HomeMy WebLinkAboutMINUTES - 06222010 - C.107RECOMMENDATION(S):
APPROVE the Amended 2010/2011 North Richmond Waste and Recovery Mitigation Fee
Expenditure Plan which specifies recommended allocations of projected mitigation fee
revenue in 2010/2011 to fund implementation of specified strategies as well as related staff
costs incurred by City of Richmond and County related to the development, implementation
and oversight of the two-year Expenditure Plan.
FISCAL IMPACT:
No impact to the County General Fund. The 2010/2011 Amended North Richmond Waste
and Recovery Mitigation Fee Expenditure Plan (see Exhibit A) is based on projected
revenue from mitigation fee charged on material and waste processed at the Bulk Material
Processing Center (BMPC) located at the West Contra Costa Sanitary Landfill (WCCSL).
The Expenditure Plan budget specifies how to allocate a total of $2,207,042 in expected
mitigation fee revenue for calendar years 2010 and 2011 (based on $1,177,661 in projected
2010/2011 revenue according to Republic Services Inc. and $1,029,281 in unexpended
revenue from calendar years 2008/2009).
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 06/22/2010 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Gayle B. Uilkema, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Federal D. Glover, District V
Supervisor
ABSENT:Susan A. Bonilla, District IV
Supervisor
Contact: Matthew Kelley,
925-335-1238
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: June 22, 2010
David J. Twa, County Administrator and Clerk of the Board of Supervisors
By: June McHuen, Deputy
cc:
C.107
To:Board of Supervisors
From:Catherine Kutsuris, Conservation & Development Director
Date:June 22, 2010
Contra
Costa
County
Subject:Amended 2010/2011 North Richmond Waste & Recovery Mitigation Fee Expenditure Plan
BACKGROUND:
The Waste & Recovery Mitigation Fee was established as a result of the Draft
Environmental Impact Report (EIR) dated November 2003 for the WCCSL Bulk
Materials Processing Center (BMPC) and Related Actions (Project). The Project involved
new and expanded processing and resource recovery operations on both the incorporated
and unincorporated area of the Project site, which the EIR concluded would impact the
host community. To mitigate this impact Mitigation Measure 4-5 called for a Mitigation
Fee to benefit the host community, described as follows:
“Mitigation Fee. The facility operator shall pay a Mitigation Fee of an amount to be
determined by the applicable permitting authority(ies) to defray annual costs associated
with collection and disposal of illegally dumped waste and associated impacts in North
Richmond and adjacent areas. The mitigation fee should be subject to the joint-control of
the City and County and should be collected on all solid waste and processible materials
received at the facility consistent with the existing mitigation fee collected at the Central
IRRF.”
In July 2004, the City of Richmond and Contra Costa County entered into a
Memorandum of Understanding (MOU) agreeing to jointly administer Mitigation Fee
monies collected from the BMPC for the benefit of the incorporated and unincorporated
North Richmond area.
The MOU requires that the mitigation fee revenue collected from the Operator (WCCSL,
Inc.) be paid to the County and held in a dedicated separate account. The North
Richmond Mitigation Fee Committee (NRMFC) was formed pursuant to the terms of the
MOU for the specific purpose of preparing a recommended two year Expenditure Plan.
The Committee consists of three Richmond City Council persons, two North Richmond
Municipal Advisory Council members; one incorporated North Richmond resident and
County Supervisor John Gioia. This Expenditure Plan provides a means to jointly
administer the Mitigation Fee funding for the benefit of the host community, as described
in the EIR.
The Mitigation Fee Committee approved utilizing a phased approach to develop the
2010/2011 Expenditure Plan. Development and approval of a 2010/2011 Preliminary
Expenditure Plan budget (Phase 1) was based solely on the amount of Mitigation Fee
funding expected to be collected in calendar years 2010 and 2011 projections which was
estimated to be a total of $1,177,611. The Committee considered and approved the
Preliminary 2010/2011 Expenditure Plan and budget (Phase 1) at their meeting on
October 26, 2009, and the City Council and the Board of Supervisors both approved the
Preliminary Plan at their December 15, 2009 meetings.
