HomeMy WebLinkAboutMINUTES - 02282012 - C.05RECOMMENDATION(S): APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and Water Conservation District (FC District), or designee, to execute the Agreement to Perform Tariff Schedule Related Work with Pacific Gas & Electric Company (PG&E) to reimburse PG&E $35,000 for the undergrounding of an existing overhead electrical facility on the Upper Sand Creek Basin, including indemnification of PG&E, Antioch area. FISCAL IMPACT: The estimated cost to relocate the PG&E line is $35,000. All costs associated with this work have been previously budgeted and will be paid by Drainage Area 130. BACKGROUND: The FC District is planning to construct Upper Sand Creek Basin in the Antioch area. PG&E’s existing overhead transmission line runs through the proposed basin footprint. In order to construct the basin, the PG&E transmission line will need to be relocated and placed underground on the FC District’s right of way. As PG&E has prior easement rights on the property, the FC District must reimburse PG&E for the relocation costs. Electrical conduit will be installed by the FC District’s contractor. PG&E will prepare the plans for APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 02/28/2012 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor ABSENT:Gayle B. Uilkema, District II Supervisor Contact: Carl Roner (925) 313-2213 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: February 28, 2012 David Twa, County Administrator and Clerk of the Board of Supervisors By: STACEY M. BOYD, Deputy cc: P. Detjens, Flood Control, C. Roner, Flood Control, C. Windham, Flood Control C. 5 To:Contra Costa County Flood Control District Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:February 28, 2012 Contra Costa County Subject:Agreement to Perform Tariff Schedule Related Work with Pacific Gas & Electric Company. (100% Drainage Area 130 Funds) Project No. 7562-6D8518 this work and install the electrical conductor. CONSEQUENCE OF NEGATIVE ACTION: If the agreement is not approved, the implementation of the project may be substantially delayed, as the basin cannot be constructed as currently planned without relocating the PG&E transmission line. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS Agreement with PG&E