HomeMy WebLinkAboutMINUTES - 08162011 - C.69RECOMMENDATION(S):
1. APPROVE and AUTHORIZE the FY 2011/12 Conoco/Phillips Ultra Low Sulfur Diesel
Fuel Project Return-to-Source Fund allocation plan in the amount of $111,000 for specific
projects and administration, as recommended by Supervisor Uilkema.
2. AUTHORIZE the Conservation and Development Director, or designee, to execute the
appropriate agreements with the agencies approved for funding.
FISCAL IMPACT:
Funds for this project come from a portion of the County’s property tax revenue, set aside
for this specific purpose.
BACKGROUND:
On October 17, 1995, the Board of Supervisors (Board) approved a Board Order allocating
property tax revenues resulting from the Unocal Reformulated Gasoline Projects as a
Return-to-Source Fund for the communities of Rodeo, Tormey, and Crockett for the
purpose of funding projects that would positively impact the economic development in the
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 08/16/2011 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I Supervisor
Gayle B. Uilkema, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Stephen Dexter,
925-335-1046
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: August 16, 2011
David Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc:
C.69
To:Board of Supervisors
From:Gayle B. Uilkema, District II Supervisor
Date:August 16, 2011
Contra
Costa
County
Subject:Return-to-Source Fund Allocation
target communities.
On February 15, 2005, the Board approved a Board Order replacing the source of funding
from the Return-to-Source fund from the diminishing proceeds of the Reformulated Gas
Project which was being phased out as a result of the MTBE discontinuance with a portion
of the property tax increment revenue resulting from the construction of the Conoco/Phillips
Ultra Low Sulfur Diesel Fuel Project. This funding was designated for economic
development and policing needs in the impacted West County unincorporated communities
of Rodeo, Tormey, Crockett, and Port Costa.
On March 23, 2010, the Board approved the allocation of the Return-to-Source funds that
had accumulated through FY 2009/2010 for programs/projects in the target communities.
The Return-to-Source Fund, which includes the amounts from FY 2010/2011 and
2011/2012, now totals $111,000. Applications have been accepted for programs/projects
that promote economic development including addressing youth career development issues,
or to improve public facilities in the target areas of Rodeo, Crockett, and Port Costa. The
maximum grant is $35,000 per year. The Department of Conservation and Development –
Community Development Block Grant (CDBG) program staff will be designated as the
administrator of the allocation process with assistance provided by District II staff.
It is recommended that a total of $105,000 in Return-to-Source funds be allocated in the
following way:
BACKGROUND: (CONT'D)
Port Costa Conservation Society (Attachment A) - $35,000
Project funds will be used for structural (seismic) upgrade of the foundation and
unreinforced masonry interior wall of the Port Costa School building.
Crockett Community Services District (Attachment B) - $35,000
Project funds will be used to create a modern, energy efficient kitchen at the Community
Center and a barbecue area at the swimming pool.
Lefty Gomez Community Center (Attachment C) - $35,000
Project funds will be used to refurbish the Lefty Gomez Community Center’s floor;
refurbish, replenish and repair of the play structure; refurbish the bungalow; and install a
larger Lefty Gomez Community Center sign.
CONSEQUENCE OF NEGATIVE ACTION:
There won't be authorization to distribute the Conoco/Phillips Ultra Low Sulfur Diesel
Fuel Project Return-to-Source Funds.
CHILDREN'S IMPACT STATEMENT:
None.
ATTACHMENTS
Attachment A - Port Costa Conservation Society Grant Application
Attachment B - Crockett Community Services District Grant Application
Attachment C - Lefty Gomez Community Center Grant Application
PORT COSTA CONSERVATION SOCIETY
P. O. BOX 36, PORT COSTA, CA 94569
Port Costa School 1911—2011
August 8, 2011
Honorable Gayle B. Uilkema, Supervisor
Contra Costa County District 2
651 Pine Street, Room 108A
Martinez, CA 94553
RE: GRANT OPPORTUNITY FOR PORT COSTA SCHOOL
Dear Supervisor Uilkema:
Per your request, following please find our request for a grant in the amount of $35,000
for structural retrofitting of the historic Port Costa School building.
The restoration of the 100-year-old building is very important to the community and the
surrounding area on many levels. It is the only public building in this isolated town. It is
an important example of local history and is on the National Register of Historic Places.
As restoration continues it is increasingly being used by many diverse community
organizations. We feel it is important to restore this building for its historic, educational
and social value.
