HomeMy WebLinkAboutMINUTES - 01081985 - 1.24 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on January 8, 1985 by the following vote:
AYES: Supervisors Powers , Fanden, Schroder, McPeak & Torlakson
NOES: None
ABSENT: None
ABSTAIN: None
r
SUBJECT: Consulting Services Agreement for the preparation of improvement
plans for the reconstruction of Mt. Diablo Boulevard, San Ramon Creek
Bypass project, FCZ #3B, Project No. 7520-6B-8637.
A
The Chief Engineer has recommended that the design of the
relocation of Mt. Diablo Blvd. , required by the construction of the San .
Ramon Creek Bypass channel , be prepared for incorporation in the Corps of
Engineers' construction contract.
IT IS BY THE BOARD ORDERED, as the governing body of the Contra
Costa County Flood Control and Water Conservation District that the Chief
Engineer is AUTHORIZED to execute a consulting services agreement with PRC
Engineering, Inc. , Consulting Engineers of Orinda, providing for the
necessary survey and design services to complete an acceptable relocation
plan, at a cost not to exceed $4,800 without prior approval of the Chief
Engineer.
I hereby certify that this to a true and correct copy of
an action taken and enterer-on the minutes of the
Board of Supervisors on the date shown.
ATTESTSO: JAN 8 1985
PHIL BATCHELOR, Clark cf the Board
of Supervisors and County Administrator
By ,Deputy
Orig. Dept. Public Works Department, Flood Control Planning Division
cc: County Administrator
County Auditor-Controller
Public Works Director
Flood Control Division
Accounting Division
PRC Engineering, Inc. , Consulting Engineers of Orinda
89 Davis Road, Suite 200
ter'i fua CA 9450)
BO:ConsultSvcAgree
GC:bc
00 '. 22