At their meeting on May 3, 2010, the North Richmond Waste and Recovery Mitigation
Fee Committee voted to recommend that the City of Richmond City Council and Contra
Costa County Board of Supervisors approve the Amended 2010/2011 Expenditure Plan
Costa County Board of Supervisors approve the Amended 2010/2011 Expenditure Plan
on May 3, 2010. Phase 2 included the development of an Amended Preliminary
2010/2011 Expenditure Plan to allocate the amount of unexpended funding remaining
from the 2008/2009 Expenditure Plan budget, which is $1,029,381. Phase 2 allocations
provide new or supplemental funding for strategies that were either unfunded or under
funded during Phase 1. Staff received input from Committee members; City and County
staff, as well as from mitigation-funded contractors regarding the activities and associated
funding amounts desired to be included under specific strategies.
A substantial portion of the Phase 2 funding to be allocated in this 2010/2011 Amended
Expenditure Plan is recommended to be allocated to Strategy 14, which actually includes
funding for nine separate community-based projects which where selected by the
NRMFC at their meeting on May 3, 2010 (for listing see Exhibit B).
CONSEQUENCE OF NEGATIVE ACTION:
CHILDREN'S IMPACT STATEMENT:
ATTACHMENTS
Attachment A
Attachment B
North Richmond Waste & Recovery Mitigation Fee
Amended 2010/2011 Expenditure Plan
INTRODUCTION
The Waste & Recovery Mitigation Fee was established as a result of the Draft
Environmental Impact Report (EIR) dated November 2003 for the WCCSL Bulk
Materials Processing Center (BMPC) and Related Actions (Project). The Project
involved new and expanded processing and resource recovery operations on both the
incorporated and unincorporated area of the Project site, which the EIR concluded would
impact the host community. To mitigate this impact Mitigation Measure 4-5 called for a
Mitigation Fee to benefit the host community, described as follows:
“Mitigation Fee. The facility operator shall pay a Mitigation Fee of an amount to
be determined by the applicable permitting authority(ies) to defray annual costs
associated with collection and disposal of illegally dumped waste and associated
impacts in North Richmond and adjacent areas. The mitigation fee should be
subject to the joint-control of the City and County and should be collected on all
solid waste and processible materials received at the facility consistent with the
existing mitigation fee collected at the Central IRRF.”
In July 2004, the City of Richmond and Contra Costa County entered into a
Memorandum of Understanding (MOU) agreeing to jointly administer Mitigation Fee
monies collected from the BMPC for the benefit of the incorporated and unincorporated
North Richmond area. This North Richmond Waste & Recovery Mitigation Fee Joint
Expenditure Planning Committee (Committee) was formed pursuant to the terms of the
MOU for the specific purpose of preparing a recommended two year Expenditure Plan.
This Expenditure Plan provides a means to jointly administer the Mitigation Fee funding
for the benefit of the host community, as described in the EIR. The Expenditure Plan is
subject to final approval of the Richmond City Council and the Contra Costa County
Board of Supervisors.
By approving this Expenditure Plan, the City Council and Board of Supervisors authorize
the use of Mitigation Fee funding for only the purposes and in the amounts specified
herein. The City and County have each designated their respective staff persons
responsible for administering the development and implementation of the approved
Expenditure Plan, which includes responsibility for drafting and interpreting Expenditure
Plan language. However, the City and County have not delegated to the Committee or
to staff the authority to expend funding for purposes not clearly identified in the
Expenditure Plan document officially approved by their respective decision-making
bodies.
BUDGET
The funding allocations shown on the Expenditure Plan Budget table are based on
revenue estimates that are dependant upon multiple variables (e.g. number of tons of
recovered materials vs. solid waste, per ton gate rate charged and amount of CPI-
adjusted per ton Mitigation Fee). Revenue projections may deviate from those provided
by Republic and used to prepare this Budget. It is likely that some adjustments will be
necessary to accommodate variations between estimated and actual revenue as well as
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 2 of 9
disparity between estimated and actual costs for non-fixed cost strategies. Adjustments
may be needed due to under-utilization of a particular program if estimated expenditure
was based on per unit cost. If the number of units allocated to a particular line item is not
determined to be needed based upon usage, the remaining funding could be
redistributed by officially amending the Expenditure Plan..
The Budget includes some line items that are based on fixed costs, however generally
there are other line items which are scalable and/or dependant on utilization thereby
providing flexibility to adjust amount allocated if and when a significant need is identified.
This Expenditure Plan may only be adjusted upon official action taken by both the City
and County. Although there has been some interest in allowing flexibility for staff to
adjust funding allocations under specific circumstances, the authority to approve or
modify the Expenditure Plan rests solely with the City Council and Board of Supervisors.
