Loading...
HomeMy WebLinkAboutMINUTES - 01081985 - 1.24 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on January 8, 1985 by the following vote: AYES: Supervisors Powers , Fanden, Schroder, McPeak & Torlakson NOES: None ABSENT: None ABSTAIN: None r SUBJECT: Consulting Services Agreement for the preparation of improvement plans for the reconstruction of Mt. Diablo Boulevard, San Ramon Creek Bypass project, FCZ #3B, Project No. 7520-6B-8637. A The Chief Engineer has recommended that the design of the relocation of Mt. Diablo Blvd. , required by the construction of the San . Ramon Creek Bypass channel , be prepared for incorporation in the Corps of Engineers' construction contract. IT IS BY THE BOARD ORDERED, as the governing body of the Contra Costa County Flood Control and Water Conservation District that the Chief Engineer is AUTHORIZED to execute a consulting services agreement with PRC Engineering, Inc. , Consulting Engineers of Orinda, providing for the necessary survey and design services to complete an acceptable relocation plan, at a cost not to exceed $4,800 without prior approval of the Chief Engineer. I hereby certify that this to a true and correct copy of an action taken and enterer-on the minutes of the Board of Supervisors on the date shown. ATTESTSO: JAN 8 1985 PHIL BATCHELOR, Clark cf the Board of Supervisors and County Administrator By ,Deputy Orig. Dept. Public Works Department, Flood Control Planning Division cc: County Administrator County Auditor-Controller Public Works Director Flood Control Division Accounting Division PRC Engineering, Inc. , Consulting Engineers of Orinda 89 Davis Road, Suite 200 ter'i fua CA 9450) BO:ConsultSvcAgree GC:bc 00 '. 22