HomeMy WebLinkAboutMINUTES - 06082010 - C.18RECOMMENDATION(S):
APPROVE the Parkway Estates Park Improvements Project and AUTHORIZE the Public
Works Director, or designee, to advertise the project [DCD-CP#10-17] Project No.:
7827-6x5402, and
FIND the project is a California Environmental Quality Act (CEQA), Class 2 Categorical
Exemption, pursuant to Section 15302 of the CEQA Guidelines, and
DIRECT the Director of Conservation and Development to file a Notice of Exemption with
the County Clerk, and
AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to the
Department of Conservation and Development for processing, and a $50 fee to the County
Clerk for filing the Notice of Exemption.
FISCAL IMPACT:
There is no impact to the County General Fund. This project is funded by Redevelopment
APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
Action of Board On: 06/08/2010 APPROVED AS RECOMMENDED OTHER
Clerks Notes:
VOTE OF SUPERVISORS
AYE:John Gioia, District I
Supervisor
Gayle B. Uilkema, District II
Supervisor
Mary N. Piepho, District III
Supervisor
Susan A. Bonilla, District IV
Supervisor
Federal D. Glover, District V
Supervisor
Contact: Kimani Birden -
313-2190
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board
of Supervisors on the date shown.
ATTESTED: June 8, 2010
David J. Twa, County Administrator and Clerk of the Board of Supervisors
By: EMY L. SHARP, Deputy
cc: D. Favero, Special Districts,, V. Zayas, Special Districts,
C.18
To:Board of Supervisors
From:Julia R. Bueren, Public Works Director/Chief Engineer
Date:June 8, 2010
Contra
Costa
County
Subject:Approve the Parkway Estates Park Improvements; AUTHORIZE the Public Works Director, or designee, to
advertise the project.
Agency Funds (100%).
BACKGROUND:
The purpose of this project is to provide the local community with an enhanced
recreational facility. The current recreational facility; Parkway Estates Park, is primarily
composed of turf areas, landscaping, pedestrian path, and a play structure on an
approximately 1,000 square foot lot. The park was built in 1998 and has gone without
improvements, except for vandalism repairs, since its creation. The County plans to
upgrade the park’s current facilities with negligible expansion, by improving and
expanding existing landscaping and repairing the pedestrian path along the north side of
the park. In addition, the County will install benches, a skateboard grind rail, and clean as
well as paint the play structure. As funding becomes available the play structure and
playground surfacing (rubber matting) will be replaced.
In order to minimize damage to any nearby trees, any roots exposed during excavation
will be cut cleanly and tree branches will be trimmed. No tree removal will be necessary.
Real property transactions and utility relocations may be necessary in support of this
project. At least one lane of traffic will be open at all times during construction activities.
CONSEQUENCE OF NEGATIVE ACTION:
Delay in approving the project will result in a delay of design and construction and may
jeopardize funding.