The two-year Expenditure Plan cycle was established by the City and County to
minimize the administrative burden and costs associated with having to go through a
joint budget approval process more than once every two years. In order to minimize the
amount of funding needed to cover staff costs incurred to amend the Expenditure Plan,
staff will only recommend changes to the Expenditure Plan when necessary to address a
significant and time-sensitive need.
North Richmond Waste and Recovery Mitigation Fee Expenditure Plan
#Expenditure Plan (EP) Strategy
Adopted
Preliminary
2010-2011
Budget
(Phase 1)
Potential
Additional
Funding
Allocations
(Phase 2)
Estimated
Combined 2010-
2011
Allocations
1 Bulky Item Pick-ups & Disposal Vouchers 2,000$ 8,000$ 10,000$
2 Neighborhood Clean-up Events -$ 25,000$ 25,000$
3 Community Services Coordinator 144,262$ -$ 144,262$
4 Bilingual Outreach Services Coordinator 56,000$ -$ 56,000$
5 North Richmond Green Outreach *-$ 34,500$ 34,500$
6 City/County Pick-up from Right-of-Way 70,000$ 5,000$ 75,000$
7 Code Enforcement 258,000$ -$ 258,000$
8 Graffiti Abatement 20,000$ 10,000$ 30,000$
9 Law Enforcement (Investigation & Patrols)375,000$ -$ 375,000$
10 Surveillance Camera System 10,000$ 50,000$ 60,000$
11 Illegal Dumping Prosecutor 65,149$ -$ 65,149$
12 Parks Rehabilitation Initiative $ 19,250 $ 70,750 $ 90,000
13 Capital Improvement Projects (Infrastructure & Creeks)-$ 105,000$ 105,000$
14 North Richmond Community-Based Projects 50,000$ 350,000$ 400,000$
15 North Richmond Green Community Service Programs *8,000$ 37,000$ 45,000$
16A Community Gardenining Project - Lots of Crops 56,000$ 56,000$
16B Mentorship Project - YAEC 47,000$ 47,000$
17G Wildcat Creek - Urban Creeks Council 15,000$ 15,000$
17H Wildcat Creek - County Flood Control District 20,000$ 20,000$
X Committee Administration/Staffing 100,000$ 11,131$ 111,131$
Contigency 185,000$ 185,000$
Total Projected Revenue **1,177,661$ 1,029,380.77$ 2,207,042$
Total Expenditure Plan Budget**1,177,661$ 1,029,381$ 2,207,042$
** Total 2010/2011 projected revenue ($2,207,402) based upon the amount of funding projected to be received in 2010/2011
($1,177,661) + actual funding received and not spent under the 2008/2009 Expenditure Plan ($1,029,381).
* The Phase I funding in the amount of $8,000 was originally allocated under Strategy 5 and allowed to be used for Little
League related expenses, these type of NR Green programs are now being proposed to fal under new Strategy 15. Prevention & EducationAbatement & EnforcementCommunity InvestmentStrategies and allocations being carried over from the 2008/2009 Expenditure Plan ($138,000)
D:\Illegal Dumping\BMPC Mitigation Fee Committee\Meetings\2010 Meetings\May 3\Phase2-Budget_2010-11 EP_4-29-10.xls
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 4 of 9
DESCRIPTION OF STRATEGIES RECOMMENDED FOR FUNDING
Funding allocations for each strategy is specified on the attached Budget Table.
The funding allocation amounts are for the two-year Expenditure Plan period.
PREVENTION & EDUCATION
1. Bulky Item Pick-ups & Disposal Vouchers
Provide residents in the Mitigation Fee Primary Funding Area, who prove
eligibility consistent with City/County procedures, with the option of choosing
to:
o request up to one on-call pick-up service per calendar year for bulky
items that are not accepted in the current on-call clean-ups through
Richmond Sanitary Service (RSS); must have an active account with
RSS, or
o request up to twelve $5 vouchers for disposal at Republic’s transfer
station on Parr Blvd. per calendar year (vouchers expire after six
months, Mitigation Fees only pay for vouchers that are actually
redeemed).
2. Neighborhood Clean-ups
Provide at least one neighborhood and/or creek clean-up event in the
Mitigation Fee Funding Area; additional clean-up event may be scheduled
as funding allows.
3. Community Services Coordinator
Fund full-time Community Services Coordinator position to be staffed on a
contract basis through a non-profit or public entity (including
salary/benefits/overhead). The CS Coordinator shall serve as a link
between the community of North Richmond, the City of Richmond, and
Contra Costa County for issues related to beautification, illegal dumping,
and blight; assist the City and County in implementing specified strategies
from the Expenditure Plan; and coordinate specified activities related to
illegal dumping and beautification within the North Richmond Primary
Mitigation Funding area.
