Loading...
HomeMy WebLinkAboutMINUTES - 07262011 - C.07RECOMMENDATION(S): APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Consulting Services Agreement with Ghirardelli Associates, Inc. (“Ghirardelli”), in an amount not to exceed $118,104, for construction management services for the Countywide Arterial Micro-Surfacing project, Countywide. (88.8% Federal CMA Block Grant – Local Streets and Roads Shortfall Program, and 11.2% Measure J – RTS) (Project No. 0662-6R4066) FISCAL IMPACT: This project, including the contract for construction management services, is funded by Measure J and Federal funding (88.8% Federal CMA Block Grant – Local Streets and Roads Shortfall Program, and 11.2% Measure J – RTS). APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 07/26/2011 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Rob Tavenier, 925-313-2009 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: July 26, 2011 David Twa, County Administrator and Clerk of the Board of Supervisors By: Carrie Del Bonta, Deputy cc: C. 7 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:July 26, 2011 Contra Costa County Subject:APPROVE and AUTHORIZE the Public Works Director to execute a Consulting Services Agreement with Ghirardelli Associates, Inc. (Project No. 0662-6R4066) BACKGROUND: The Countywide Arterial Micro-Surfacing project consists of applying micro-surface treatment to 21 miles of roadway, on ten roads, at seven separate locations. The construction work will include surface preparation, stripe removal, and placement of thermoplastic striping. Three roads are to be restriped and signed for Class II bike lanes. Construction management services are required for the construction phase of the project. Through a qualifications solicitation and interview process, Ghirardelli was determined to be the best-qualified firm to provide the construction management services for this project. Staff recommends that a contract for construction management services, in an amount not to exceed $118,104, be awarded to Ghirardelli. CONSEQUENCE OF NEGATIVE ACTION: Without Board of Supervisors' approval, a delay in the construction management of the Countywide Arterial Micro-Surfacing project will occur, potentially affecting the completion of the project. Project delay may also result in loss of federal funding, degradation of the roadways, and a need for more extensive repairs at a later date. CHILDREN'S IMPACT STATEMENT: Not applicable. CLERK'S ADDENDUM CORRECTED TO READ: APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Consulting Services Agreement with Ghirardelli Associates, Inc., in an amount not to exceed $118,104 for construction management services for the Countywide Arterial Micro-Surfacing project for the period of July 26, 2011 through January 31, 2012, Countywide. (88.53% Federal Highway Bridge Program Funds and 11.47% Measure J Funds) ATTACHMENTS CSA Ghirardelli Associates