HomeMy WebLinkAboutRESOLUTIONS - 12172019 - 2019/664 (2)LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 1 of 31
I. BUILDING FEES
S-001 Permit Processing and Issuance Program
A. Plan Review
Based on Improvement Value:1
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$5,000,000
$49 plus $8.94 for each additional $1,000 or fraction
thereof above $2,000
$254 plus $6.44 for each additional $1,000 or fraction
thereof above $25,000
$415 plus $4.47 for each additional $1,000 or fraction
thereof above $50,000
$639 plus $5.30 for each additional $1,000 or fraction
thereof above $100,000
$2,758 plus $5.52 for each additional $1,000 or fraction
thereof above $500,000
$5,516 plus $3.79 for each additional $1,000 or fraction
thereof above $1,000,000
$20,685 plus $5.52 for each additional $1,000 or fraction
thereof above $5,000,000
B. Permit Review and Processing
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$19 plus $3.44 for each additional $1,000 or fraction
thereof above $2,000
$98 plus $2.48 for each additional $1,000 or fraction
thereof above $25,000
$160 plus $1.72 for each additional $1,000 or fraction
thereof above $50,000
$246 plus $0.59 for each additional $1,000 or fraction
thereof above $100,000
$483 plus $0.69 for each additional $1,000 or fraction
thereof above $500,000
$827 plus $0.44 for each additional $1,000 or fraction
thereof above $1,000,000
1 See Building Valuation Data and Building Valuation Data Supplement at end of Building Fees
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 2 of 31
$5,000,000
$2,586 plus $0.69 for each additional $1,000 or fraction
thereof above $5,000,000
C. Additional Processing/Plan Check:
Fees for such reviews shall be at the hourly rates in effect
at the time of plan review.
Applicable when additional plan review is required due to:
1) incomplete or unacceptable follow-through by applicant on deficiencies found in the initial
plan review;
2) significant revisions submitted after plan review is well underway; or
3) deferred submittals and revisions submitted during construction to reflect field changes.
D. Refinery and Chemical Plant Fee
1. Yearly Building/
Grading Permit
$13,790 annual fee.
2. Yearly Electrical Permit $13,790 annual fee.
S-002 Construction Inspection Program
A. Building Inspection
1. Building Permit
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$75 plus $13.75 for each additional $1,000 or fraction
thereof above $2,000
$391 plus $9.90 for each additional $1,000 or fraction
thereof above $25,000
$639 plus $6.88 for each additional $1,000 or fraction
thereof above $50,000
$983 plus $6.16 for each additional $1,000 or fraction
thereof above $100,000
$3,448 plus $3.45 for each additional $1,000 or fraction
thereof above $500,000
$5,171 plus $0.86 for each additional $1,000 or fraction
thereof above $1,000,000
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 3 of 31
$5,000,000
$8,619 plus $1.72 for each additional $1,000 or fraction
thereof above $5,000,000
2. Energy Compliance
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$5,000,000
$31 plus $5.67 for each additional $1,000 or fraction
thereof above $2,000
$161 plus $4.08 for each additional $1,000 or fraction
thereof above $25,000
$263 plus $2.84 for each additional $1,000 or fraction
thereof above $50,000
$405 plus $1.57 for each additional $1,000 or fraction
thereof above $100,000
$1,034 plus $1.38 for each additional $1,000 or fraction
thereof above $500,000
$1,724 plus $0.65 for each additional $1,000 or fraction
thereof above $1,000,000
$4,309 plus $0.86 for each additional $1,000 or fraction
thereof above $5,000,000
3. Access Compliance
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$31 plus $5.67 for each additional $1,000 or fraction
thereof above $2,000
$161 plus $4.08 for each additional $1,000 or fraction
thereof above $25,000
$263 plus $2.84 for each additional $1,000 or fraction
thereof above $50,000
$405 plus $4.16 for each additional $1,000 or fraction
thereof above $100,000
$2,069 plus $1.38 for each additional $1,000 or fraction
thereof above $500,000
$2,758 plus $0.86 for each additional $1,000 or fraction
thereof above $1,000,000
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 4 of 31
$5,000,000 $6,206 plus $1.24 for each additional $1,000 or fraction
thereof above $5,000,000
B. Earthquake Fee Residential: $13 per each $100,000 of building valuation.
Commercial: $20 per each $100,000 of building valuation.
