HomeMy WebLinkAboutMINUTES - 02282012 - C.31RECOMMENDATION(S): ACCEPT status report prepared by the County Administrator's Office on American Recovery and Reinvestment Act (ARRA) funds in Contra Costa County, as recommended by the Legislation Committee. FISCAL IMPACT: This status report provides information about the fiscal impact of the federal ARRA stimulus funds on Contra Costa County. BACKGROUND: On February 17, 2009, President Obama signed into law the American Recovery and Reinvestment Act (ARRA) of 2009. P.L. 111-5, Section 1512 of the Recovery Act requires each organization to report on the use of Recovery Act funding. The Recovery Accountability and Transparency Board ("Recovery Board") has identified and deployed a nationwide data collection system at the website FederalReporting.gov that serves to collect data required by Section 1512. Recipient data reported to FederalReporting.gov was uploaded to Recovery.gov on January APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 02/28/2012 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor ABSENT:Gayle B. Uilkema, District II Supervisor Contact: L. DeLaney, 925-335-1097 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: February 28, 2012 David Twa, County Administrator and Clerk of the Board of Supervisors By: Carrie Del Bonta, Deputy cc: C.31 To:Board of Supervisors From:Legislation Committee Date:February 28, 2012 Contra Costa County Subject:Status Report on Contra Costa County's ARRA Federal Stimulus Funds 30, 2012 for public viewing. Recovery.gov is the U.S. government's official website where information and data on Recovery Act spending is available for public access. The site also provides for potential fraud, waste, and abuse reporting. The 2011 4th quarter reporting period was from January 1 to January 14th, 2012. This reporting period covers work completed through December 31, 2011. Contra Costa County was in compliance with the 4th quarter reporting period. To date, Contra Costa County has been awarded over $71.6 million in funds and has received $65,963,189. Staff has prepared this status report on the ARRA funds that Contra Costa County has either received through formula grants or through competitive grants. Staff of the CAO and the Auditor-Controller are collaborating to ensure that all reporting requirements are met and all relevant information is captured. The status report also identify the impact of all ARRA funds in terms of job creation, economic impact, social impact, and cost avoidance, and we have endeavored to capture that information from department staff managing the funds. The spreadsheet identifying the County's participation in ARRA funding opportunities is attached; it is being continuously updated as information from Departments is provided. It is also provided on the County’s website, under the ARRA Stimulus Funding tab. BACKGROUND: (CONT'D) Noteworthy accomplishments of the County’s ARRA funds: 1. On December 12, 2009, Contra Costa Health Services was awarded $12 million to relocate and rebuild the Richmond Health Center. Funds were awarded through a competitive grant process for a one-time facility improvement opportunity to address significant and pressing capital improvement needs in health centers, including construction and renovation. Status of the Clinic: HVAC roof curbs, skylights curbs and equipment pads are completed. The interior wall framing and the mechanical, electrical & plumbing ceiling rough-ins are ongoing on the first and second floors. Hanging of the gyp board on the first floor and the exterior wall framing are also in progress. The installation of the rigid foam insulation for exterior walls is expected to start this week. Finally, the roofing insulation has been installed and roofing in progress. Status of the Parking Structure: The concrete for the structure is completely poured. The mechanical, electrical & plumbing rough-ins and setting of miscellaneous iron imbeds are complete and the sack and patch of the structure walls is currently in progress. Going Forward: On January 10, 2012 the Board of Supervisors approved the plans, specifications, and design for the bid packages for site concrete/caulking, flooring, landscaping and irrigation, miscellaneous specialties, and miscellaneous metal phase 2. This work is expected to start by the end of January 2012. Contra Costa Health Services has received its requested “Extension Without Funds” for this project through December 31, 2012. The completion date of this project, however, is currently projected to be October 2012. 2. Contra Costa Health Services also has received a Capital Improvement Project grant for $683,020 for construction of a new modular unit for the Martinez family practice site. The existing building is in need of replacement due to asbestos in the walls and a non-operating HVAC system. The asbestos remediation costs exceed the value of the building, making repair/renovation unfeasible. Since Fall 2008, this building has become almost uninhabitable, impeding clinical services significantly with compacted services at other service sites. The County has expended $203,460 through December 2011. The Family Health Centerconstruction documents have been reviewed and approved by the Department of Conservation and Development. The Board of Supervisors authorized the General Services Department to solicit bids on January 10, 2012. Bid packages for the first phase of construction are expected to be received by February 23, 2012. Construction should begin the first week of April 2012. 3. Community Development Block Grant (CDBG-R): The Board of Supervisors approved allocating funds to fourteen projects to help finance infrastructure improvements that provide basic services to lower income residents. As of December 31, 2011, thirteen projects have been successfully completed. A total of $812,711 has been spent and 12.3 FTE construction jobs have been created. The remaining project is currently out-to-bid and is expected to be completed by June 2012. 4. Homeless Prevention and Rapid Rehousing Program (HPRP): As of December 31, 2011, the County has expended $1,320,009 (93%) of its allocation and anticipates expending all funds by spring 2012. HPRP partners have far exceeded the original estimates for number of families served – to date a total of 548 Contra Costa County families have been provided homeless prevention and rapid re-housing services. The County will continue to work with local service providers to assist clients in need and will make referrals to local partner agencies to help keep families from falling into homelessness or moving homeless families into more permanent housing. 