk within their property line, there will be a
difference in the elevation between the existing sidewalk and the improved sidewalk. This project will not proceed
until it is approved by the County Finance Departments.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 05/22/2012 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
ABSENT:Gayle B. Uilkema, District II
Supervisor
Contact: Angela Bell, 925 313-2337
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: May 22, 2012
David Twa, County Administrator and Clerk of the Board of Supervisors
By: STACEY M. BOYD, Deputy
cc: Maureen Flores. Real Property, R. Shimano, Design
C. 1
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:May 22, 2012
Contra
Costa
County
Subject:Temporary Construction Permit for Contra Costa Centre Infrastructure Improvements Project
CONSEQUENCE OF NEGATIVE ACTION:
After the project is completed, there would be a difference in the elevations between the existing and the improved
sidewalks.
CHILDREN'S IMPACT STATEMENT:
Not Applicable