C. Electrical Inspection Fees
1. New Dwelling
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$75
$75 plus $0.83 for each additional $1,000 or fraction
thereof above $25,000
$96 plus $1.03 for each additional $1,000 or fraction
thereof above $50,000
$147 plus $0.49 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
2. Addition or Alteration to
Dwelling Unit
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$75 plus $0.14 for each additional $1,000 or fraction
thereof above $2,000
$78 plus $1.98 for each additional $1,000 or fraction
thereof above $25,000
$128 plus $1.38 for each additional $1,000 or fraction
thereof above $50,000
$197 plus $0.37 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 5 of 31
3. New Commercial Building
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$75 plus $0.99 for each additional $1,000 or fraction
thereof above $2,000
$98 plus $2.48 for each additional $1,000 or fraction
thereof above $25,000
$160 plus $1.72 for each additional $1,000 or fraction
thereof above $50,000
$246 plus $0.25 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
4. Shell Building
Based on Improvement Value:
Up to $100,000
$100,000 +
$500,000
$1,000,000
$75
$75 plus $0.67 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
5. Commercial Alterations &
Tenant Improvements
Based on Improvement Value:
Up to $25,000
$25,000 +
$50,000
$100,000
$75
$75 plus $2.11 for each additional $1,000 or fraction
thereof above $25,000
$128 plus $1.38 for each additional $1,000 or fraction
thereof above $50,000
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 6 of 31
$500,000
$1,000,000
$197 plus $0.37 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
6. Electrical Permit (Other) $75.00 minimum.
An electrical permit is required for all electrical work
regulated by the Electrical Code. Fees for work not included
in Items 1 - 5 above shall be calculated utilizing the fee table
shown in S-002, A. Building Inspection, 1. Building Permit.
Where such Electrical work is performed in conjunction
with a building permit, the fee may be added to that permit,
and a separate electrical permit is not required.
D. Mechanical Inspection Fees
1. New Dwelling
Based on Improvement Value:
Up to $50,000
$50,000+
$100,000
$500,000
$1,000,000
$75
$75 plus $0.47 for each additional $1,000 or fraction
thereof above $50,000
$98 plus $0.62 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
2. Addition / Alteration to
Dwelling Unit
Based on Improvement Value:
Up to $25,000
$25,000+
$75
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 7 of 31
$50,000
$100,000
$500,000
$1,000,000
$75 plus $0.83 for each additional $1,000 or fraction
thereof above $25,000
$96 plus $1.03 for each additional $1,000 or fraction
thereof above $50,000
$147 plus $0.49 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
3. New Commercial Building
Based on Improvement Value:
Up to $25,000
$25,000+
$50,000
$100,000
$500,000
$1,000,000
$75
$75 plus $0.83 for each additional $1,000 or fraction
thereof above $25,000
$96 plus $1.03 for each additional $1,000 or fraction
thereof above $50,000
$147 plus $0.49 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
4. Shell Building
Based on Improvement Value:
Up to $100,000
$100,000 +
$500,000
$1,000,000
$75
$75 plus $0.67 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 8 of 31
5. Commercial Alterations &
Tenant Improvements
Based on Improvement Value:
Up to $50,000
$50,000+
$100,000
$500,000
$1,000,000
$75
$75 plus $0.47 for each additional $1,000 or fraction
thereof above $50,000
$98 plus $0.62 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
6. Mechanical Permit (Other) $75.00 minimum.
A mechanical permit is required for all mechanical work
regulated by the Mechanical Code. Fees for work not
included in Items 1 - 5 above shall be calculated utilizing
the fee table shown in S-002, A. Building Inspection, 1.
Building Permit. Where such Mechanical work is
performed in conjunction with a building permit, the fee
may be added to that permit, and a separate mechanical
permit is not required.