5. Energy Efficiency and Conservation Block Grants (EECBG): The County was awarded $3,574,300 in EECBG funds and has expended $2,186,830 through December 2011. Several notable highlights are the successful completion of 4 activities: LED Street Light Replacement (Activity #2), County Employee Commute Program/Telecommuting and Compressed Work Week Outreach (Activity #5), Employee Energy Conservation Campaign (Activity #6), and the Property Assessed Clean Energy [PACE] Financing Program (Activity #8). Work is still in-progress on the remainder of the funded activities. 6. The amount of ARRA funds utilized for the Vasco Road Safety Improvement Project was $11,279,083. This was increased from the $10 million originally received. The additional amount of ARRA funds came from savings from the Vasco Road Overlay project (below) and from other cost savings realized from other jurisdictions in Contra Costa County. Project construction is complete. Minor punch list items have been completed or are in the process of being completed. Final invoicing for the project is in progress. The project completed the connection in the southbound truck climbing/passing lane, bridge widening, retaining walls and the installation of a concrete median barrier. 7. The amount of ARRA funds received for the Vasco Road Overlay Projectwas $2,762,000. However, given the low bids received and additional savings to this project during construction, some of those savings were applied to the Vasco Road Safety Improvement project as stated above. The remaining portion of ARRA funds applied to the Vasco Road Overlay project was $1,945,770. The project is complete and payments to contractor are complete. The project provided rehabilitation of the road surface, extending the life and providing a smoother ride surface for the motoring public. 8. Workforce Development Board: Projects & Efforts Still Active in 2011 (and into 2012) Summer Youth Employment Program (SYEP). The WDB and its primary youth service providers, the Contra Costa County Office of Education and Henkels & McCoy Training Services placed more than 1600 youth into summer jobs in 2009 and 2010 using ARRA funds. In the absence of ARRA funds in 2011, the WDB and its youth contractors were able to secure $31,000 in funding (non-WIA) to help support an effort that ultimately helped more than 100 young people obtain summer jobs across Contra Costa County. More than 40 of these jobs resulted in permanent employment for out-of-school youth who were directly hired by private businesses. The WDB continues to make this program a priority for 2012 and will be leveraging a White House initiative called Summer Jobs+, which calls for businesses, nonprofits, and government to work together to provide avenues to employment for low-income and disconnected youth in the summer of 2012. The initiative commits the federal government and the private sector to creating 180,000 summer employment opportunities for youth. Employers are invited to participate by providing a range of work opportunities such as internships, on-the-job training, mentoring programs, workshops, and job shadow days. Building on our Assets: Economic Development and Job Creation in the East Bay: The Workforce Development Board of Contra Costa County was a major investor and partner in this report, which was released in October 2011 by the East Bay Economic Development Alliance (East Bay EDA). The report highlights the fact that despite the current economic situation, the East Bay has underlying assets that bode well for the region’s future: a highly educated workforce, world-class research and development institutions, growing innovation industries in life science and clean and renewable energy, a central location, vital goods movement infrastructure at the Port of Oakland, and a wide variety of housing options, open space and recreational opportunities, give the region East Bay an edge over other regions. The Building on our Assets report has quickly become the signature analysis of the East Bay economy and is helping the Workforce Development Board of Contra Costa County, along with East Bay EDA and other partners to drive planning efforts across Contra Costa County and the region during these exceedingly dynamic times. Diablo Innovation Alliance (DIA): The Diablo Innovation Alliance (DIA), which has received a lot of local and regional support from business, economic development organizations, educational institutions, and elected officials, is one of the signature projects that the WDB helped to launch with a “seed grant” of $200,000 in ARRA funds. The DIA culminated in the development of a “regional action plan” that identifies how the East Bay can help to accelerate clean energy research and innovation, manufacturing, and market adoption through regional collaboration and industry clusters. This project continues to be supported by the WDB as it looks to develop education and training programs aligned with the emerging needs in the clean energy and water technology industry clusters. The DIA is being implemented by the Contra Costa Economic Partnership (CCEP) and was recently bolstered with the award of a $500,000+ grant from the U.S. Department of Energy Rooftop Solar Challenge, a national program to encourage cities and counties to compete to streamline and digitize solar permitting. The DOE funds will be used to develop the first phase of a solar permitting process within Contra Costa County that encourages local jurisdictions to standardize permit requirements so they are easily understood, consistent, timely and cost effective. Subsequent phases and funding would involve the three-county region; successful implementation would serve as a best practice model for statewide adoption. Expanded Service Capacity: Thanks to policy support from the U.S. Department of Labor and the State of California, the WDB has been able to ensure a smooth transition into the post-ARRA environment. These policies have helped to sustain a continued high level of services to businesses and (especially) job seekers through our EASTBAY Works One-Stop Career Centers and three community-based contractors that have been trying to help get people back to work following the worst economic downturn since the Great Depression. ARRA funds helped to more than double the number of job seekers receiving staff-assisted