HomeMy WebLinkAboutMINUTES - 12161986 - 2.17 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: December 16, 1986
SUBJECT: Right of Way Acquisition for Wildcat Creek and Revolving Fund Loan to Zone 7 ,
Project No. 7527-6D8617, Richmond Area
Specific Requests or Recommendation(s) & Background & Justification
RECOMMENDED ACTION:
The Board of Supervisors, as 'the Governing Body of the Contra Costa County Flood Control
and Water Conservation District,
1. APPROVE and ACCEPT the right of way contract and Grant Deed listed below:
Payee and
Grantor Document Date Escrow Number Amount
Fukushima Nursery Right of Way 12-16-86 Founders Title Co. $575,000
Contract Escrow No. 872080
Grant Deed 12-10-86
2. APPROVE the transfer $375,000 from Flood Control Zone 3B to the Flood Control District
Revolving Fund and a loan from said fund in the amount of $575 ,000 to Flood Control
Zone 7,
3. AUTHORIZE the Chief Engineer of the District to execute the above right of way
contract on behalf of the District,
4. AUTHORIZE the County Auditor to issue a check in the amount specified to be
forward to the County Real Property Division for delivery.
5. DIRECT the Real Property Division to have said Deed recorded in the Office of the
County Recorder. 1.7
Continued on attachment: X yes Signature:.
Recommendation of County Administrator Recommendation of Bjoard Committee
Approve Other:
Signature(s): /
Action of Board on: DEC 16 1986 Approved as Recommended Other
Vote of Supervisors I HEREBY CERTIFY THAT THIS IS A TRUE
AND CORRECT COPY OF AN ACTION TAKEP
Unanimous (Absent ) AND ENTERED ON THE MINUTES OF THE
Ayes: Noes: BOARD OF SUPERVISORS ON DATE SHOWN.
Absent: Abstain:
Attested DEC 16 1986
Orig. Div.: Public Works - Flood Control Phil Batchelor
cc: County Administrator Clerk of the Board of
Auditor/Controller Supervisors and County
County Counsel Administrator
Public Works:
Flood Control Planning
Accounting
BY AnQrr"_ aAi DEPUTY
FINANCIAL IMPACT•
Said loan shall be repaid to the Flood Control District Revolving Fund from a future
reimbursement from the State Department of Water Resources and the sale of the surplus
property after project construction. The purchase of the entire parcel is expected to
yield a net savings in project costs of approximately $100,000. It is anticipated that the
repayment of the loan will occur within two years. `
BACKGROUND:
The site being purchased contains several buildings, that will be impacted by the Wildcat
Creek improvements. The property owner has offered to sell the entire parcel , including
the improvements for the price indicated. The parcel contains approximately 10.8 acres of
land.
CONSEQUENCES OF NEGATIVE ACTION:
Failure to purchase the entire parcel will require that we compensate the property owner
for a portion of the property, three buildings , and possible severance damages.
MfK:md
bo:10.t12
;ter