HomeMy WebLinkAboutMINUTES - 05102011 - C.01RECOMMENDATION(S):
APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Permit
for Temporary Entry or Use of Portions of the Contra Costa Canal System and Contra Costa
Water District Rights-of-Way for the Pomo Street Arch Culvert Corrosion Repair project,
Bay Point area. (100% Local Road funds) Project No. 0662-6U4090-10
FISCAL IMPACT:
The project cost $307,192 is funded with 100% Local Road funds.
BACKGROUND:
Contra Costa Water District requires a Permit for Temporary Entry or Use of Portions of the
Contra Costa Canal System and Contra Costa Water District Rights-of-Way to be executed
to do work within their right-of-way. The permit document has an indemnification clause
which requires Board authorization.
CONSEQUENCE OF NEGATIVE ACTION:
Without this executed permit, the project cannot be constructed, as access to Contra Costa
Water District’s right-of-way is necessary.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 05/10/2011 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Gayle B. Uilkema, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Neil Leary,
925-313-2278
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: May 10, 2011
David J. Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc: Laurie Sucgang, Public Works Design/Construction
C. 1
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:May 10, 2011
Contra
Costa
County
Subject:Permit for Temporary Entry to the Contra Costa Water District Rights-Of-Way, Pomo Street Arch Culvert
Corrosion Repair Project