Loading...
HomeMy WebLinkAboutMINUTES - 08092011 - C.36RECOMMENDATION(S): 1. APPROVE the bid documents, including the plans and specifications for the Iron Horse Corridor Landscaping at Walden Green Phase II, between Mayhew Way and Coggins Drive, Pleasant Hill, for the Department of Conservation and Development. 2. AUTHORIZE the General Services Deputy Director, or designee, to solicit bids to be received on September 15, 2011 at 2:00 p.m. and to issue bid Addenda, as needed, for clarification of the contract bid documents, provided the involved changes do not significantly increase the cost estimate. 3. DIRECT the Clerk of the Board to publish Notices to Contractors in accordance with Public Contract Code Section 22037, inviting bids for this project. 4. DIRECT the General Services Deputy Director, or designee, to mail notices to the construction trade journals specified in Public Contract Code Section 22036 at least thirty calendar days before the bid-opening date. APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 08/09/2011 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Rob Lim, (925) 313-7200 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: August 9, 2011 David Twa, County Administrator and Clerk of the Board of Supervisors By: June McHuen, Deputy cc: GSD Administration, GSD Accounting, GSD CPM Division Manager, GSD CPM Project Manager, GSD CPM Clerical, Auditor's Office, County Counsel's Office, County Administrator's Office, County Administrator's Office C.36 To:Board of Supervisors From:Steve Silveira, Deputy General Services Director Date:August 9, 2011 Contra Costa County Subject:Approve Bid Documents and Authorize Advertisement for Landscaping at Walden Green Phase II Project Between Mayhew Way and Coggins Drive, Pleasant Hill FISCAL IMPACT: No General Funds are involved. Funding is provided by the Redevelopment Agency and County Park Dedication Fees. BACKGROUND: Plans and specifications for the project have been prepared for the General Services Department by Philip Singer, Landscape Architect and filed with the Clerk of the Board by the General Services Deputy Director. The construction cost estimate is $675,000 and the general prevailing wage rates are on file with the Clerk of the Board of Supervisors and will be the minimum rates paid on this project. The adoption of the Contra Costa Centre Area Specific Plan by the Board of Supervisors in October 1998 provided for the conversion of the Iron Horse Corridor (the former Southern Pacific right-of-way) to a landscaped linear greenway between Treat Boulevard and Mayhew Road. Portions of this corridor are also reserved for future transit use, but are allowed to be landscaped in the interim. The Iron Horse Trail is within the corridor. In 2005, construction was completed on the first phase of the linear greenway ("Walden Green Phase I"), between Treat Boulevard and Coggins Drive. The Walden Green Phase II Project extends the linear greenway from Coggins Drive to Mayhew Way, a length of approximately 1/4 mile. As with the Walden Green Phase I Project, Phase II has been designed in conjunction with a community advisory committee that was authorized by the Board of Supervisors on March 23, 2010. The design is consistent with the design guidelines and requirements of the County's Iron Horse Corridor Management Program, the licenses and easements for utilities within the corridor, and the County contract with the State of California to preserve the corridor for future transit use. The Project involves landscape and trail improvements, including the use of native and drought resistant plants. On July 27, 2010 the Board approved proceeding with Phase II of the Walden Green Project. On July 27, 2010, the Board also determined that the Project is Categorically Exempt, per Section 15304(b) of the California Environmental Quality Act (CEQA) Guidelines. CONSEQUENCE OF NEGATIVE ACTION: Without Walden Green Phase II, the linear greenway portion of the Contra Costa Centre Area Specific Plan adopted by the Board will remain incomplete. CHILDREN'S IMPACT STATEMENT: Not applicable.