4. Community Services Assistant
Fund a part-time Community Services Assistant to assist community
members interested in claiming Vouchers or Bulky-Item Pick ups, reporting
illegal dumping, seeking referral/resources as well as track data related to
illegally dumped waste collected by Republic Services Hot Spot Crew
(including salary/benefits/overhead) on a contract basis through a non-profit
or public entity. If Community Services Coordinator is not bilingual,
Assistant shall be bilingual or related services shall be provided in order to
assist with translation services on a contract basis through a non-profit or
public entity.
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 5 of 9
5. North Richmond Green Campaign
Fund public outreach activities of the below specified types upon where the
specific details related to each activity has been submitted to staff and
determined to align with the purpose of the Mitigation Fee and Expenditure
Plan:
· Banners (light pole banners, which may include pictures of native
flowers, nrgreen.org website, pictures or names of North Richmond
churches/organizations/institutions, and will include “jointly funded by
City of Richmond and Contra Costa County”
· Stipends for community members (youth and adults) for door-to-door
outreach to promote mitigation-funded strategies
· NR Green Festival – plan to hold in Spring/Summer 2010 (which may
include information booths, fun activities for kids, food, and information
about community-beautification projects)
· Printing – flyers; brochures (which will include “jointly funded by City of
Richmond and Contra Costa County” and subject to committee staff
approval)
· T-Shirts - t-shirts with NRGreen.org website (which will include “jointly
funded by City or Richmond and Contra Costa County” and design
subject to committee staff approval)
· Signage – other banners for educational purposes (which will include
“jointly funded by City or Richmond and Contra Costa County” and
design subject to committee staff approval)
· Design and printing of staff approved Banners, Signage and/or T-Shirts
which include NR Green website and local phone number for
Community members to learn more about Mitigation funded
programs/efforts
· Design, printing and/or distribution of staff approved education and
outreach materials which include “Funded by City of Richmond &
Contra Costa County” and are clearly intended to directly:
• Inform the community about Mitigation funded programs/efforts,
increase participation in Mitigation funded programs/efforts,
• Reduce illegal dumping and blight in the Mitigation Fee Funding
Area, and
• Promote beautification in the Mitigation Fee Funding Area.
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 6 of 9
ABATEMENT & ENFORCEMENT
6. City/County Pick-up from Right-of-Way
Fund consolidated pick-up program (including personnel, mileage,
administrative costs and equipment rental as needed) for illegal dumping in
the public right-of-way located within the unincorporated & incorporated
Mitigation Fee Primary Funding Area to remove items not collected by the
designated RSS Hot Spot Route crew.
7. Code Enforcement Staff
Fund full-time County code enforcement position (including salary/benefits
and related vehicle and equipment costs), to assist with vacant/abandoned
lot abatements and fencing as well as other health/building/zoning violations
related to illegal dumping and blight throughout the incorporated &
unincorporated Mitigation Funding Area.
8. Graffiti Abatement
Fund consolidated graffiti abatement program (including personnel,
mileage, administrative costs and purchase/rental of equipment and
materials) for graffiti on public property and/or visible from the public right-
of-way located within the unincorporated & incorporated Mitigation Fee
Primary Funding Area.
9. Illegal Dumping Law Enforcement (Investigations & Patrols)
Fund approximately 94% of the equivalent of a full-time Sheriff Deputy
(including salary/benefits, overtime, uniform and related cell phone,
equipment, and vehicle costs) to assist with law enforcement investigations
and patrols to combat illegal dumping within the Mitigation Fee Primary
Funding Area.
10. Surveillance Cameras
Fund the purchase of cameras, camera infrastructure, and costs related to
maintenance, repair & relocation of surveillance camera program
equipment within the Mitigation Fee Primary Funding Area to target specific
locations where illegal dumping occurs most regularly.
11. Illegal Dumping Prosecutor
Fund quarter-time of community prosecutor position in order to ensure
some time can be dedicated to prosecuting cases for violations that occur
within the Mitigation Fee Primary Funding Area with special emphasis on
instances of commercial dumping as well as other quality of life issues (e.g.
alcohol abatement, environmental crimes).
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 7 of 9
COMMUNITY INVESTMENT
12. Parks Rehabilitation Initiative
Fund various park and related projects and maintenance at Third Street
Ball field, Shields-Reid Park and other areas within the Mitigation Fee
Primary Funding Area.
