HomeMy WebLinkAboutMINUTES - 02082011 - C.29RECOMMENDATION(S):
AUTHORIZE the Conservation and Development Director, or Designee, to execute a
Memorandum of Understanding (MOU) with the California Energy Commission (CEC) to
provide design review, plan check and construction inspection services for the Oakley
Generating Station.
FISCAL IMPACT:
Following execution of this MOU with the CEC, the Department of Conservation and
Development will negotiate a contract with the power plant operator, Radback Energy, for
payment to the County for the services to be provided. All County costs will be fully
reimbursed from this contract, resulting in no net fiscal impact to the County.
BACKGROUND:
The site of the proposed Oakley Generating Station, currently under consideration by the
CEC, is in northeastern Contra Costa County, within the City of Oakley. The address of the
21.95 acre site is 6000 Bridgehead Road. The proposed project is a natural gas-fired,
combined cycle facility with a nominal generating capacity of 624-megawatts. CEC staff
anticipates final
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 02/08/2011 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Gayle B. Uilkema, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Karen Mitchoff, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Jason Crapo,
335-1108
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: February 8, 2011
David J. Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc:
C.29
To:Board of Supervisors
From:Jason Crapo, County Building Official
Date:February 8, 2011
Contra
Costa
County
Subject:Building Inspection Services for Oakley Generating Station Power Plant
BACKGROUND: (CONT'D)
approval of the project by the CEC during the spring of 2011.
The CEC has requested that the Department of Conservation and Development, Building
Inspection Division, serve as Chief Building Official for the Oakley Generating Station
project. The CEC has the authority to delegate this role to the County through its
jurisdiction over power plant construction projects. The County Building Inspection
Division has extensive prior experience providing building inspection services for power
plant projects, and has served in the capacity of Chief Building Official for previous
power plant projects on behalf of the CEC.
CONSEQUENCE OF NEGATIVE ACTION:
If the proposed MOU with the CEC is not approved, the County will not be able to
provide services for the Oakley Generating Station project as proposed by the California
Energy Commission.
CHILDREN'S IMPACT STATEMENT:
none
ATTACHMENTS
MOU
OAKLEY GENERATING STATION 1 MEMORANDUM OF UNDERSTANDING
MEMORANDUM OF UNDERSTANDING
BETWEEN THE
CALIFORNIA ENERGY COMMISSION
AND
CONTRA COSTA COUNTY
BUILDING INSPECTION DIVISION
FOR DESIGN REVIEW, PLAN CHECK, AND
CONSTRUCTION INSPECTION OF THE
OAKLEY GENERATING STATION POWER PLANT PROJECT
09-AFC-4C
RECITALS:
A. On June 30, 2009, Radback Energy, Inc. (Radback) filed an Application for
Certification with the California Energy Commission (Energy Commission) for
approval to construct and operate the Oakley Generating Station (Project). The
21.95 acre project site is located in the City of Oakley in Contra Costa County,
California.
B. In the event the Energy Commission approves the Project, the Energy Commission
must ensure that the Project is designed, constructed, and operated in conformity
with the Energy Commission's Decision (Decision); the California Building
Standards Code (CBSC) ; the local building codes adopted by the City of Oakley,
Contra Costa County; and other applicable laws, ordinances, regulations, and
standards (LORS). The Decision contains the Conditions of Certification for
construction and operation of the Project. Any work undertaken by the Delegate
Chief Building Official (CBO) prior to the issuance of the Decision shall be
performed at the sole risk of the CBO. The Energy Commission does not
guarantee the approval of the Project by executing this Memorandum of
Understanding (MOU).
