HomeMy WebLinkAboutMINUTES - 02082011 - C.01RECOMMENDATION(S):
AUTHORIZE the Public Works Director, or designee, to advertise for On-Call Contracts for Various Road and Flood
Control Maintenance Work, Contract No. 0672-6U2009 for routine maintenance, repair, replacement, or
reconstruction of existing road and flood control facilities, Countywide.
FISCAL IMPACT:
There is no fiscal impact to the General Fund. The On-Call Contracts for Various Road and Flood Control
Maintenance Work is to be funded by Local Road and Flood Control funds (100%).
BACKGROUND:
The Public Works Department uses On-Call Contracts for Various Road and Flood Control Maintenance Work to
provide support as needed to Public Works Maintenance crews for various routine road and flood control
maintenance repairs, such as but not limited to, storm damage repair work, including rock slope protection, slope
stabilization, culverts, and concrete structures, on an as-needed basis,
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD
COMMITTEE
Action of Board On: 02/08/2011 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYES 5 NOES ____
ABSENT ____ ABSTAIN ____
RECUSE ____
Contact: Joe Yee, 313-7002
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of
the Board of Supervisors on the date shown.
ATTESTED: February 8, 2011
David J. Twa, County Administrator and Clerk of the Board of Supervisors
By: EMY L. SHARP, Deputy
cc:
C. 1
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:February 8, 2011
Contra
Costa
County
Subject:Advertise the On-Call Maintenance Contracts for Various Road and Flood Control Maintenance Work
BACKGROUND: (CONT'D)
in various locations within Contra Costa County.
The Public Works Department intends to award at least one $300,000 contract, but not more than four $300,000
contracts, to the responsible bidder(s). Each contract will have a term of two years and used as needed with no
minimum amount that has to be spent.
CONSEQUENCE OF NEGATIVE ACTION:
The Public Works Department may be unable to complete routine road and flood control maintenance work in a
timely manner.
CHILDREN'S IMPACT STATEMENT:
Not applicable.