The Port Costa Conservation Society is an all-volunteer non-profit organization. All
proceeds from our fund-raisers go directly toward maintenance and restoration of the
building. Frequent volunteer days are organized to maintain the building and grounds.
We have repeatedly demonstrated our ongoing commitment to serve the community
and to meet our goals and objectives. We have an excellent track record of requested
and completed grant projects. Eventually we hope to see the building used in a wide
range of activities that will be self-supporting.
We certify that the information contained in this proposal is to the best of our knowledge
true and accurate and that the proposal is submitted with the Board of Directors’ full
knowledge and endorsement. Thank you for considering our request.
Respectfully submitted,
Ridge Greene, Chairman Diane Stewart, Treasurer
BOARD OF DIRECTORS
Ridge Greene, Chairman
Sharon Loveseth, Secretary
Diane Stewart, Treasurer
Anne Mann, Financial Secretary
Veronica Crane, Vice Chair
GRANT REQUEST
August 8, 2011
APPLICANT: Port Costa Conservation Society
P. O. Box 36
Port Costa, CA 94569-0036
(510) 787-2254
LWStewart@comcast.net
PROJECT: Structural retrofitting of the Port Costa School building
Scope of Work: Voluntary structural (seismic) upgrade of the foundation and
unreinforced masonry wall at the interior front of the building using concrete and
shotcrete applied to portions of the existing interior walls.
AMOUNT REQUESTED: $35,000.00
PROJECT COST: BUDGET
Estimated Permit Fees $ 2,000.00
Demolition and excavation where required 4,200.00
Shoring 3,500.00
Pour foundation footings 6,400.00
Install new sewer line to kitchen under slab 2,200.00
Pour new concrete slab floors 14,688.00
Shotcrete front interior walls 12,000.00
TOTAL PROJECT COST $44,988.00
We are requesting 78% of the total project cost. The Port Costa Conservation
Society would provide the additional 22% required for completion of the project.
TIMELINE: Estimated start date October, 2011 with completion by May, 2012
The engineered plans for this project have been submitted to the Contra Costa
County Building Department. They have been approved by Zoning and Flood
Control and are currently in Plan Check. Plan Check fees have already been
paid. We would like to set an October bid date, subject to the approved plans
being received from the Building Department and issuance of the permit. Permit
fees would be due and payable upon receipt of same.
Subject to coordination of the above, bids could be received as early as the end
of October. Based on this, we would hope to accomplish completion of this
project by the end of Spring, 2012.
Respectfully submitted,
Ridge Greene, Chairman Diane Stewart, Treasurer
Agency Type (check one): Non Profit Public Agency x For Profit
Tax ID # 68-0114159
ORGANIZATION NAME: Crockett Community Services District, Crockett Recreation Dept
PROJECT NAME: COMMUNITY CENTER KITCHEN RENOVATION
ADDRESS: 850 Pomona Street
CITY, STATE ZIP: Crockett, CA 94525
CONTACT PERSON: Ron Wilson
TITLE: Recreation Department Manager
TELPHONE NUMBER: 510 -787-2414
FAX NUMBER: 510-787-3049
EMAIL ADDRESS: RWilson650@aol.com
WEB SITE:
AMOUNT REQUESTED: $35,000.00
TOTAL PROJECT COST: $38,000.00
The Crockett Recreation Department of the Crockett Community Services District respectfully submits this grant
request for improvements to the Crockett Community Center and the Crockett Swim Center. The project will improve
the facility, and provide additional and continued recreation opportunities for youth and families, and provide much-
needed renovation and expansion of the Alexander Park facilities.
1, Brief history and description of the proposed project
The Crockett Community Center was built in 1919 and opened in January 1920. Contra Costa County returned the
Community Center to the Crockett Community Services District in 2006, following creation of the district. During the
past five years, many of the deferred maintenance items have been corrected. The last major renovation of the Center
was in 1976. The kitchen is a commercial kitchen, inspected annually by the health department, which is a valuable
distinction. It is the only commercial rated kitchen of its kind in Crockett. This project will replace the kitchen stoves
with a new commercial stove, charbroiler, and double ovens. Not only are these new appliances more energy efficient,
they will better serve those that use the Center. We will lower our operating costs and increase revenue by providing
modern cooking equipment. New three compartment stainless steel sinks will be installed, which will meet health
department requirements.