E. Plumbing Inspection Fees
1. New Dwelling
Based on Improvement Value:
Up to $25,000
$25,000+
$50,000
$100,000
$500,000
$75
$75 plus $0.83 for each additional $1,000 or fraction
thereof above $25,000
$96 plus $1.03 for each additional $1,000 or fraction
thereof above $50,000
$147 plus $0.49 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 9 of 31
$1,000,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
2. Addition / Alteration to
Dwelling Unit
Based on Improvement Value:
Up to $2,000
$25,000
$50,000
$100,000
$500,000
$1,000,000
$75 plus $0.14 for each additional $1,000 or fraction
thereof above $2,000
$78 plus $1.98 for each additional $1,000 or fraction
thereof above $25,000
$128 plus $1.38 for each additional $1,000 or fraction
thereof above $50,000
$197 plus $0.37 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
3. New Commercial Building
Based on Improvement Value:
Up to $25,000
$25,000+
$50,000
$100,000
$500,000
$1,000,000
$75
$75 plus $2.11 for each additional $1,000 or fraction
thereof above $25,000
$128 plus $1.38 for each additional $1,000 or fraction
thereof above $50,000
$197 plus $0.37 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
4. Shell Building
Based on Improvement Value:
Up to $100,000
$75
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 10 of 31
$100,000 +
$500,000
$1,000,000
$75 plus $0.67 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
5. Commercial Alterations &
Tenant Improvements
Based on Improvement Value:
Up to $25,000
$25,000 +
$50,000
$100,000
$500,000
$1,000,000
$75
$75 plus $0.83 for each additional $1,000 or fraction
thereof above $25,000
$96 plus $1.03 for each additional $1,000 or fraction
thereof above $50,000
$147 plus $0.49 for each additional $1,000 or fraction
thereof above $100,000
$345 plus $0.23 for each additional $1,000 or fraction
thereof above $500,000
$460 plus $0.46 for each additional $1,000 or fraction
thereof above $1,000,000
6. Plumbing Permit (Other) $75.00 minimum.
A plumbing permit is required for all plumbing work
regulated by the Plumbing Code. Fees for work not
included in Items 1 - 5 above shall be calculated utilizing
the fee table shown in S-002, A. Building Inspection, 1.
Building Permit. Where such Plumbing work is performed
in conjunction with a building permit, the fee may be
added to that permit, and a separate plumbing permit is not
required.
F. Miscellaneous Inspection Fees
1. Reinspections $150 per inspection trip
Situations where reinspection fees shall be applicable include the following:
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 11 of 31
a. When the work for a called inspection is not ready or not accessible to the inspector.
b. When extra inspections are necessary due to deficient or defective work through fault or
error of the owner or contractor. One such extra inspection will be made for each phase
of work that requires inspection (i.e. foundation, rough electric, etc.) under the regular
fees prescribed in this section. A reinspection fee shall be charged for each additional
visit or inspection thereafter.
c. When more than one inspection is made on a phase of work (i.e., "partial inspections")
that normally is inspected in one trip.
2. Owner-requested inspection
of an existing building.
The fee shall be based on an hourly rate @ $150
per hour, with 1 hour minimum
3. Investigation of work without permit. When a Notice is issued for work being performed
without permits or performed beyond the scope of existing permits, a special investigation and
inspection shall be made before permits may be issued for such work. An investigation fee
shall be charged equal to two times the amount of all permit fees required by this ordinance,
with a minimum of $300. The fee is additive to the permit fees. This provision shall not apply
to emergency work when it can be proven to the satisfaction of the Director of Building
Inspection that such work was urgently necessary, that it was not practical to obtain a permit
before the work was commenced, and that a permit was applied for as soon as practical.
4. Abatement of Code Violations.
Building: Abatement costs: When a Notice is issued as a result of an inspection of a property, and
compliance is required to correct violations found, or permits are required to legalize work
previously performed without building permits, a code enforcement cost shall be charged
equal to two times the amount of all permit fees required by this ordinance, with a
minimum of $300. Where repeat visits are required before the owner complies or obtains
the required permits, a reinspection cost of $150 per trip shall be charged after the second
trip. Where repeat visits are necessary after compliance or permit issuance to enforce the
abatement work, a reinspection cost of $150 per trip shall be charged after the second trip.
The costs in this section are additive to the permit fees.
Zoning: When Code Enforcement activities are required as a result of an inspection of a property
and compliance is required to correct violations found, or permits are required for
compliance, a code enforcement cost shall be charged equal to the amount of all permit
fees required by this ordinance, with a minimum of $300. Where repeat visits are required
before the owner complies or obtains the required permits, a reinspection cost of $150 per
trip shall be charged. Where repeat visits are necessary after compliance or permit issuance
to enforce the abatement work, a reinspection cost of $150 per trip shall be charged. The
costs in this section are additive to the permit fees.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 12 of 31
5. Renewal fee for an expired permit:
For Final Inspection: $250 fee.
For permits expired less than 365 days the permit fee will be 50% of the original building permit
fee.
For permits expired 365 days or more the permit fee will be 100% of the original building
permit fee.