services through the local workforce system, and with many of these individuals still in the process of securing employment, the WDB is pleased to have sufficient resources to continue services at this level until June 2012. Completed Projects Microsoft Office Suite (MOS): More than 200 individuals were trained in basic Microsoft Office applications at adult school campuses, and more than 80% have successfully completed the program. More than half of them have found employment, most of which has been training-related. BPI Training: One of the “gold standard” certifications that licensed contractors and other building professionals need to retain their competitive edge are offered through the Building Performance Institute (BPI). Two particular BPI certification programs – Building Analyst Professional and Building Envelope Professional have become important certifications for contractors that seek to obtain work to create more energy efficient homes. The WDB’s ARRA Rapid Response funding helped to provide training to twenty-one (21) licensed contractors located in East Contra Costa County. 9. Community Services Bureau EHS ARRA Expansion- Early Head Start (EHS) ARRA Expansion provided 170 additional infant/toddler slots throughout the county in Bay Point, Martinez, Rodeo, Concord, Antioch, Oakley, North Richmond and Richmond in addition to the Home Based program. As of September 30, 2011 EHS Expansion concluded and CSB successfully achieved its goals to expand the EHS program and meet the needs of EHS eligible families. EHS Expansion funds and the services and slots supported by these funds continue at this time as part of CSB’s EHS base grant. Achievements include increased services to eligible families, infant/toddler facility and classroom upgrades, support to teachers to obtain the newly required 6 additional units in infant/toddler care coursework, increased professional development opportunities to enhance knowledge of best practices for infant/toddler care-giving, and expanded technology support to staff. Head Start/Early Head Start Early Learning Mentor Grant – The HS/EHS Early Learning Mentor program provides mentoring for 12 CSB, Delegate Agency and Child Care Partner teacher protégés. Mentoring is provided by 4 early childhood consultants. Although this grant will conclude February 29, 2012, the program will continue by utilizing the protégés as the nucleus of an expanding and ongoing mentor program for the continued development of high quality professional early care and education specialists. The protégés and mentors will participate in planning sessions with the education managers and assistant directors on how coaching and mentorship can be expanded in the Community Services Bureau. This plan will be tailored to the agency’s school readiness and family engagement goals. As a result of this grant CSB has strengthened and formalized its mentorship of teachers by allowing a focus on more individualized mentoring and leadership development. Protégés have demonstrated more effective facilitation, clarity of learning objectives and implementation of individualized education plan for the children. There is evidence of improved partnership with the parents in their children’s education. Protégés and their mentors are preparing for a culminating event on February 17, 2012 in which protégés will make individual professional presentations around what they have learned to all CSB directors, site supervisors and managers. DOE/Weatherization- The California Department of Community Services and Development awarded additional funding to the Bureau’s Department of Energy (DOE) ARRA Weatherization Program in the amount of $1,101,321. The additional funding raises the contract payment limit to $4,554,300. This contract ends March 31, 2012. In July 2011, the State awarded additional funding to the Bureau’s Department of Energy (DOE) Weatherization Assistance Program ARRA. The additional funding of $500,000 will allow the Bureau to weatherize more dwellings owned or occupied by the County’s low-income individuals and families. A total of 1,085 units were weatherized from January 1, 2011 through January 31, 2012. 10. Workforce Services Bureau • Through our Subsidized Employment Training (SET) program funded with TANF ECF funds, the Workforce Services Bureau (WSB) engaged 416 public, private, and non-profit employers who employed over 1,000 CalWORKs participants and other low income residents and youth throughout the county. • A total of $1,347,667 was used as in-kind match to the TANF ECF funds to fund the SET program. • Three hundred and fifty-eight (358) participants obtained permanent employment as a result of their involvement in the SET program. The WSB also partnered with EastBayWORKs using Workforce Investment Act (WIA) funds to transition over thirty (30) SET participants into “On the Job” (OJT) training slots to secure permanent employment. • The Workforce Services Bureau also established community collaborations that allowed them to leverage TANF ECF funds to provide thousands of low-income EHSD families with food boxes, school supplies, and transportation vouchers. • The Workforce Services Bureau partnered with K to College and local school districts for the distribution of educational supplies to elementary school children throughout Contra Costa County. • The Bureau also contracted with local taxi companies to provide transportation to qualifying participants as well as with the Food Bank to provide food boxes to families with an episodic food security need. These services were provided throughout the county. • A total of $1,241,711 of TANF ECF dollars were spent on the school supplies, transportation vouchers, and food boxes providing support to approximately 57,841 Contra Costa residents. 