13. Capital Improvement Projects
Fund various capital improvement projects , including infrastructure and
creek related improvements, within the Mitigation Fee Primary Funding
Area.
Projects could include but are not limited to:
o Street & sidewalk improvements at railroads and railroad crossings
o Beautification and/or structural enhancements to the exterior of
specific community identified structures
o Lighting
o Street medians
o Creek-related improvement or rehabilitation
14. North Richmond Community-Based Projects
Fund the development, implementation and oversight of a variety of
community-based projects1 with specific focuses on anti-littering,
environmental stewardship, blight reduction and/or beautification (including
personnel/labor, administrative oversight, materials, equipment and related
maintenance costs). Rather than funding stipend programs separately
(including stipends, administrative oversight and related
materials/equipment), new community-based projects/programs should
include component for stipends, where appropriate, to pay local youth
and/or other community members for assisting with illegal dumping
prevention/abatement or beautification activities within the Mitigation Fee
Primary Funding Area.
Community-Based Projects could include but are not limited to:
o Neighborhood Landscaping & Gardening Projects
o Greening Project
o Community Art Programs (e.g. Tile Art, Murals or Safe
Routes/Popsicle Project)
o Mentorship Programs
1 At the October 2009 meeting, the Committee voted to modify Strategies 13 and 14 as needed so that when the
Expenditure Plan is amended to incorporate remaining 2008-2009 Mitigation Fee funding (during Phase 2 in early 2010),
up to $103,707 of the potential funding to be allocated to Strategy 13 may be used to cover costs associated with the
rehabilitation of the Eco-1 Educational Center (Housing Authority building) that has been proposed by the Neighborhood
House of North Richmond (NHNR) and up to an additional $38,610 of future allocations made to Strategy 14 to fund up to
half of the cost of stipends paid to North Richmond residents for time spent assisting Eco Academy building and site
rehabilitation (includes work and training). However, this funding was only to be made available for this proposed project
contingent upon receipt of the grant amount that NHNR has requested from Chevron for the “North Richmond Eco
Academy Project.” Subsequently, in early December 2009 Chevron announced their selected grant recipients which did
not include NHNR.
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 8 of 9
Funding allocated under this Strategy is intended to be split among various
Community-Based Projects that were selected following a proposal
solicitation and review process conducted in the Spring of 2010. The nine
selected Community-Based Projects and their respective funding amounts
recommended for approval by the City and County are listed on the
attached table which is incorporated herein by this reference.
15. North Richmond Green Community Services Programs
Fund the following North Richmond Green programs to the extent the
specific details submitted are determined to align with the purpose of the
Mitigation Fee and Expenditure Plan:
· North Richmond Little League Baseball Program (which includes cost
of registration, jerseys with customized North Richmond Green
patches, hats, pants, season kick-off event/parade, and equipment)
· North Richmond Adult Softball program (which includes cost of
registration, jerseys with customized North Richmond Green patches,
and hats)
· North Richmond Youth Eco Academy (which may include projects to
include school gardens, recycling efforts, habitat restoration,
creek/bay/ocean water quality monitoring, and
beach/creek/neighborhood clean-ups; coordination and supervision
ecological field trips; utilize rooms in Shields-Reid Community Center;
essential location for green academy; serve entire community but will
revolve services around youth ; funds may be used to support the cost
of materials, transportation, fees, etc. associated with relevant
community beautification projects such landscaping and murals.)
Strategies with funding and activities that have been carried forward from
the 2008/2009 Expenditure Plan
16A. Neighborhood Landscaping and Gardening Projects
Fund the Lots of Crops project involving the establishment of a new
community garden on a previously vacant lot that had been subject to
dumping or blight. This community garden project:
o relies on partnerships with local residents, non-profit and
community based organizations, school groups and other
community groups to start and maintain projects
o provides the community with educational/outreach opportunities,
healthy foods, and community building
16B. Servicing and Moving/Removal of Street Cans
Fund cost of collection services provided and not yet billed in late 2009
and relocation/removal of four street cans in 2010 within the Mitigation
Fee Primary
Amended 2010/2011 Expenditure Plan - North Richmond Waste & Recovery Mitigation Fee
Page 9 of 9
17A. Stipends and Mentorship Program
Fund the proposed Mentoring Program at the Young Adult Empowerment
Center to aid in efforts to combat illegal dumping and blight within the
Mitigation Fee Primary Funding Area
17G. West County Watershedz Program
Fund the cost of vegetation clearing in order to provide visibility needed
for County Flood Control District to conduct topographic surveys in
locations to be surveyed as identified by the County. Strive to hire local
youth to assist with the trimming and removal of vegetation.
