HomeMy WebLinkAboutMINUTES - 02282012 - C.05RECOMMENDATION(S):
APPROVE and AUTHORIZE the Chief Engineer, Contra Costa County Flood Control and
Water Conservation District (FC District), or designee, to execute the Agreement to Perform
Tariff Schedule Related Work with Pacific Gas & Electric Company (PG&E) to reimburse
PG&E $35,000 for the undergrounding of an existing overhead electrical facility on the
Upper Sand Creek Basin, including indemnification of PG&E, Antioch area.
FISCAL IMPACT:
The estimated cost to relocate the PG&E line is $35,000. All costs associated with this work
have been previously budgeted and will be paid by Drainage Area 130.
BACKGROUND:
The FC District is planning to construct Upper Sand Creek Basin in the Antioch area.
PG&E’s existing overhead transmission line runs through the proposed basin footprint. In
order to construct the basin, the PG&E transmission line will need to be relocated and
placed underground on the FC District’s right of way. As PG&E has prior easement rights
on the property, the FC District must reimburse PG&E for the relocation costs. Electrical
conduit will be installed by the FC District’s contractor. PG&E will prepare the plans for
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 02/28/2012 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
ABSENT:Gayle B. Uilkema, District II
Supervisor
Contact: Carl Roner (925)
313-2213
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: February 28, 2012
David Twa, County Administrator and Clerk of the Board of Supervisors
By: STACEY M. BOYD, Deputy
cc: P. Detjens, Flood Control, C. Roner, Flood Control, C. Windham, Flood Control
C. 5
To:Contra Costa County Flood Control District Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:February 28, 2012
Contra
Costa
County
Subject:Agreement to Perform Tariff Schedule Related Work with Pacific Gas & Electric Company. (100% Drainage
Area 130 Funds) Project No. 7562-6D8518
this work and install the electrical conductor.
CONSEQUENCE OF NEGATIVE ACTION:
If the agreement is not approved, the implementation of the project may be substantially
delayed, as the basin cannot be constructed as currently planned without relocating the
PG&E transmission line.
CHILDREN'S IMPACT STATEMENT:
Not applicable.
ATTACHMENTS
Agreement with PG&E