11. Anti-Drug Abuse Enforcement Team Recovery Act Program: The position filled by the attorney funded by the ADA grant would not exist but for the grant funds. Over the last year, the grant attorney has worked with Federal (FBI, DEA and Homeland Security) and State Agencies (BNE, and Multijurisdictional Task Forces), in enforcement operations that has led to the dismantling and disruption of several drug trafficking organizations. In one case, several Northern California cells of a large international “ecstasy” smuggling and distribution group were dismantled, resulting in the arrests of nine individuals, seizure of over 60,000 ecstasy pills, and the seizure of over $125,000.00. Prosecution of defendants is ongoing. Spin-off investigations continue. Other notable investigations coordinated with law enforcement agencies resulted in the seizure of over 150 pounds of methamphetamine, 15 pounds of cocaine, and more than 400 pounds of marijuana. Over 50 major drug dealers have been charged with various drug trafficking offenses, and over $450,000.00 were seized. It is likely that much of the funds that were seized would have found their way to support further criminal activities. The ADA attorney has also been instrumental in assisting law enforcement in the prosecution of drug trafficking street gangs. Over 15 defendants were convicted of gang activity in connection with their drug dealing. Efforts targeting these individuals continue to be a priority. CONSEQUENCE OF NEGATIVE ACTION: This report is for informational purposes. ATTACHMENTS ARRA Tracking Report 02.15.12 American Recovery and Reinvestment Act of 2009 Contra Costa County Participation Department Amount Awarded Amount Received to Date Use of Funds Program Jobs Impact Economic Impact Social Impact Reporting Requirements Agriculture Department $ 10,980 $ 10,980 Work in coordination with the Bay Area Early Detection Rapid Response Coordinator to treat priority Contra costa County populations of certain designated noxious weeds, including Russian knapweed (Acroptilon repens), purpose loostrife (Lythrum salicaria), castor bean (Ricinus communis), and red sesbania (Sesbania punicea). Bay Area Early Weed Detection and Rapid Response Regional Model Project 198 hours of billed labor All infestations are incipient and, with the exception of castor bean, have been treated by the Department for eight plus years in an effort to stop their spread which would result in harm to agriculture and cause harmful changes to the natural environment of Contra Costa County. Quarterly invoice. Department of Conservation and Development/ Redevelopment Division $ 929,719 $ 812,711 Infrastructure projects that provide basic services to residents or activities that promote energy efficiency and conservation through the rehabilitation/retrofitting of existing buildings. CDBG (Community Development Block Grant) 12.31 FTE jobs created to date.Will finance at least $900,000 in constructon activity Prevailing wage jobs will be created; small business/microenterprse assistance; envergy efficiency or conservation. Activities are required to create or retain jobs or promote economic opportunity for lower income persons/households; or promote energy conservation, smarth growth, green buidling technology, or reduce pollution emissions. Through the normal CDBG reporting process with an emphasis on reporting on jobs created or retained. Department of Conservation and Development/ Redevelopment Division $ 1,421,511 $ 1,320,009 Homeless Prevention and Rapid Re-Housing activities. To rapidly re-house families who fall into homelessness, or prevent them from becoming homeless in the first place. The funding is provided to help persons and families facing a sudden financial crisis that could lead to homelessness. Homeless Prevention and Rapid Rehousing (HPRR) 3.37 FTE jobs created to date.Program helps reduce the incidence of homelessness and the impact that has on the social service network, and help homeless families move to permanent housing . Individuals and families who are at risk of becoming homeless will be provided assistance so they can stay in their homes, and individuals and families who are homeless will be able to access permanent housing in a more timely manner Reporting outcomes through HMIS is required. Department of Conservation & Development $ 3,574,300 $ 2,186,830 The County has proposed to fund the following activities under this grant program: 1. Lighting Improvements for County Buildings 2. Streetlight Upgrades 3. County Building Retrofits 4. Renewable Power for County Buildings 5. Employee Commute Program 6. Employee Energy Conservation Campaign 7. Grants to Retrofit Non-Profit Facilities 8. Property Assessed Clean Energy (PACE) Financing Program 9. Supplemental Retrofit Program for Weatherization Assistance Households 10. Energy Efficiency Assessments & Outreach for Private Sector Buildings 11. Permit Fee Rebates for Residential/Commercial Solar Projects 12. Expanded Weaterization Retrofit Program & Training 13. Energy Efficiency & Conservation Toolkit 14. Update Zoning Code & Standards to Reduce Vehicle Miles Traveled Energy Efficiency and Conservation Block Grants 39.66 Jobs Created/Retained to date (where 1 job = 520 hours worked per quarter) Will finance well over $1M in building and lighting improvements which are expected to reduce the amount of energy used by County buidings resulting in direct ongoing cost savings. Funding allows for improvment projects that would not otherwise have moved forward in the near-term, thereby providing new employment opportunities for local administrative staff, engineers, technicians, inspectors, construction contractors, carpenters, equipment/material providers, etc. Portion of funding to be used for construction-related activities will result in new opportunities for additional local prevailing wage jobs. Additionally, all activities being funded are intended to increase energy efficiency and conservation which will reduce greenhouse gas emissions being generated from the County's own municipal buildings as well as private sector buildings located in the unincorporated area. Applicable reporting requirements are quite detailed and differentiate between what is required to be submitted Quarterly, Annually and at Final Closeout. Quarterly reporting requirements appear to be most comprehensive (some of the specifics have yet to be finalized and released by the DOE), however would at a minimum would include reporting certain details regarding expnditures and outcomes related to the five specified metrics (1-Jobs created and/or retained, 2-Energy savings on a per dollar invested basis, 3-Renewable energy capacity installed, 4-Greenhouse gas emissions reduced and 5-Funds leveraged). District Attorney $ 492,869 $ 348,993 The goal of the project will be to control, reduce and/or prevent criminal narcotic activity, including drug-related violence in Contra Costa County. The grant attorney will provide assistance regarding all aspects of investigations to the multi-jurisdic Anti-Drug Abuse Enforcement Team Recovery Act Program 73% FTE Deputy District Attorney; 1 FTE Deputy Sheriff Data developed from individual agencies may indicate the success of a particular team or