Loading...
HomeMy WebLinkAboutMINUTES - 09132011 - C.88RECOMMENDATION(S): APPROVE and AUTHORIZE the General Services Deputy Director, or designee, to execute a contract amendment with Interface Engineering, Inc. to increase the payment limit by $50,000 to a new payment limit of $150,000 for as-needed engineering design services for various energy efficiency projects, and extend the contract period through January 31, 2013. FISCAL IMPACT: 100% General Funds reserved for capital expense. The annual utility savings at project completion is estimated to be $29,000 to the General Fund. BACKGROUND: Interface Engineering, Inc. ("Interface") is currently under contract to provide as-needed engineering design services for various energy efficiency projects. Interface and three other firms were selected through an RFQ process conducted by the County for energy retrofit projects. Interface was assigned two projects at the Martinez Detention Facility ("MDF"), 1000 Ward Street, Martinez to convert exhaust and supply fans to variable frequency drive APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 09/13/2011 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Rob Lim, (925) 313-7200 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: September 13, 2011 David Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: GSD Administration, GSD Accounting, GSD CPM Division Manager, GSD CPM Project Manager, GSD CPM Clerical, Auditor's Office, County Counsel's Office, County Administrator's Office, County Administrator's Office C. 88 To:Board of Supervisors From:Steve Silveira, Deputy General Services Director Date:September 13, 2011 Contra Costa County Subject:Amendment No. 1 to the As-Needed Engineering Design Services Agreement with Interface Engineering, Inc. BACKGROUND: (CONT'D) with fan tracking controls, and replace condensing units and tie them into the existing water system. With these two projects, the originally approved contract limit of $50,000 has been reached. The proposed project is to replace (2) 225-ton water-cooled chillers with (2) 225-ton, air cooled, centrifugal, multi-compressor, variable speed, high efficiency chillers. The estimated annual utility savings from the new chillers is $29,000. The chillers at the MDF are 30 years old. The typical useful life of the chillers is 15-20 years but because of regular maintenance, they have lasted 30 years. Recently, one of the chillers broke down and will be out of service for a few weeks. The old chillers use R-11 refrigerant which was phased out by the Environmental Protection Agency. In addition, R-11 refrigerant is expensive, hard to find, and soon may no longer be available. Interface is familiar with the MDF and it is recommended that their contract amount be increased by $100,000 to cover the additional services related to the MDF Chiller Replacement Project. Any unused balance can be utilized for other projects or remain unused. CONSEQUENCE OF NEGATIVE ACTION: Approving Amendment No. 1 will allow Interface to provide the additional services needed for the MDF Chiller Replacement Project. If the amendment is not approved, and should problems continue with the existing primary chiller and the backup chiller, it could potentially result in complete failure which will be very disruptive and more costly to fix in order to meet the cooling needs of the facility. CHILDREN'S IMPACT STATEMENT: Not applicable.