C. If the Project is approved, the Decision will require that Radback submit
engineering plans, calculations, specifications, and other project-related
information (as required by sections 105.3 and 106.1 in Appendix Chapter 1 of the
CBSC) to the CBO for the project, for review and approval, prior to and during
construction of the project. The intent of this requirement is to provide an
independent review of the Project's final design and inspections of the Project’s
construction, to ensure compliance with applicable engineering LORS, the local
building codes, the CBSC, the Facility Design, Geology, and Transmission System
Engineering Conditions of Certification, and the Storm Water Pollution Prevention
Plan (SWPPP) and the Drainage, Erosion and Sediment Control Plan (DESCP).1
1 The Facility Design, Geology, and Transmission System Engineering Conditions of Certification noted
throughout this MOU are provided in the Decision. The Storm Water Pollution Prevention Plan and
Drainage, Erosion and Sediment Control Plan are discussed in the Decision.
OAKLEY GENERATING STATION 2 MEMORANDUM OF UNDERSTANDING
CONTRA COSTA COUNTY AND ENERGY COMMISSION STAFF AGREE AS
FOLLOWS:
1. The above recitals are incorporated into this agreement.
2. Contra Costa County (County) shall act as the Energy Commission's delegate for
enforcement of: local building codes; the CBSC; the Facility Design, Geology and
Transmission System Engineering Conditions of Certification; and as directed by
the Compliance Project Manager (CPM), the SWPPP and DESCP specified in the
Decision; and other engineering LORS applicable to the Project. The County will
also be responsible for the design review, plan check, and construction inspection
of the foundation, structural features, anchorage, and connections for those
building and non-building structures, process-related systems and equipment
required for power and steam generation, and equipment located either inside or
outside of buildings that are designated in the master drawings and master
specifications list described in Facility Design Condition of Certification GEN-2.
Additions and deletions to the provided list will be made only with the CPM’s
approval. These duties shall be carried out by the County’s Building Official, the
Deputy Director of the Building Inspection Division, Department of Conservation
and Development as the Chief Building Official (CBO) for the project. The ultimate
responsibility for facility design, construction, and operational compliance remains
with Radback. In performing its duties under this MOU, the County retains all
rights and immunities, including the immunity granted under California Government
Code §818.6.
3. Although the County will function as the Energy Commission's delegate, the
Energy Commission has the final authority and responsibility to ensure that the
Project is built in accordance with the applicable engineering LORS, the Decision
and subsequent amendments. The Energy Commission's legal authority to
enforce the terms and conditions of its Decision is specified in California Public
Resources Code section §25500 et seq. The Energy Commission may amend or
revoke the certification for any facility and may impose a civil penalty upon the
project owner for any significant failure to comply with the terms or conditions of
the Decision.
4. To ensure compliance with local building codes; the CBSC; the Facility Design,
Geology and Transmission System Engineering Conditions of Certification; the
SWPPP and the DESCP, and other applicable engineering LORS, the CBO is
authorized to take any action allowed by the California Code of Regulations to
ensure that the Energy Commission’s interests are properly addressed and
protected. If the CBO has issued, or is considering issuing, a stop-work order to
ensure compliance, to ensure that the Energy Commission’s interests are
protected, or for any other reason, the CBO shall seek the cooperation and
assistance of the CPM. The CBO shall notify the CPM in a timely manner,
preferably prior to taking the action, so that the CPM is fully aware of the action
taken or under consideration and its implication to the project. For any action
taken under emergency conditions, the CPM shall be notified within 24 hours of the
action.
OAKLEY GENERATING STATION 3 MEMORANDUM OF UNDERSTANDING
5. In the performance of this agreement, the County its employees and
subcontractors shall act in an independent capacity and not as officers or
employees of the State of California.
6. The CPM shall have the right to approve the qualifications of the CBO engineering
and technical personnel and the scope of work the CBO will perform. The CBO
shall notify the CPM if there is any change in personnel assigned to the Project
team. Replacement personnel shall not work on the Project until they are
approved by the CPM.