juridiction; however, the overall impact of enfrocement activity cannot be measure by recording statistics alone. These statistics must be evaluated in terms of overa The Task Forces have functioned as viable resources to the law enforcement community in its efforts to combat drug trafficking and gang activity in Contra Costa County. The cases that the Task Forces have investigated demonstrate that drug trafficking af Quarterly financial and programmatic reporting is due within 15 calendar days after the end of each CalEMA quarter. The Job Data Collection sheet is due each month. Employment and Human Services 35,826,441$ 34,684,206$ See second Worksheet tab for details. Health Services -$ $ - Directly related to the provision of existing health care and mental health services. This amount is related to the increase in the Federal Medical Assistance Percentage for Medi- Cal services and an increase in the hospital disproportionate funding cap. -$ -$ Electronic Health Record funding from Medicare and Medi-Cal. Purchase and install software, computer equipment, etc. necessary to implement an Electronic Health Record (EHR) throughout the Health Department. Medicare and Medicaid (Medi-Cal in California) 12,000,000$ 11,002,092$ To relocate and rebuild Richmond Health Center. CCHS has chosen a new location for the West County Health Center in San Pablo's Redevelopment Zone, 200 yards from the old DMC site. This project is currently under construction and is expected to be completed in September 2012. Administered through HRSA 61.75 FTE's (Construction related staff) as of 12/31/11. Reported to HRSA 1/12/12. CCHS is replacing and expanding the Richmond Health Center (RHC) at a new location, 13613 San Pablo Ave, San Pablo, approximately 2 miles from the current site. Since 1967, the RHC has provided over one million physician visits to low-income West Contra Costa residents. The existing facility is in poor condition, overcrowded, and seismically unsafe. Construction of the new health center will preserve and expand services to low income, uninsured and underinsured patients. Quarterly reporting to Grants.gov and Federalreporting.gov. 683,020$ 203,460$ Capital Improvement Program for Health Care for Homeless program. The CIP funds will allow CCHS to demolish the Martinez Family Practice site and replace it with a new modular unit with the same square footage in the same location. The bidding process to start construction is currently under way and the groundbreaking is expected to be in April 2012. Administered through HRSA 0.00 FTE as of 12/31/11. Reported to HRSA 1/12/12. Measurable FTE count not expected until construction begins in April 2012. The existing building is in need of replacement due to asbestos in the walls and a nonoperating HVAC system. The asbestos remediation costs exceed the value of the building, making repair/renovation unfeasible. Since Fall 2008, this building has become almost uninhabitable, impeding clinical services significantly with compacted services at other service sites. Quarterly reporting to Grants.gov and Federalreporting.gov. 135,000$ 135,000$ Collaborative partnership with WIC and school-based services to ensure that young children and pre-teens receive needed immunizations CDC Immunization Assistance 2.0 FTE ARRA funding allows these two projects that would have otherwise ended resulting in elimination of staff positions. By ensuring young children and preteens are immunized, the health of the whole community is protected and enhanced. Quarterly reporting to California Department of Public Health Immunization. ARRA spent and money received in FY 09-10. $ 1,179,420 1,179,420$ Substance Abuse Services AODS 4 positions will be able to be kept through FY 10-11 Treatment services will be provided to approximately 1,300 non-violent drug offenders. Monthly Job Data Collection Sheets American Recovery and Reinvestment Act of 2009 Contra Costa County Participation Department Amount Awarded Amount Received to Date Use of Funds Program Jobs Impact Economic Impact Social Impact Reporting Requirements 224,841$ 224,841$ Increased Demand for Services grant for the Health Care for Homeless program. The purpose of the Increased Demand for Services award through the ARRA is to address the increased needs of homeless patients. With these funds, CCHS added a 0.5 FTE physician to increase capacity. Administered through HRSA 0.50 Physician added ARRA funding provides one half time physician salary and benefits. We have utilized the funds from the Increased Demand for Services award through the ARRA to address the increased needs of homeless patients by adding a 0.5 FTE physician to our staffing. As the only public safety-net hospital and clinic system in Contra Costa County, we are the main provider of care to homeless patients. To address the needs of the homeless population, CCHS has operated the Health Care for the Homeless (HCH) Project since 1990, bringing mobile clinical services to homeless individuals and providing homeless patients with access to services from the entire CCHS health care delivery system. These funds have added additional capacity to our health care delivery system, thereby enabling our health care delivery system to provide care to additional homeless patients. Quarterly reporting to Grants.gov and Federalreporting.gov. Probation 200,000$ 200,000$ The grant supports a full-time Deputy Probation Officer who will provide specialized supervision of adult felony drug offenders and serve as Court Officer to the Felony alternative Drug Sentencing Program. Drug Court Discretionary Grant Program 1 Deputy Probation Officer position will be able to be kept through FY10-11 ARRA funding provides funding for 1 position that would have otherwise been eliminated.Increased community safety Quarterly Financial Status Reports 161,078$ 161,078$ Fund one Deputy Probation Officer to supervise small caseloads, focusing strictly on sexual assault offenders. Sexual Assault Grant Probation Specialized Unit Recovery 1 Deputy Probation Officer position will be able to be kept through FY10-11 ARRA funding provides funding for 1 position that would have otherwise been eliminated.Increased community safety Quarterly Report of Expenditures and Request for funds 1,189,293$ 1,187,440$ Staff a unit of Probation Officers to provide evidence-based intensive probation supervision to adult felony probationers and thereby reduce the likelihood they will commit new crimes or other violations and be sent to prison. Evidence