HomeMy WebLinkAboutMINUTES - 11092010 - C.11RECOMMENDATION(S):
APPROVE Purchase And Sale Agreement and ACCEPT the Grant Deed dated October 22,
2010 from Vasili Millias, Trustee of the Donald A. Williamson Charitable Remainder
Trust, et al. Government code 25350, (District V)
AUTHORIZE the Chief Engineer, or designee to execute said Purchase and Sale
Agreement on behalf of the District.
APPROVE payment of $45,000.00 for said property rights and AUTHORIZE the
Auditor-Controller to issue a check in said amount payable to North American Title
Insurance Company, 645 San Ramon Valley Boulevard, Danville, CA 94526, Escrow No.
54705-911131-09, to be forwarded to the Real Property Division for delivery.
DIRECT the Real Property Division to have the above referenced Grant Deed recorded in
the office of the County Recorder.
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 11/09/2010 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Gayle B. Uilkema, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Federal D. Glover, District V
Supervisor
ABSENT:Susan A. Bonilla, District IV
Supervisor
Contact: Carla Peccianti
925-313-2222
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: November 9, 2010
David J. Twa, County Administrator and Clerk of the Board of Supervisors
By: EMY L. SHARP, Deputy
cc: Julie Carlson, Real Property, County Administrator, Auditor-Controller , Carl Roner, CCCFCWCD , P.W. Finance, Lori Brown
C.11
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:November 9, 2010
Contra
Costa
County
Subject:Upper Sand Creek Basin Project. Task: ACQ, Account: 3540, Antioch area. Project No. 7562-6D8518
FISCAL IMPACT:
Payment of $45,000.00 from Drainage 130 Area funds.
BACKGROUND:
The Contra Costa County Flood Control and Water Conservation District (District) plans
to expand the Upper Sand Creek Basin (USCB) located in the southeast portion of the
City of Antioch (Antioch), south of Lone Tree Way, east of Deer Valley Road, north of
Balfour Road, and west of State Route 4 Bypass. In 1992, this Board as governing Board
of the District, approved the Final EIR for Sand Creek watershed improvements. This
EIR considered eight alternatives made up of various detention basin sites throughout the
watershed. After careful consideration, the Board chose Alternative 8, which included
USCB in its current location.
Phase One of USCB was constructed in 1994 as part of Assessment District 27 in
Antioch. The interim UCSB currently receives local runoff from the adjacent
subdivisions. The expansion will provide regional flood protection benefits for
downstream communities. The expanded UCSB will receive runoff from the surrounding
11 square miles of tributary areas.
The USCB expansion project (Project) consists of excavating ± 255,000 cubic yards of
soil from the existing interim basin to create a deeper basin for holding stormwater
during major storm events, then slowly releasing this stormwater through the outlet pipe,
reducing peak flows downstream in both Sand and Marsh Creeks. The project will
expand the interim basin to the ultimate size, increasing it from approximately 120 to
1,000 acre-feet of capacity. The project also includes the construction of a “fill” dam
along the easterly (downstream) side of the site, which will impound floodwater.
A Notice of Determination was filed and Posted on September 14, 1992. [#CP 88-69
(SCH #90030280)]
CONSEQUENCE OF NEGATIVE ACTION:
The District will not have the necessary property rights to expand USCB to its ultimate
configuration.
CHILDREN'S IMPACT STATEMENT:
Not Applicable