HomeMy WebLinkAboutMINUTES - 08032010 - C.21RECOMMENDATION(S): APPROVE and AUTHORIZE the Conservation and Development Director, or her designee, to execute an amendment to the contract with Loving Campos Architects Incorporated (LCA) to increase the amount by $54,900 for a total not exceed $140,900 to complete initial architectural schematic and conceptual design services for the 30/40 Muir Road Building renovation project. FISCAL IMPACT: No Impact. No General Fund revenue will be used because costs are covered by fees for building permits and land development applications collected for facility improvements and operations of the Department of Conservation and Development. BACKGROUND: This project involves the renovation of two County-owned buildings located at 30/40 Muir Road in Martinez. The department contracted with LCA to assist with development of architectural schematic design documents. This architectural design included exterior wall treatment, interior design and certain features that were derived from the Building Program update. APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 08/03/2010 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Susan A. Bonilla, District IV Supervisor Federal D. Glover, District V Supervisor Contact: John Gregory (925) 313-4330 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: August 3, 2010 David J. Twa, County Administrator and Clerk of the Board of Supervisors By: KATHERINE SINCLAIR, Deputy cc: C.21 To:Board of Supervisors From:Catherine Kutsuris, Conservation & Development Director Date:August 3, 2010 Contra Costa County Subject:Contract Amendment with Loving Campos Architects, Incorporated (LCA) BACKGROUND: (CONT'D) The additional services were not provided in the original contract when it was determined the architectural schematic design documents would be included in the "bridging documents". The bridging documents form the basis of the request for proposals to be issued to the short-listed Design-Build firms. The architectural schematic design documents are also being used as the basis of the Mechanical / Electrical / Plumbing Schematic design. Given the importance of the documents, an enhanced schematic design was asked of LCA and this was the basis of the additional costs. CONSEQUENCE OF NEGATIVE ACTION: Project will not have viable schematic design documents to proceed with Design Build process. Delays will occur in providing adequate documentation for all aspects of the project. CHILDREN'S IMPACT STATEMENT: ATTACHMENTS copy of approved contract