Based Probation Supervision Recovery Act Prog 6 Deputy Probation Officers, 2 Clerks and 1 Probation Supervisor positions will be able to be kept through FY10-11 ARRA funding provides funding for 9 positions that would have otherwise been eliminated.Increased community safety Quarterly Report of Expenditures and Request for funds Public Works 11,279,083$ 10,224,792$ Vasco Road Safety Improvements Project Local Streets and Roads (LS&R) System Preservation (Surface Transportation Program (STP)) ARRA provides funding that would otherwise not be available to construct this improvement. The development and construction of this project will allow the employment of local administrative staff, engineers, technicians, inspectors, construction contractors, carpenters, material providers, equipment providers, equipment operators, etc. as expected of a typical capital improvement project. These jobs would not otherwise have benefited if not for this additional funding. ARRA funding provides the creation or security of jobs that would otherwise not have been available. The influx of funding has a positive impact on the economy through the employment of workers. This project will provide improvements to address safety concerns due to cross median collisions. The connection of a southbound passing lane aims to reduce the number of merges that drivers need to consider. The motoring public will benefit from these improvements on this heavily traveled commute corridor. The project hopes to reduce travel delays caused by accidents, allowing reduced travel times for the daily commuter. Less time on the road can translate to a positive social impact as well as a positive environmental impact, such as the reduction of greenhouse emissions. Federally funded projects are processed through the State Department of Transportation (Caltrans) Local Assistance Office. The County is very familiar with the Caltrans process, as the County receives federal funds on a regular basis. The Caltrans Office of Local Assistance has very specific processing and reporting requirements as detailed in the Local Assistance Procedures Manual. Reporting requirements for ARRA will be more involved than the typical federally funded project. ARRA has a stated goal of improving transparency and accountability at all levels of government. Therefore, in addition to the normal reporting requirements, ARRA funding will require the local agency to play a role alongside the state and the Federal Highway Administration to report the completion status of projects, estimate the jobs created and the jobs retained. Other reports provided by the state and FHWA include the dollars, appropriated, allocated, obligated and outlayed, the number of projects out to bid, awarded, work that has begun and completed, the number of direct and indirect jobs, aggregate expenditure of state funds, project description, estimated total cost, amount of covered funds used, etc. 1,945,770$ 1,945,770$ Vasco Road Overlay Local Streets and Roads (LS&R) System Preservation (Surface Transportation Program (STP)) ARRA provides funding that would otherwise not be available to construct this improvement. The development and construction of this project will allow the employment of local administrative staff, engineers, technicians, inspectors, construction contractors, carpenters, material providers, equipment providers, equipment operators, etc. as expected of a typical capital improvement project. These jobs would not otherwise have benefited if not for this additional funding. ARRA funding provides the creation or security of jobs that would otherwise not have been available. The influx of funding has a positive impact on the economy through the employment of workers. This project will provide rehabilitation of the road surface to extend the life of the pavement and provide a smoother riding surface for the motoring public. The motoring public will benefit from these improvements on this heavily traveled commute corridor. Federally funded projects are processed through the State Department of Transportation (Caltrans) Local Assistance Office. The County is very familiar with the Caltrans process, as the County receives federal funds on a regular basis. The Caltrans Office of Local Assistance has very specific processing and reporting requirements as detailed in the Local Assistance Procedures Manual. Reporting requirements for ARRA will be more involved than the typical federally funded project. In addition to the normal reporting requirements, ARRA funding will require the local agency to play a role alongside the state and the Federal Highway Administration to report the completion status of projects, estimate the jobs created and the jobs retained. Other reports provided by the state and FHWA include the dollars, appropriated, allocated, obligated and outlayed, the number of projects out to bid, awarded, work that has begun and completed, the number of direct and indirect jobs, aggregate expenditure of state funds, project description, estimated total cost, amount of covered funds used, etc. Sheriff's Office $ - $ - To fund 20 Deputy Sheriff positions. NOT AWARDED.COPS (Community Oriented Policing Services) 66,767$ 66,767$ Multi-jurisdictional methamphetamine enforcement team grant that pays for overtime costs associated with deputy sheriffs' investigation of drug activity and arrests. This is just the Sheriff's Office share of the grant. CalEMA - funded through Recovery Act - Edward Byrne Memorial Justice Assistance Grant Program (JAG) Offsets some overtime costs for narcotic enforcement. ARRA provides funding for enforcement activities on an overtime basis, that would otherwise not have been available. The goal of the grant program is to target methamphetamine manufacturers and traffickers who produce or sell significant quantities of methamphetamine, including precursor trafficking; to disrupt and dismantle their clandestine labs and organizations; to incarcerate those responsible. Monthly Job Data Collection Sheet - reporting number of overtime hours. Quarterly Financial Status Reports. Quarterly Bureau of Justice Assistance (BJA) Performance Reports. 