6. After Hours Inspection Services: Hourly fee with a minimum of 3 hours. Initial fee $600.
7. Residential solar energy systems – roof mount and ground mount:
i) Photovoltaic systems:
a) ≤15 kW:
Building Permit/inspection: $86 per permit
Plan Check: $86 per permit
Electrical Review: $100 per permit
b) >15 kW:
Building Permit/inspection/Plan
Check/Electrical Review: plus $15 per kW above 15 kW
ii) Thermal systems:
a) ≤10 kWth:
Building Permit/inspection: $86 per permit
Plan Check: $86 per permit
Plumbing Review: $86 per permit
b) >10 kWth:
Building Permit/inspection/ Plan
Check/Plumbing Review: plus $15 per kWth above 10 kWth
8. Commercial solar energy systems – roof mount and ground mount:
i) Photovoltaic systems:
a) ≤50 kW:
Building Permit/inspection: $172 per permit
Plan Check: $172 per permit
Electrical Review: $172 per permit
b) >50 kW but ≤250 kW:
Building Permit/inspection/Plan
Check/Electrical Review: plus $7 per kW above 50 kW
c) >250 kW:
Building Permit/inspection/Plan
Check/Electrical Review: plus $5 per kW above 250 kW
ii) Thermal systems:
a) ≤30 kWth:
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 13 of 31
Building Permit/inspection: $172 per permit
Plan Check: $172 per permit
Plumbing Review: $172 per permit
b) >30 kWth but ≤260 kWth:
Building Permit/inspection/Plan
Check/Plumbing Review: plus $7 per kWth above 30 kWth
c) >260 kWth:
Building Permit/inspection/Plan
Check/Plumbing Review: plus $5 per kWth above 260 kWth
9. Debris Recovery
a) Residential
Up to $1 Million $172 per permit
$1 Million or greater $345 per permit
b) Commercial
Up to $1 Million $345 per permit
$1 Million – $3 Million $517 per permit
$3 Million or greater $690 per permit
10. Canopy/Awnings
a) Building Permit / Inspection, <100 s.f.: $116 per permit
b) Plan Check, <100 s.f.: $76 per permit
c) Building Permit / Inspection, 101 – 400 s.f.: $258 per permit
d) Plan Check, 101 – 400 s.f.: $178 per permit
e) Building Permit / Inspection, >401 s.f.: $345 per permit
f) Plan Check, >401 s.f.: $258 per permit
11. Mobile Homes
a) Building Permit / Inspection.: $241 per permit
b) Plan Check: $211 per permit
12. Commercial Coaches
a) Building Permit / Inspection.: $241 per permit
b) Plan Check: $211 per permit
13. Fences Greater than 7ft
a) Building Permit / Inspection, chain-link or wood: $116 per permit
b) Plan Check, chain-link or wood: $76 per permit
c) Building Permit / Inspection, other materials: $172 per permit
d) Plan Check, other materials: $345 per permit
14. Re-Roofs - Residential
a) Building Permit / Inspection.: $150 per permit
b) Processing: $38 per permit
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 14 of 31
15. Re-Roofs - Commercial
a) Building Permit / Inspection.: $150 per permit
b) Processing: $75 per permit
16. Energy Code Compliance Review for Miscellaneous Permits
a) Residential: $172 per permit
b) Commercial: $345 per permit
S-003 Grading Plan Check/Inspection
1. Improvement Value:
Up to $20,000
$20,000
$100,000
$1,000,000
2. Additional fee if work goes over
1 year (per year):
Improvement Value:
Up to $20,000
$20,000
$100,000
$1,000,000
Fee:
$300
$690 plus $53.88 for each additional $1,000 or fraction
thereof above $20,000
$5,000 plus $32.22 for each additional $1,000 or fraction
thereof above $100,000
$34,000 plus $34.00 for each additional $1,000 or
fraction thereof above $1,000,000
Fee:
$300
$690 plus $45.13 for each additional $1,000 or fraction
thereof above $20,000
$4,300 plus $17.44 for each additional $1,000 or fraction
thereof above $100,000
$20,000 plus $20.00 for each additional $1,000 or
fraction thereof above $1,000,000
S-004 Building Demolition Review $172 permit for single structure. $50 for each additional
structure.