The second element of the project will install a barbecue area at the Crockett swimming pool. The pool was just rebuilt
with new plumbing, new pool deck, and filtration system. It re-opened on July 15, 2011. This project will continue the
remodeling just completed. The new barbecue area will add an exciting new feature to the pool by providing a space
for preparing food and will complete the whole pool renovation project.
This project is designed to maintain or increase the viability of both the Community Center, and swimming pool.
2. Who will benefit
The residents of Crockett and surrounding communities will benefit. The Community Center hosts the Senior
Nutrition Program, provides classes and events for the community. Children’s events are provided free for Halloween,
Christmas and Easter. The Center is also rented for weddings, birthday and anniversary parties. The Center is provided
free for town meetings. Local non-profit groups use the Center for their fundraisers. The John Swett High School
Band Boosters, John Swett High School Athletic Boosters, Rodeo Baseball have used the Center for their fundraisers in
the past. The rental income is critical so that we can continue with the free events. 8,440 people used the Crockett
swimming pool between Memorial Day and Labor Day 2010. The Rodeo and Pinole YMCA’s bring up to 60 children
to the Crockett swimming pool twice per week during the summer. The swimming pool is the largest employer of the
local youth during the summer.
3 Need for Project
Crockett is a small working class town with a per capita annual income just over $27,000, below the county average of
$30,000 (2000 Census Report). According to the unemployment data for June 2011, Crockett had 21.5% and Rodeo
had 15.7% unemployed, well above the 11% average for all of Contra Costa County. The economic recovery has not
reached this area. Although Crockett is located close to the I-80 freeway, the town is somewhat isolated, wedged
between steep hills and the Carquinez Strait. The Alexander Park complex is one of the few focal points for recreation
in the community. The town has no movie theaters or live theater, and the library is only open 22 hours a week. The
Community Center and swimming pool are vital for the quality of life not only in this community but in the
surrounding communities as well. Rental revenue is important for continued operation of both recreational facilities in
Alexander Park.
4. Project time line and funding plan
If successful, funding will come from this return to source grant, and from the Crockett Community Services District.
5. Project outcome
This project will result in a modern, energy efficient kitchen at the Community Center and a barbecue area at the
swimming pool. Operating costs will be lowered because the new equipment uses less energy. We will be able to
continue providing recreational opportunities to Crockett, Port Costa and Rodeo.
6, How will we measure success/progress
A successful completion of the project will include:
Sign-off on facility inspection by all necessary agencies
Installation of the new equipment
Thank you very much for considering our proposal. Please contact me if you have any questions
Sincerely
Ron Wilson
Recreation Department Manager
Sep-11 Oct-11 Nov-11
X
X
X
Project Milestones
Return to Source
Grant
Order equipment
Install equipment $28,000.00
$7,000.00
$3,000.00
$38,000.00
Project Expenses:
Equipment
Equipment Installation
Permits
Total Project Cost
$35,000.00 $3,000.00 $38,000.00
Source of Funds Return to Source
Funds
Crockett Community
Services District Budget Total
1
DISTRICT II
CONOCOPHILLIPS RETURN-TO-SOURCE FUND
FY 2011/12 APPLICATION
Agency Type (check one): Non Profit Public Agency X For Profit
Tax ID # 94-6000509
ORGANIZATION NAME: Contra Costa County Public Works
PROJECT NAME: Rodeo Community Facilities Improvements
ADDRESS: 255 Glacier Drive
CITY, STATE ZIP: Martinez, CA 94553
CONTACT PERSON: Venus Zayas
TITLE: Administrative Analyst
TELPHONE NUMBER: (925) 313-2181
FAX NUMBER: (925) 313-2333
EMAIL ADDRESS: vzaya@pw.cccounty.us
WEB SITE: www.cccpublicworks.org
AMOUNT REQUESTED: $ $35,000
TOTAL PROJECT COST: $ $35,000
PROJECT SUMMARY (40 word max):
Public Works staff and the County Service Area R-10 (CSA R-10) committee have identified four
improvement projects to enhance the Rodeo Community. In order of priority they are:
1. Refurbish the Community Center’s floor $12,000
2. Refurbish, replenish and repair of play structure $10,000
3. Refurbishment of the Bungalow $8,000
4. Install a larger Lefty Gomez Community Center sign $750
2
Please answer the following questions completely. The narrative portion of the application
should not exceed five typed pages, double spaced, with 12 point or larger font and 1 inch
margins.