299,535$ 68,800$ Grantees may utilize Recovery JAG funds for state and local initiatives, technical assistance, training, personnel, equipment, supplies, contractual support, and information systems for criminal justice, as well as research and evaluation activities. To be split with the District Attorney. Edward Byrne Memorial Justice Assistance Grant (JAG) Program Partial funding of 1 deputy sheriff for 1 year, and partial funding of 1 deputy DA for 2 years. ARRA funding provides the creation or security of jobs that would otherwise not have been available. The grant will fund both sworn law enforcement and criminal justice personnel positions allowing for job retention and creation.These efforts will enhance and improve current law enforcement operations. Quarterly: Federal Reporting.Gov; Bureau of Justice Assistance (BJA) Performance Reports; Finanancial Status Reports. 71,619,627$ 65,963,189$ Employment & Human Services Department Estimated Funding Increase from The American Recovery and Reinvestment Act of 2009 Expected Amount Amount Rec'd to Date Program Name How Allocated Job Impact Economic Impact Social Impact Reporting Requirements Proposed Use of Funds Aging & Adult Services Bureau Nutrition Program 268,922$ 268,922$ ARRA Home Delivered Meals and Congregate Meals Grant Award Create three part-time limited term outreach workers Backfill General Fund reduction and serve additional meals Creating culturally appropriate outreach materials Monthly Claims For meals, equipment, and outreach to increase client participation IHSS 5,812,573$ 5,812,573$ ARRA In Home Supportive Services (IHSS) Formula through the State claim none Disabled and elderly in the community will be able to remain in their home at a lower cost than a facility Disabled and elderly in the community will be able to remain in their home instead of going into a facility for care Quarterly Claiming to the State. Additional revenues due to increased FMAP effective October 1, 2008 through December 31, 2010, to offset County GF reduction. 6,081,495$ 6,081,495$ Children & Family Services Bureau Adoptions Assistance 1,391,255$ 1,391,255$ Federal Adoptions Assistance Formula allocation calculated by State DCSS none Reduces CGF share by $201,334. ($604,015 ARRA revenue replaces reduction in State share.) Provides continuity for adoptive services and placements. Monthly claim submitted by 20th day. Additional revenues due to increased FMAP effective October 1, 2008 through December 31, 2010, to offset County GF reduction. Foster Care 1,260,928$ 1,260,928$ Federal Foster Care Assistance Title IVE Formula allocation calculated by State DCSS none Reduces CGF share by $408,754. ($272,662 ARRA revenue replaces reduction in State share.) Provides continuity for 24-hour non-medical care to Foster children. Monthly claim submitted by 20th day. Additional revenues due to increased FMAP effective October 1, 2008 through December 31, 2010, to offset County GF reduction. Targeted Case Management 313,166$ 313,166$ Medicaid Title XIX Targeted Case Management Existing Federal program with 11.59% FMAP increase. none Reduces CGF share to zero or near zero, depending on year, TCM rate, other funding. Provides home-based case management to at risk families for their 1st baby born at local hospitals. Quarterly billing submitted to Medi-Cal. Additional revenues due to increased FMAP effective October 1, 2008 through December 31, 2010, to offset County GF reduction. 2,965,349$ 2,965,349$ Community Services Bureau Head Start/Early Head Start 1,132,758$ 1,131,779$ ARRA COLA & QI Grant Award Provide employment to instructors, Comprehensive Services Manager, consultant, and Mental Health Clinical Intern. Provides staff training and development, facility upgrades, hire training consultants. Better trained staff results in children better prepared for school. Quarterly Facility upgrades, additional staff, expand collaboration with CBOs. Costs reimbursable after July 1 Early Head Start Expansion 2,733,739$ 2,733,739$ EHS ARRA Expansion Grant Award Provide employment to Comprehensive Services Manager, Assistant Managers, Home Educators, and clerical staff. Provides staff training and development, facility upgrades, hire training consultants. Provides 170 infant/toddler slots and family- centered services that promote the development of very young children, assist pregnant women to access prenatal and post partum care, and provide resources to address the needs of low- income pregnant women. Quarterly Facility upgrades, additional staff, expand collaboration with CBOs. Costs reimbursable after July 1 Early Learning Mentor Coaches 225,000$ 145,687$ ARRA Early Learning mentor Coaches Grant Award Four (4) mentor coaches and twelve (12) protegees. Provide individualized coaching and mentoring to twelve (12) future mentors. Focus of training is on CLASS and DECA. Mentees receive individualized training on positive climate in the classroom and in providing positive social and emotional environment. Quarterly One (1) mentor coach for three (3) protegges. Employment & Human Services Department Estimated Funding Increase from The American Recovery and Reinvestment Act of 2009 Expected Amount Amount Rec'd to Date Program Name How Allocated Job Impact Economic Impact Social Impact Reporting Requirements Proposed Use of Funds Child Development 83,000$ 83,000$ ARRA Child Care and Development Block Grant, Quality Repair and Renovation Contract Allocation based on current funding level Create/retain 1 job This focuses on the improvement and retention of qualified childcare staff in childcare programs Better trained staff results in children better prepared for school. Annual & Monthly reports Facility upgrades. Work requests for 13 childcare facilities are being processed by GSD. Costs reimbursable after July 1 Community Services Block Grant 1,135,085$ 1,135,085$ CSBG ARRA Formula allocation calculated by State CSD Create 186 new jobs Funds approx. $1 M to CBO's in employment- related services Expand collaboration with various CBO's that serve low-income residents Annual & Bi-monthly reports Sub-contract employment-related services to various CBO's. Costs reimbursable after July 1 Department of Energy 5,054,300$ 3,992,357$ ARRA DOE Weatherization Assistance Program Formula allocation calculated by State CSD Create 21 new jobs Weatherize approx. 