S-006 Drainage Plan Review and Inspection
1. <2,500 s.f. New Impervious
Surface Area
2. >2,500 s.f. New Impervious
Surface Area
3. >10,000 s.f. New Impervious
Surface Area
$250 per permit
$500 per permit
$1,000 per permit.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 15 of 31
S-008 R-Form Complaint Investigation Costs are offset by a portion of the 40% surcharge
collected on building permit fees. To the extent surcharge
revenues are insufficient, costs are absorbed by the
operations reserve.
S-009 R-Form Site Investigation $300 per investigation plus County's fully burdened
hourly rates for travel time outside the County.
S-010 County Code Compliance $300 per report.
S-012 Subpoena Services Evidence reproduction: $60 per hour, $15 minimum
Witness summons: Time and materials plus mileage,
$150 deposit. Fee set per Administrative Bulletin 133.3.
S-020, S-
052
Land Development Surcharge 40% surcharge applies on all building permit fees.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 16 of 31
BUILDING VALUATION DATA
Valuation. The determination of value or valuation under any provisions of the County Building Code shall be made
by the Director of Conservation and Development. The total valuation to be used with the Fee Schedule shall be
determined using the Building Valuation Data contained in the Building Safety Journal, publi shed by the
International Code Council (ICC) or in the Successor publication by the ICC or its Successor organization. Work
not listed in the Building Valuation Data shall be valued per the Building Valuation Data Supplement below, which
may be modified administratively by the Director of Conservation and Development to clarify or cover additional
types of work and situations.
The valuation to be used in computing the building permit fee shall be the total valuation of all construction work
for which the permit is issued, as well as all finish work, painting, roofing, mechanical, electrical, plumbing, heating,
air conditioning, elevators, fire extinguishing systems, and any other permanently installed equipment. For industrial
facilities, the value of process equipment and heavy machinery supported by the structure or by its own foundation
shall be included. Contractor overhead and profit shall be included.
The valuation of grading, retaining walls, paving and other site work, and any demolition work, shall b e included
unless such work was included in other permits issued by the Department of Conservation and Development.
The valuation data is used to establish consistent criteria for calculating permit fees, and the calculated total
valuation does not necessarily reflect actual costs. The County Assessor does not rely on this cost, but performs
independent assessments of the permitted work.
BUILDING VALUATION DATA SUPPLEMENT
The work listed in this supplement shall be valued based on the gross square footage of the work, or where noted,
as a lump sum. Where actual costs are higher, those costs shall be used for the valuation.
$/Sq.Ft.
1. Residential addition
-Good Quality
129.48
2. Residential remodel (to existing floor areas)
If bathrooms are added or remodeled, for each one, add lump sum of:
If kitchen is remodeled, add lump sum of:
64.75
6829.38
20488.15
3. Residential use conversion from garage, basement or unfinished area
-Good Quality
If bathrooms or kitchen added, include lump sum(s) as for residential remodel.
77.18
4. Sun room with >60% glazing, cabanas, other similar structures
If conditioned space and integrated with main structure, add:
50.68
79.63
5. Patio cover (includes pre-fab types, usually with ICBO research listing)
If enclosed with walls or glazing, add:
22.23
43.44
6. Deck 21.72
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 17 of 31
7. Retaining wall (projected sq.ft. areas of wall and footing)
-concrete or CMU
-wood
14.48
7.25
8. Freestanding fence (projected area)
-concrete or CMU
-wood, chain-link
7.25
4.35
9. Swimming pool, lump sum of: 34146.91
10. Remodel or tenant improvement work in commercial buildings
Type I and II Construction
Type III, IV and V Construction
If restrooms are added or relocated - add lump sum for each:
If commercial kitchen is added - add lump sum of:
43.44
36.20
13658.77
40976.29
11. Reroofing
-Built up, composition shingles, foam
-Treated wood, metal and proprietary products
-Tile - masonry, clay, concrete
4.35
5.08
6.51
12. Mobile home on permanent foundation (based on square footage of mobile home) 14.48
13. Moved building (for existing s.f. any added s.f. shall be at "average quality" valuation) 43.44
14. Agricultural/husbandry buildings
-Pole construction
-Wood construction
-Steel construction
13.97
21.70
24.89
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 18 of 31
II. PLANNING FEES
S-013A
S-013B
Certificate of Compliance Review
Determination of Legal Lot
$3,800 minimum deposit, time and materials.
$2,000 minimum deposit, time and materials.
S-014,
015, 016
Development Plan Review
Residential
Substantial
Non-Substantial
Administrative
Multiple-family/ Commercial/
Office/ Industrial
$4,500 minimum deposit, time and materials.
$1,500 minimum deposit, time and materials.