7. The CBO may retain the services of one or more independent qualified
subcontractor(s) to supplement the CBO employees in the design review, plan
check, and construction inspection of the Project. The subcontractor(s) will answer
directly to, and be responsible to, the CBO. The CBO shall provide the
qualifications and scope of work of the subcontractor(s) to the CPM for approval at
least ten days prior to the execution of the contract between the County and the
subcontractor(s). The CBO will retain responsibility for the construction
inspections required by Appendix Chapter 1, §109 of the CBSC and for monitoring
special inspections required by Chapter 17, §§1704 and 1707, of the CBSC.
8. At the request of the CPM, the CBO, its subcontractor(s), and any special
inspectors shall assist the CPM in any audits or inspections of the Project.
9. The CBO shall notify the CPM if there is any change in subcontractor(s) or
subcontractor’s personnel. Replacement subcontractor(s) or subcontractor’s
personnel shall not work on the Project until they are approved by the CPM.
10. The CBO shall require that its subcontractors have not previously been employed
directly by the Project owner or its agents at any time during the 12 months prior to
the start of this agreement. The CBO shall also require that, during the course of
this agreement, neither its subcontractors nor its agents will be employed, directly
or indirectly, by the Project owner or any entity of which it is a holding, subdivision,
or subsidiary.
11. The County shall enter into a contract for the Project with Radback on terms and
conditions acceptable to the County and Radback for the payment of fees by
Radback to the County for the County’s provision of CBO services. The County
may enter into said contract, and provide services pursuant to that contract, prior to
the issuance of the Decision. The County will not provide any CBO services
without a contract between the County and Radback. The fees may be based on
the value of the facilities reviewed, may be based on hourly rates, or may be as
otherwise agreed by the CBO and Project Owner. Payments to the County for work
satisfactorily completed may be paid directly to the County in advance, in arrears,
or from a credit account established with the County by Radback. The County
shall provide the CPM, for review and approval, a copy of the contract together
with a schedule of fees between the County and Radback ten days prior to the
execution of the contract.
OAKLEY GENERATING STATION 4 MEMORANDUM OF UNDERSTANDING
12. The CBO shall take all reasonable measures to accommodate Radback’s design
and construction schedule, including but not limited to adding staff to its workforce
and/or retaining the services of additional independent qualified subcontractor(s).
The addition of staff and/or retaining the services of subcontractor(s) is at the
discretion of the County, with the coordination of the CPM to verify qualifications
and expertise.
13. The CBO shall review and approve the selection of dynamic analysis and/or
alternative methods of analysis for the design of those major structures designated
in Facility Design Condition of Certification GEN-2 to comply with the CBSC.
14. The CBO shall review and approve any of Radback’s proposed special and
continuous inspection edition of the reporting programs required by Chapter 17 of
the CBSC, and other related codes, and shall approve the qualifications and
experience of the proposed special inspectors. Where appropriate, subject to
CPM approval, the CBO shall accept the results of inspections performed by
Radback’s special inspectors.
15. The CPM shall have the right to audit the CBO’s and its subcontractors’
performance to ensure that they are properly carrying out their duties and
responsibilities and that Radback is implementing the Decision requirements for
the design and construction of the Project.
16. The CBO and subcontractor(s) may discuss all aspects of the Project with each
other, the CPM, and Radback’s construction contractors and engineers. The CBO
and CPM shall have access to all associated construction records, construction
and inspection procedures, test equipment, and test results related to the
requirements of the Decision. It is the CPM's intention to provide reasonable
notice of site visits and audits and to conduct such activities at reasonable times.
Circumstances may dictate that site access may be required with little or no notice.
17. The CBO shall provide weekly reports on the status of construction of the Project
to be posted to the Project website, or by e-mail if a website is not available (see
below). The reports shall include: executive summary of current issues; general
activities occurring at the Project site; the completion percentage of overall
construction; compliance issues with applicable LORS and applicable Conditions
of Certification; issues of concern with or by Radback; status of interconnections;
scheduled activities for the following week; and potential delays to the on-line date
of the Project. Many of the information requirements of the weekly status report
may be satisfied by updating fields on the Project website on a weekly basis.
