Loading...
HomeMy WebLinkAboutMINUTES - 01172012 - C.02RECOMMENDATION(S): APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and Water Conservation District (FC District), or designee, to execute a contract with LSA Associates, Inc., in an amount not to exceed $467,000 to provide vegetation, rangeland, water quality monitoring, data analysis, and report writing services in support of the Streambank Vegetation Management Study, effective January 1, 2012 through December 31, 2014, Concord area. (100% Flood Control District Zone 3B Funds) FISCAL IMPACT: This study is funded 100% by Zone 3B (greater Walnut Creek watershed) funds. BACKGROUND: This study consists of comparing the standard herbicide application method used by the FC District to manage vegetation growth adjacent to Flood Control maintained channels with grazing by sheep or goats to manage the vegetation growing adjacent to the stream lowflow channel and below the top of the bank of the channel. Implementation of all three vegetation management APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 01/17/2012 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Cece Sellgren (925) 313-2296 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: January 17, 2012 David Twa, County Administrator and Clerk of the Board of Supervisors By: STACEY M. BOYD, Deputy cc: R. M. Avalon, Deputy Chief Engineer, M. Carlson, Flood Control, C. Sellgren, Flood Control, C. Windham, Flood Control C. 2 To:Contra Costa County Flood Control District Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:January 17, 2012 Contra Costa County Subject:Streambank Vegetation Study Contract with LSA Associates, Inc., Concord area. (100% Flood Control District Zone 3B Funds) Project No. 7520-6D8333 BACKGROUND: (CONT'D) techniques will be administered in small plots (approximately ½ acre) using a randomized block design. A total of 18 treatment plots over two reaches of Walnut Creek will be treated. Measurements of vegetation response (species, height, and biomass), water quality (a variety of parameters), and soil substrate will be taken before, during, and/or after the vegetation treatment. The study will be used to help the FC District make a business decision regarding when and where to use each of these vegetation management techniques in the future. The Iron Horse Trail will be temporarily closed during herbicide application (approximately a half day) to allow application vehicles to use the trail. The trail will be open during the sheep and goat grazing (approximately two weeks for each of the three study reaches). A permanent fence already is installed at the top of bank to keep the grazing animals confined to the streambank and dogs on the trail from harassing the grazing animals. CONSEQUENCE OF NEGATIVE ACTION: Failure to approve the contract will delay the implementation of the study. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS LSA Contract LSA backup documents