Loading...
HomeMy WebLinkAboutMINUTES - 12021986 - 1.83 1 • - LL�� o TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: December 2, 1986 SUBJECT: In response to the Board of Supervisors referral on August 19, 1986 regarding Cherry Lane Traffic Problem, Walnut Creek Area, W.O. 4093 Specific Request(s) or Recommendation(s) 8 Background A Justification RECOMMENDATION Accept the following report regarding traffic on Cherry Lane. REASONS FOR RECOMMENDATION/BACKGROUNG Because of the number of accidents which have occurred on Cherry Lane and the increase in traffic during the past few years due to the office and commercial growth in the central county, residents have requested the installation of an impassable barricade to stop the through traffic on Cherry Lane. Staff has met twice with the residents of Cherry Lane to find a solution to the traffic problem without the extreme alternative of closing the road. At the first public meeting on October 13, 1986, residents had a chance to express their concerns about the traffic problem. Their concerns were noted and the meeting closed with an agreement that Staff would determine alternative solutions and present the solutions at a second meeting. At the second public meeting on November 5 , 1986, the residents were presented a three phase solution to improve the safety and mitigate the traffic problem on Cherry Lane. Phase I is a combination of safety improvements to Cherry Lane and traffic mitigation measures on Treat Boulevard. Safety improvement include the installations of stop signs at the intersection of Cherry Lane and Elmwood Drive and Cherry Lane and Seven Hills Ranch Road, the painting of "rumble-strips" on the entrances to Cherry Lane at Treat Boulevard and at Walden Drive, additional traffic control devices and the trimming of roadside landscaping. Continued on attachment: X yes Signature: Recommendation of County Administrator / Approve Other: Signature(s) : Action of Board on: DEC 2 1986 Approved as RecommendedOther Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE AND. CORRECT COPY OF AN ACTION TAKEN V--Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN. Absent: Abstain: Attested DEC 2 1986 Orig. Div.: Public Works (RE) PHIL BATCHELOR, CLERK F FW :ly THE BOARD OF SUPERVISORS BO:2.t12 AND COUNTY ADMINISTRATOR cc: County Administrator Public Works (Ref'l .) By ' DEPUTY ULERK 1 Board of Supervisors December 2, 1986 Page 2 The following Phase I traffic mitigation measures on Treat Boulevard should deter the commute traffic from using Cherry Lane as a shortcut to the downtown Walnut Creek area: (1) restriping westbound Treat Boulevard at Oak Road for two left turn lanes for southbound traffic , and (2) decreasing the allowable signal time for westbound Treat Boulevard traffic turning south onto Cherry Lane . Phase II will install a traffic signal on Cherry Lane at the trail crossing. Phase III will install either a full or partial barricade at several locations on Cherry Lane . This last phase will only occur if the first two phases fail . It was agreed that Phase I would be given 90 days after it is in full operation to see how effective it is in controlling speed , reducing the commute traffic and improving the safety on Cherry Lane . The second meeting concluded with a promise to the residents to meet again on March 2, 1987, to determine whether Phase II or III will be necessary.