1,447 dwelling units of low income residents Converts low-income dwelling units into energy- efficient units. Annual & Monthly reports Additional staff, expand collaboration with Building Inspection to increase weatherization assistance to eligible county residents. Costs reimbursable after July 1 10,363,882$ 9,221,647$ Workforce Development Board Adult 1,095,358$ 1,095,358$ ARRA Adult Formula Formula Allocation Provide employment and training services in order to ready low income and targeted populations with skills to compete in any job. Assist 50% more low income CC County residents through One-Stop Career Centers and other existing workforce partners. Low income individuals will be engaged in meaningful job-related activities and become more equipped with skills for self sufficiency Monthly Training and career guidance services for individuals who have not had regular and/or recent attachment to the workforce; eligible individuals often have entry-level job skills Youth 2,511,927$ 2,511,927$ ARRA Youth Formula Formula Allocation Over 80% of funds were used to employ 1,000 youth during summer 2009; more than 570 youth placed in jobs in 2010 thanks to leveraged funds with CSBG and TANF. Approximately $1 million was paid out into youth wages in summer 2009, much of which went into the local economy. Youth will be work ready and equate learning with earning as they either continue education and training or seek future employment. Also, there is a documented link between youth employment and lower crime rates. Monthly Subsidized employment for low- income youth from high-risk environments; work-readiness/work- maturity and staff-assisted support with employment and related issues Dislocated Worker 2,719,629$ 2,719,629$ ARRA Dislocated Worker Formula Formula Allocation Provide employment and training services to those who have lost their jobs. Expedite rehiring by building on existing skills and aligning training with industries most likely to hire & remain viable. Assist twice as many CC County residents through One-Stop Career Centers and other existing workforce partners. Some participants may seek to start their own small business enterprise. Participants will be engaged in meaningful employment activities in order to retool existing skills sets for future marketplace. One-Stop Career Centers give struggling residents a place to go to find employment assistance. Monthly Training and career guidance services for individuals who have been displaced from previous employment and are in career transition Rapid Response 410,052$ 410,052$ ARRA Rapid Response Formula Formula Allocation Address both job seekers who continue to be displaced; assist struggling businesses to ensure retention of jobs in region. Varies by level of activity (layoffs) and requests for assistance Informs individuals soon-to-be displaced from employment of available public resources, including Unemployment Insurance (UI), One- Stop Career Center services, and other resources Monthly Front-line response to businesses and their impacted (laid-off) workforce; expecting substantial outlay of resources to address N UMMI layoffs; State of California Employment Development Department (EDD) is a primary partner Employment & Human Services Department Estimated Funding Increase from The American Recovery and Reinvestment Act of 2009 Expected Amount Amount Rec'd to Date Program Name How Allocated Job Impact Economic Impact Social Impact Reporting Requirements Proposed Use of Funds SSA Title V 202,264$ 202,264$ ARRA Title V Contract Add 19 new training slots with potential for more job placements Individuals have more funding to put into the economy Older individuals stay healthier when engaged in work environment and may draw down fewer public services Monthly Employment & training activities for low-income individuals from age 55 and above; subsidized work experience in public and nonprofit organizations is a primary activity Adult 15% RICO 200,000$ 200,000$ ARRA Adult RICO Formula Allocation Provide employment and training services in order to ready low income and targeted populations with skills to compete in any job. Assist 50% more low income CC County residents through One-Stop Career Centers and other existing workforce partners. Low income individuals will be engaged in meaningful job-related activities and become more equipped with skills for self sufficiency Monthly Training and career guidance services for individuals who have not had regular and/or recent attachment to the workforce; eligible individuals often have entry-level job skills Rapid Response Add'l Assist 551,716$ 551,716$ ARRA Rapid Response Formula Formula Allocation Address both job seekers who continue to be displaced; assist struggling businesses to ensure retention of jobs in region. Varies by level of activity (layoffs) and requests for assistance Informs individuals soon-to-be displaced from employment of available public resources, including Unemployment Insurance (UI), One- Stop Career Center services, and other resources Monthly Front-line response to businesses and their impacted (laid-off) workforce; expecting substantial outlay of resources to address N UMMI layoffs; State of California Employment Development Department (EDD) is a primary partner 7,690,946$ 7,690,946$ Workforce Services Bureau Temporary Assistance for Needy Families (TANF) Emergency Contingency Fund (ECF) - Subsidized Employment & Training (SET) 6,655,903$ 6,655,903$ TANF Emergency Contingency Fund (ECF) Subsidized Employment (SE) 80% of spending in subsidized employment Provide employment and training services to provide low income and targeted populations with skills to be competitive in the job market Assist approximately 1,000 low-income residents by placing them at worksites throughout Contra Costa County Low income individuals will be engaged in meaningful job-related activities and become more equipped with skills for self sufficiency Quarterly Training, career guidance, and work placement services for individuals who have not had regular and/or recent attachment to the workforce; eligible individuals often only have entry-level job skills Temporary Assistance for Needy Families (TANF) Emergency Contingency Fund (ECF) - Non- Recurrent Short Term Benefits 2,068,866$ 2,068,866$ TANF Emergency Contingency Fund (ECF) Non- Recurring Short Term Benefits (NRSTB) 80% of increased spending in basic assistance for existing activities and 80% of expenditures on new activities Provide services to meet non-recurrent short-term needs of low-income individuals in Contra Costa County Assist approximately 14,000 low-income clients by providing non-recurrent short- term services in partnership with local agencies Non-recurrent short-term needs are met through a variety of service providers strengthening community partnerships Quarterly Non-recurrent short-term needs that deal with a specific crisis situation or episode of need not to exceed beyond four months 8,724,769$ 8,724,769$ Grand Total 35,826,441$ 34,684,206$