Loading...
HomeMy WebLinkAboutMINUTES - 06282011 - C.02RECOMMENDATION(S): APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Consulting Services Agreement with Hanna Engineering, Inc. in an amount not to exceed of $100,705, for construction management services for the Countywide Bridge Deck Methacrylate Project, for the period of June 28, 2011 through January 31, 2012, Countywide. (Project No. 0662-6R4208) FISCAL IMPACT: There is no fiscal impact to the General Fund. This Consulting Services Agreement is funded by Local Road Funds and Federal Funding (Federal Highway Bridge Program Funds 88.5%, and Local Road Funds 11.5%). BACKGROUND: The project will apply a surface treatment on the decks of 23 bridges throughout the County to seal hairline cracks in the concrete bridge decks prolonging the useful life of the deck. Some bridges will also require one or a combination of the following routine maintenance activities: conform paving, joint seal repair, and spall repair. If necessary, bridges will be restriped APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 06/28/2011 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Karen Mitchoff, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Neil Leary, (925) 313-2278 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: June 28, 2011 David Twa, County Administrator and Clerk of the Board of Supervisors By: Carrie Del Bonta, Deputy cc: N. Leary, PW, Design/Construction, J. Chen, PW, Design/Construction, T. Rhys, PW, Design/Construction C. 2 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:June 28, 2011 Contra Costa County Subject:APPROVE and AUTHORIZE the Public Works Director to execute a Consulting Services Agreement with Hanna Engineering, Inc. BACKGROUND: (CONT'D) after project activities are complete. The project is limited to existing bridge decks and approaches and any staging of vehicles will be on existing paved surfaces. Construction management services are required for the construction phase of the Countywide Bridge Deck Methacrylate Project. Hanna Engineering, Inc. was selected to provide these services after completing a request for qualifications solicitation and interview process. CONSEQUENCE OF NEGATIVE ACTION: Without Board of Supervisors' approval, this Consulting Services Agreement will not be in effect. A delay in the construction management of the Countywide Bridge Deck Methacrylate Project will occur, ultimately delaying the completion of the project. Project delay may also result in loss of federal funding and degradation of the bridge decks, which may result in more extensive repairs at a later date. CHILDREN'S IMPACT STATEMENT: Not applicable. ATTACHMENTS CSA Hanna Engineering