HomeMy WebLinkAboutMINUTES - 06152010 - C.01RECOMMENDATION(S): APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Memorandum of Understanding with the State Route 4 Bypass Authority that outlines the roles and responsibilities for the construction and use of federal stimulus American Recovery and Reinvestment Act (ARRA) funds for the Marsh Creek Road RAC Overlay project, Brentwood area. Project No. 4660-6X4462 FISCAL IMPACT: There is no impact to the County General Fund. The project is funded with 85.3% ECCRFFA funds and 14.7% Federal funding from the American Recovery and Reinvestment Act. BACKGROUND: The County, on behalf of the State Route 4 Bypass Authority, has applied for federal stimulus (ARRA) funds for the Marsh Creek Raod RAC Overlay project. (The State Route 4 Bypass Authority does not have a master agreement with Caltrans to receive federal funds.) Caltrans has agreed to this approach but has required that the County administer the project. The State Route APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 06/15/2010 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Federal D. Glover, District V Supervisor ABSENT:Susan A. Bonilla, District IV Supervisor Contact: Nancy Wein, 925-313-2275 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: June 15, 2010 David J. Twa, County Administrator and Clerk of the Board of Supervisors By: EMY L. SHARP, Deputy cc: Mike Carlson, Nancy Wein, Chris Lau C. 1 To:Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:June 15, 2010 Contra Costa County Subject:Memorandum of Understanding for the Marsh Creek Road Rubberized Asphalt (RAC) Concrete Overlay Project, Brentwood area BACKGROUND: (CONT'D) 4 Bypass Authority will pay for 100% of all costs for the project less any ARRA funds received and will assist Public Works Department staff to administer its construction. The MOU outlines the specific duties and responsibilities of both agencies with respect to project construction and the disbursement of federal funds. The project work consists of placing a 0.15 foot overlay of Rubberized Asphalt Concrete on existing pavement, adding backing material to the existing shoulder backing to meet the new grade within the roadway limits, and restriping using the same current lane configuration of two 12 foot wide lanes and 10 foot wide shoulders with thermoplastic pavement delineations as well as a soft median barrier (rumble strips). A staging area at the northeast corner of the intersection of the Bypass Road and Marsh Creek Road that was used during the original construction will be reused during the proposed overlay project. Two way traffic will be maintained throughout construction and emergency vehicle access will be allowed at all times. CONSEQUENCE OF NEGATIVE ACTION: The project will lose federal funding if the Memorandum of Understanding is not signed. CHILDREN'S IMPACT STATEMENT: ATTACHMENTS MOU