$5,000 minimum deposit, time and materials.
S-017 Time Extension (Administrative) $350 fee.
S-018 Time Extension (Public Hearing) $750 fee.
S-019 General Plan Amendment Review $5,200 minimum deposit, time and materials.
S-019A Specific Plan Amendment $5,200 minimum deposit, time and materials.
S-019B General Plan Amendment Feasibility
Request
$750 fee credited towards subsequent General Plan
Amendment application.
S-021 Land Use Permit (Quarry) $6,500 minimum deposit, time and materials.
S-022
S-023
Land Use Permit
(Quarry Reclamation Plan)
Land Use Permit
(Caretaker Mobile Home)
$3,800 minimum deposit plus $75 per acre.
Time and materials.
$2,000 minimum deposit. Time and materials.
S-024 Land Use Permit
(Family Member Mobile Home)
$2,000 minimum deposit. Time and materials.
$150 with proof of financial hardship of property owner.
S-026 Land Use Permit (Home Occupation) $2,000 minimum deposit. Time and materials.
S-027A Accessory Dwelling Unit Permit $2,000 minimum deposit. Time and materials.
S-028A Land Use Permit
(Development Plan
Combination)
$6,000 minimum deposit plus Development Plan deposit.
Time and materials.
S-028B Land Use Permit (Development Plan
Combination; Minor
Revisions/Amendments)
$2,300 minimum deposit. Time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 19 of 31
S-025,
027,
027B, 029
Land Use Permit (Other) $5,500 minimum deposit. Time and materials.
S-029A Land Use Permit
(Solid Waste Disposal Review)
$42,000 minimum deposit. Time and materials.
S-030 Land Use Permit
(Administrative Permit - Gas
Well)
$1,500 minimum deposit. Time and materials.
S-031 Land Use Permit
(Gas Well Ordinance)
$4,000 minimum deposit. Time and materials.
S-032 Lot Line Adjustment Review $700
S-033 Tentative Subdivision Map Review -
Major
$10,000 minimum deposit. Time and materials.
S-033A Development Agreement $10,000 minimum deposit. Time and materials.
S-034,
034A
Tentative Subdivision Map Review –
Minor/ Reversion to Acreage
$7,500 minimum deposit. Time and materials.
S-035 Condo Conversion Tentative Map
$10,000 minimum deposit. Time and materials.
S-036 Lot Split $2,250 minimum deposit. Time and materials.
S-036A
S-036B
S-037
S-038
S-039A
Undersized Lot Review
Undersized Lot Review plus Alteration
of Protected Tree
Planned Unit Development Rezoning
Review - Residential
Planned Unit Development Rezoning
Review – Commercial/Industrial
Planned Unit Development Rezoning
Review – Review/New
$300 filing fee.
If public hearing is requested, $3,000 minimum deposit
in addition to review fee. Time and materials.
$3,000 minimum deposit. Time and materials.
$7,000 minimum deposit. Time and materials.
$7,000 minimum deposit. Time and materials.
$5,000 minimum deposit. Time and materials.
S-039B Planned Unit Development
Final Development Plan Review/Non-
Substantial Modification
$2,000 minimum deposit. Time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 20 of 31
S-039C Planned Unit Development
Final Development Plan Review/
Substantial Modification
$4,500 minimum deposit. Time and materials.
S-040 Planned Unit Development
Tentative Subdivision Map Review
$5,000 minimum deposit. Time and materials.
S-041 Rezoning Review -
Commercial/Industrial
$7,000 minimum deposit. Time and materials.
S-042 Rezoning Review - Other $7,000 minimum deposit. Time and materials.
S-043 Police Services District Formation $1,500 minimum deposit. Time and materials.
S-044 Zone Variance $3,250 minimum deposit. Time and materials.
S-045 Sign Review Minor modification: $750 minimum deposit. Time and
materials.
Public hearing: Additional $2,000 deposit towards time
and materials.
S-045A Address Change/Private Road
Name Change
$500 fee plus $100 per address over 10.
S-046
S-046B
S-046C
S-046D
Request for Determination
Historic Nomination
Major Historic Review
Minor Historic Review
$900 minimum deposit. Time and materials.
$500 minimum deposit. Time and materials.
$1,000 minimum deposit. Time and materials.
$500 minimum deposit. Time and materials.
S-046E Use Verification (administrative) $200 filing fee.