17H. Wildcat and San Pablo Creek Enhancements
Topographical surveys of riparian forest and hydrologic modeling to
develop a vegetation management plan for Wildcat Creek.
STAFF COSTS
Due the staff time necessary for staffing this committee and Expenditure Plan
development, administration, oversight and implementation, $100,000 is
allocated to accommodate staff costs for both the City and County for calendar
years 2010 and 2011.
D:\Illegal Dumping\BMPC Mitigation Fee Committee\2010-2011 Exp Plan\2010-11 Amd Exp Plan for City-County
Approval.doc
2010-2011 North Richmond Mitigation Fund Program Recommended Award AllocationsOrganization Project TitleRequested AmountTotal Score (out of 9 pts)Amount Recommended NotesVerde Partnership Garden/Tides CenterVerde Elementary School Garden$14,000 93 3 3 $14,000Great program and well establishedCenter for Human DevelopmentCarbon Footprint Tree Planting and Trash Abatement Project$133,400 82 3 3 $100,000Believes organizations has ability to complete projects. Hourly stipend rate should be $10/hour consistent with prior practice and level recommended in other similar proposals. Proposals needs to be modified to ensure inclusion of incorporated and unincorporated North Richmond. Additional project details need to be worked out. Harold Beaulieu / CHDCPopsicle Project (Phase II)Tile Art & Mural Painting$38,947 83 3 2 $30,000North Richmond Mitigation Committee is familiar with the proposed projects and applicant; believes that the proposed amount of youth served is goodThe Watershed ProjectNorth Richmond Clean and Green$42,124 73 2 2 $40,000Great program and well thought out proposal.Communities United Restoring Mother Earth /Urban TilthLots of Crops $307,023 6.82 3 1.8 $100,000Proposal/application submitted prior to deadline was incomplete. Revised (completed) application/proposal submitted within a week from the deadline. Supportive of project but initial application was late.Athletes United for PeaceNorth Richmond Digital Technology Academy$47,175 63 2 1 $30,000Believes project has value; Orgainzation has completed projects in North Richmond in the past; overhead costs are too highNeighborhood House of North RichmondNorth Richmond Eco - Academy $237,050 4.51.5 2 1 $70,000Proposal/application submitted prior to deadline was incomplete. Supportive of concept, however additional details needed (including other committed funding) to determine feasibility/viability to accomplish inteneded purpose with level of funding available.Social Progress Inc.Trash Removal/Lawn Mowing/Blight Reduction$143,100 41 2 1 $8,000Significantly scale back and streamline to reduce contracting agency's cost to negotiate/oversee.Golden Gate Audubon SocietyECO - Richmond Environmental Stewardship$40,000 31 1 1 $8,000Want to localize program to Verde Elementary SchoolTotal Amount Requested/Recommended$1,002,819 $400,000Subcommittee recommended amounts based upon estimated total of $400,000 available for awards. The total amount available for awards to be recommended for consideration by the full Committee dependant upon the actual amount of unexpended funding from the 2008-2009 Expenditure Plan cycle.Subcommittee Ranking (High, Medium or Low)
2010-2011 North Richmond Mitigation Fund Program Recommended Award Allocations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
VFRVWWRQHJRWLDWHRYHUVHH*ROGHQ*DWH$XGXERQ6RFLHW\(&25LFKPRQG(QYLURQPHQWDO6WHZDUGVKLS :DQWWRORFDOL]HSURJUDPWR9HUGH(OHPHQWDU\6FKRRO7RWDO$PRXQW5HTXHVWHG5HFRPPHQGHG6XEFRPPLWWHHUHFRPPHQGHGDPRXQWVEDVHGXSRQHVWLPDWHGWRWDORIDYDLODEOHIRUDZDUGV7KHWRWDODPRXQWDYDLODEOHIRUDZDUGVWREHUHFRPPHQGHGIRUFRQVLGHUDWLRQE\WKHIXOO&RPPLWWHHGHSHQGDQWXSRQWKHDFWXDODPRXQWRIXQH[SHQGHGIXQGLQJIURPWKH([SHQGLWXUH3ODQF\FOH6XEFRPPLWWHH5DQNLQJ+LJK0HGLXPRU/RZ