BACKGROUND & PROJECT DESCRIPTION
1. Provide a history and description of the proposed project.
A small town along the San Francisco Bay east shore, Rodeo is a community with much
to offer its residents and non-residents through its recreation and commerce. There are
ballfields, creek trails, community centers, stores and restaurants. In keeping with the goals
established in the Lefty Gomez Ballfield Complex Master Plan, Rodeo continues to pursue
the common desire to improve the visual character and quality of its community. In 2010
Public Works completed improvements to the Lefty Gomez Community Center exterior and
interior and the Rodeo Welcome Sign area which is located at the intersection of San Pablo
Avenue and Willow Avenue. These improvements included repainting the exterior, interior,
replacing the kitchen appliances, and replacing the fencing at the Center and enhancing the
Rodeo Welcome Sign area with vibrant plantings.
The County Service Area (CSA) R-10 Committee has identified four improvement
projects that will build on these recent improvements in Rodeo. These include:
Refurbish the Lefty Gomez Community Center’s Floor: The flooring at the
Community has not been replaced since the County took over its maintenance in
1995. The existing flooring has asbestos which is known to be a hazardous material.
The Return to Source money would allow the community to continue the refurbishing
of the center in order to complete a safe and functionally professional environment.
Refurbish, replenish and repair of Play Structure: During the last two annual
playground safety inspections, various structures in the playground were identified as
3
needing to be replaced or repaired. Additionally, the fibar (the padding beneath the
play structure) also needs to be replenished so that it is at the required level. Because
of lack of annual funding the County has not had an opportunity to make these
repairs. This structure is heavily used by the elementary school that is located near it.
Refurbish the Bungalow: Additional revenue to the Rodeo community comes from
the rental of a bungalow located next to the Lefty Gomez Community Center.
Currently it is vacant; it needs minor repairs to the interior and exterior. This would
include replacement of missing ceiling tiles, and painting of the interior and exterior
of the bungalow.
Install a larger Lefty Gomez Community Center Sign: Currently there is an 18x24
sign that identifies the building as “Lefty Gomez Community Center”. The
community has expressed concern that the Center would be better identified if the
sign was larger.
2. Identify what areas of District II will be served by the project.
The improvements to the Lefty Gomez Community Center and Ballfield Complex will
directly serve the residents of Rodeo and surrounding areas including Crockett, Hercules,
Pinole and El Sobrante, by providing a safe, visible, and accessible place to gather for
recreational activities. The improvements to the play structure will directly affect children in
the community as it one of a few parks in the area.
3. What is the target population for the proposed project?
1. Refurbish the Lefty Gomez Community Center’s Floor: Improvements to the
Community Center are targeted toward the persons who use the facility including
youth, adults and seniors.
4
2. Refurbish, replenish and repair of Play Structure: The play structure
improvements are targeted toward the persons who use the structure. This includes
children from the ages of 2 years old to 12 years old.
3. Refurbish the Bungalow: Improvements to the bungalow are targeted toward the
persons who use the facility including youth, adults and seniors.
4. Install a larger Lefty Gomez Community Center Sign: Improvements to the
Center sign are targeted toward the persons who use the facility including youth,
adults and seniors.
4. What are the criteria for receipt of services, if any?
Services will be deemed complete when the new floor has been installed, the play
structure has been repaired and cleaned with the required level fibar underneath, the
bungalow has repainted and refurbished including repair of ceiling tiles, and the new Lefty
Gomez Community Center sign installed. County staff will conduct a final walk-through
with contractors and sign off after each project is complete.
PROPOSAL NARRATIVE
5. Clearly describe the need for your proposed project (use research data to quantify the
need, if available).
Each of the projects listed in this application have been specifically requested by the CSA
R-10 Committee, which is made up of local Rodeo residents and appointed by the District II
County Supervisor.
1. Refurbish the Lefty Gomez Community Center’s Floor: The CSA R-10
Committee recommendation that the Lefty Gomez Community Center floor be
replaced is a necessary next step to improving the center and creating a more
5
appealing and thus rentable place for the community to gather. The goal is to
increase usage by providing a clean and more presentable environment. The existing
flooring is old and shows obvious signs of wear and tear. The installation of new
flooring will make the Center more appealing for baby showers, weddings, birthday
parties and community events, all of which bring in much-needed revenue for the
community.
2. Refurbish, replenish and repair of Play Structure: Improvements are
necessary due to the heavy usage by the neighboring elementary school and the
public. Because of lack of funds the County has only been able to do necessar y
minimal repairs. The fibar padding needs to be replenished. After a required
playground safety audit this year, features of the structure were identified as needing
repair. It is essential that this play structure be refurbished, replenished and repaired
as it is the only one of its size for the area.