S-047A,
S-047B,
S-047C,
S-047D
Zoning Administrator Appeal $250 filing fee.
S-047E Planning Commission Agenda
Mailing Service
$25 fee for Single Agenda. $5 fee for each additional
agenda.
S-048 Fish and Game - Posting Fee
Administrative Fee
$50 fee collected for an external agency.
$25 fee collected for an external agency.
S-048A,
S-048B,
S-048C,
S-048D
Appeal to the Board
$250 filing fee.
S-049 Reconsideration Review $250 filing fee.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 21 of 31
S-049A Condition of Approval - Modification
Review
$1,500 filing fee.
Time and materials with $2,500 deposit if modification
goes to public hearing.
S-050 Agricultural Preserve Rezoning Review $2,500 minimum deposit. Time and materials.
S-050A Agricultural Preserve Contract $2,000 deposit. Time and materials.
S-051 Agricultural Preserve
Cancellation Review
$5,000 minimum deposit. Time and materials.
S-051A Pre-application Review
Minor Subdivision, Minor Land
Use Permit, Development Permit
(not more than one building)
Major Subdivision
Major Residential, Commercial or
Industrial Development (more than
one building)
$2,000 fee. Additional deposit required for future
applications.
$2,000 fee. Additional deposit required for future
applications.
$2,000 fee. Additional deposit required for future
applications.
S-051B Agricultural Preserve
Non-Renewal Notice
$300 minimum deposit. Time and materials.
S-051C Annual Review of Quarry Reclamation $2,000 filing fee.
S-051D Permit for Alteration of Protected Trees $750 minimum deposit. Time and materials.
S-051F Heritage Tree (appeal) $500 minimum deposit plus time and materials.
S-051G Heritage Tree (nomination) $500 fee per tree. (per application)
S-051H Heritage Tree (removal permit) $3,000 minimum deposit plus time and materials.
S-051J Heritage Tree (encroachment permit) $1,000 minimum deposit plus time and materials.
S-053 Mitigation/ Condition of Approval
Compliance Monitoring
$2,000 minimum deposit plus time and materials.
S-056 Hazardous Waste Application Review
Determination
Monitoring 86/100
Mitigation Monitoring
(non 86/100)
$2,000 minimum deposit plus time and materials.
No Charge.
No Charge
S-057 Environmental Impact Review Contract amount plus 25% administrative surcharge.
Time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 22 of 31
S-060 Records Information Research Retrieval/research fee: $193 per hour or fraction thereof.
$15 minimum. Photocopy charges at published rates.
Documents requested to be certified have an additional
charge:
First page: $4.50.
Add'l pages: $1.00 each.
Contacting Licensed Professional for Records Release:
$48
S-060A Geologic Review $3,600 minimum deposit. Time and materials.
S-060B Landscaping and Tree Protection
Agreement
Time and materials charged against $200 minimum
initial deposit.
S-060C COA Compliance Check for
Building Permit Issuance
$1,500 minimum deposit. Time and materials.
S-060D Liquor License Site Determination $600 filing fee.
S-060E Gun Ordinance Annual License $250 filing fee.
S-060F Deemed Approved Annual Fee $400 yearly fee per ABC license.
S-060G Subpoena Services Evidence reproduction: $60 per hour, $15 minimum.
Witness summons: Time and materials plus mileage,
$150 deposit. Fee set per Administrative Bulletin 133.3.
S-060H Temporary Events $500 deposit – Time and materials - $2,500 cap.
S-060I Home Occupation Permit (Admin.) $150 filing fee.
S-060J Meteorological Tower Permit (Admin.) $1,000 minimum deposit plus time and materials.
S-060K Wireless Facility Access Permit $4,000 minimum deposit plus time and materials.
S-060L Wireless Facility Minor Alteration
Permit
$2,000 minimum deposit plus time and materials.
S-060M Wireless Facility Collocation Permit $2,000 minimum deposit plus time and materials.
S-060N Cannabis Letter of Intent Review Fee $500 fee.
S-060P
S-060Z
Cannabis Proposal Review Fee
Planning Consideration
$2,500 fee.
$500 deposit, plus time and materials
S-065 Child Care Application Review $1,500 minimum deposit. Time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 23 of 31
S-066A Late Filing of Development Permit
Application
Nonrefundable penalty equal to 50% of application fee or
deposit amount.