18. The CBO shall create and maintain a password-protected Project website for the
posting of the weekly reports and other project documents. Documents on the
website will be posted in a Microsoft Word-compatible format or as a portable
document format (pdf) file. The Project website shall include the following
information in an easily navigable format: all components of the weekly status
report; a minimum of ten dated Project photographs of current construction
activities; list and status of submitted plans; status of field inspections; new
subcontractors or key CBO personnel; and documents submitted for CPM review
OAKLEY GENERATING STATION 5 MEMORANDUM OF UNDERSTANDING
and/or approval. The CPM will be notified of new documents posted to the Project
website by e-mail with an active link to the document.
19. The CBO shall submit the results of all plan checks and construction inspections,
including recommendations, to Radback and send a copy of all transmittal letters
to the CPM via the website or email if the website becomes unavailable. The CPM
shall conduct any technical audits and reviews and present any recommendations
as expeditiously as possible. The CBO should proceed with reviews and
approvals of all components designated in Facility Design Condition of Certification
GEN-2 unless instructed otherwise by the CPM. Approved plans, specifications,
calculations, and marked-up as-builts shall be retained by the CBO for 90 days
from the date of completion of construction of the Project, after which the CBO
shall deliver them to the project owner for long-term retention at the project site or
other accessible location as required by Condition of Certification GEN-8 in the
Facility Design section of the Decision. Electronic copies of the approved plans,
specifications, calculations, and marked-up as-builts shall be provided to the CPM,
in the form of compact discs, within 90-day of completion of construction on the
Project.
20. The Energy Commission, through the CPM, retains the final authority over all
matters relating to interpretation of the Conditions of Certification.
21. The term of this MOU is indefinite, but shall terminate when all of the mutual
obligations have been performed and satisfied. It shall also terminate at such time
as Radback fails to pay fees as required or renders the CBO’s performance under
this agreement impossible. Notwithstanding the foregoing, either party may
terminate this agreement upon five (5) days advance written notice complying with
the provisions of section 22 below.
22. All correspondence regarding this MOU, including invoices, payments, and notices,
shall be directed to the following persons at the following addresses and telephone
numbers:
CBO: Jason Crapo
Building Official, Deputy Director
Building Inspection Division
Department of Conservation and Development
651 Pine Street, 3rd Floor N. Wing
Martinez, CA 94553
(925) 335-1108 Office
(925) 646-1219 FAX
Jason.Crapo@dcd.cccounty.us
ENERGY COMMISSION: Craig Hoffman, Compliance Program Manager
California Energy Commission
1516 9th Street, MS 2000
Sacramento, CA 95814
(916) 654-4781 Office
(916) 654-3883 FAX
OAKLEY GENERATING STATION 6 MEMORANDUM OF UNDERSTANDING
choffman@energy.state.ca.us
Written correspondence shall be sent by personal delivery (including overnight
delivery service), by U.S. Mail, by fax, or by e-mail. It shall be considered
delivered when actually received.
23. This MOU shall be effective upon execution by all parties.
24. In the event of a conflict between this MOU and a Decision granting approval of an
application for certification, the Decision shall take precedence.
25. This agreement shall be interpreted and applied in accordance with California law.
26. This agreement sets forth the parties' entire understanding and supersedes all
prior agreements and representations, written and oral, and may be modified only
by a written document signed by the CBO and the Energy Commission.
The County has reviewed this MOU and understands its duties and responsibilities.
Signed by:
COUNTY OF CONTRA COSTA
DATED:
JASON CRAPO,
County Building Official
Deputy Director, Building Inspection
Department of Conservation and Development
CALIFORNIA ENERGY COMMISSION
DATED:
TERRENCE O’BRIEN, Deputy Director for
Siting, Transmission & Environmental
Protection