3. Refurbish the Bungalow: The bungalow is a source of revenue for the Lefty
Gomez Community Center Ballfield site and thus recreational activities in the
community of Rodeo. Currently it is vacant and the County is looking for a new
renter. In order to make this bungalow attractive and more usable, interior and
exterior work needs to be done including replacement of missing ceiling tiles. The
interior and exterior walls need to be repainted.
4. Install a larger Lefty Gomez Community Center Sign: There is an existing small
sign in the front of Lefty Gomez Community Center. The community would like to
have a larger sign so that the Center entrance is more visible and inviting.
6. Describe the proposed outcomes for the project.
6
1. Refurbish the Lefty Gomez Community Center’s Floor: The improvements
will increase usage of the building and surrounding park and playgrounds. The
increased usage will create a greater sense of community and will improve the
financial health of the Center by increasing rentals.
2. Refurbish, replenish and repair of Play Structure: The improvements to the
play structure will improve the community and allow the children to fully utilize
the play structure, encouraging them to enjoy the outdoors and get exercise for
their health and socialization.
3. Refurbish the Bungalow: The improvements will appeal to the community and
will increase usage of the building and surrounding playgrounds. The increased
usage will create a greater sense of community and will improve the financial
health of the Center by having an occupied building on the site.
4. Install a larger Lefty Gomez Community Center Sign: Larger signage will
attract more residents to the center and make them aware of its location. The
increased usage will create a still greater sense of community and will improve
the safety for vehicles entering or exiting the driveway into the site.
7. How will you measure success of the project? How will the results be demonstrated to
the community and/or District II?
By improving the look of the area and attracting more people for business and recreation,
Rodeo businesses benefit, as do the recreation facilities and programs. Increasing CSA R-10
revenues via rentals is a key goal of this project. This will allow for increased parks and
recreational services within the community.
8. What is the specific timeline for achieving the outcomes associated with your project?
7
1. Refurbish the Lefty Gomez Community Center’s Floor: The flooring will be
purchased and installed within two months of receipt of funds.
2. Refurbish, replenish and repair of Play Structure: Weather permitting, project
implementation will be within three months from receipt of funds.
3. Refurbish the Bungalow: Weather permitting, repainting of the exterior and the
interior and replacement of the ceiling tile can be implemented within six months of
receipt of funds.
4. Install a larger Lefty Gomez Community Center Sign: Weather permitting, the
fabrication and installation of a new sign can be implemented within three months of
receipt of funds.
8
PROJECT FUNDING
9. Provide a line item budget for the proposed project (use the attached Project Budget templates. Be
sure to include all sources to implement the project including the ConocoPhillips funds).
See below.
10. If other funding sources will be used to finance the project, submit evidence that these additional
funds have been or will be raised by the time the project is to begin.
Long Term Maintenance: Once the improvements are completed, LL-2 Zone 38 and the CSA R-10 funds
will be used to sustain the long-term maintenance of the improvements. This project is not expected to
increase costs to CSA R-10 or LL-2 Zone 38.
CHART B – Use for infrastructure or public facility project costs
ITEM COST SOURCE
Construction:
Please see Attachment A & B for details
$29,750
Administrative (Public Works Admin) $ 4,250
Architectural/Engineering $
Local permits and fees $
Property Acquisition (if applicable) $
- Real Property $
- Appraisals, Title work & related work $
- Legal Fees $
Contingency $
Other, if applicable $
- Accounting, real estate taxes, consultants $
- Real Estate Taxes $
- Consultants $
$
Total Project Costs $35,000
9
ATTACHMENT A
BUDGET BREAKDOWN
Refurbish the Lefty Gomez Community Center’s Floor:
Flooring: $10,000
Removal of Asbestos Tiles $2,000
Total Cost for Floor Replacement: 12,000
________________________________________________________________________
Refurbish, replenish and repair of Play Structure:
Play Structure $8,000
Fibar $2,000
Total Cost for Floor Replacement: 10,000
________________________________________________________________________
Refurbish the Bungalow:
Painting of the exterior and interior $3,000
Replacement of ceiling tiles $5,000
Total Cost for Bungalow: $8,000
________________________________________________________________________
Install a larger Lefty Gomez Community Center Sign:
24x36 Sign and installation $750
Total Cost for Sign: $750
________________________________________________________________________
G:\spdist\Grants\Rodeo Lefty Gomez Improvements.doc