S-066B Special Technical Studies and/or Legal
Counsel
Any project requiring special technical studies not listed
above and/or special legal counsel shall pay costs
directly in addition to County administrative and review
fees
FEES FOR NORTH RICHMOND PLANNED UNIT DISTRICT AREA
S-NR01 Administrative Permits $1,000 deposit, plus time and materials.
S-NR02 Land Use Permit – Automotive Uses $3,000 deposit, plus time and materials.
S-NR03 Land Use Permit $2,000 deposit, plus time and materials.
S-NR04 Development Permit $2,000 deposit, plus time and materials.
S-NR05 Lot Line Adjustment $500 fee per project.
S-NR06 Home Occupation $150 filing fee.
FEES FOR RODEO PLANNED UNIT DISTRICT AREA
S-RD01 Administrative Permits $1,000 deposit, plus time and materials.
S-RD02 Land Use Permit – Automotive Uses $3,000 deposit, plus time and materials.
S-RD03 Land Use Permit $2,000 deposit, plus time and materials.
S-RD04 Development Permit $2,000 deposit, plus time and materials.
S-RD05 Lot Line Adjustment $500 fee per project.
S-RD06 Home Occupation $150 filing fee.
FEES FOR BAY POINT PLANNED UNIT DISTRICT AREA
S-BP01 Administrative Permits $1,000 deposit, plus time and materials.
S-BP02 Land Use Permit - Automotive Uses $3,000 deposit, plus time and materials.
S-BP03 Land Use Permit $2,000 deposit, plus time and materials.
S-BP04 Development Permit $2,000 deposit, plus time and materials.
S-BP05 Lot Line Adjustment $500 fee per project.
S-BP07 Home Occupation $150 filing fee.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 24 of 31
FEES FOR MONTALVIN MANOR PLANNED UNIT DISTRICT AREA
S-MM01 Administrative Permits $1,000 deposit, plus time and materials.
S-MM02 Land Use Permit – Automotive Uses $3,000 deposit, plus time and materials.
S-MM03 Land Use Permit $2,000 deposit, plus time and materials.
S-MM04 Development Permit $2,000 deposit, plus time and materials.
S-MM05 Lot Line Adjustment $500 fee per project.
S-MM07 Home Occupation $150 filing fee.
FEES FOR EL SOBRANTE PLANNED UNIT DISTRICT AREA
S-ES01 Administrative Permits $1,000 deposit, plus time and materials.
AFFORDABLE HOUSING REFINANCING PROCESS FEES
S-HM01 Multi-Family Affordable Housing
Refinancing Fee
$1,000 deposit plus time and materials.
S-HS01 Single-Family Affordable Housing
Refinancing Fee
$350 deposit plus time and materials.
S-MCC01 Mortgage Credit Certificate Insurance $300 deposit plus time and materials.
S-RMCC1 Reissued Mortgage Credit Certificate $300 deposit plus time and materials.
S-MCC02 Replacement lost mortgage credit and
reissued mortgage credit certificate
$100 deposit plus time and materials.
S-MCC03 MCC Lender Participation $400 deposit plus time and materials.
S-MCC04 MCC Lender Participation
Annual Renewal
$200 deposit plus time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 25 of 31
IN-LIEU FEES FOR INCLUSIONARY HOUSING ORDINANCE – APPLIES TO PROJECTS WITH 5
THROUGH 125 UNITS ONLY. FEES ARE NOT ALLOWED ON PROJECTS WITH MORE THAN 125
UNITS EXCEPT FOR FRACTIONAL UNITS
Fees are one option for compliance. See Ordinance for requirements and options for any project of five or more
units. Fees may be paid on a fraction of a unit if the calculation of the required number of inclusionary units in a
project results in a fraction of a unit.
Developments of 5 or more units must provide 15% of the units as affordable.
For-sale developments must have 80% of the inclusionary units (12% of total units) as affordable to moderate
income households and 20% of the inclusionary units (3% of total units) as affordable to lower income households.
Rental developments must have 80% of the inclusionary units (12% of total units) as affordable to lower income
households and 20% of the inclusionary units (3% of total units) as affordable to very-low income households.
Refer to Ordinance for income definitions.
Fee amounts are based on the formula in Section 822.4404(b) of the ordinance.
S-IH1 FOR SALE HOUSING IN-LIEU FEE $6,600.06 per market rate unit.
Fee equals 12% of total number of units in the
development times $0 plus 3% of total number of
units in the development times $220,002; i.e.,
(0.12 x total units) x ($0) + (0.03 x total units) x
($220,002).
S-IH2 RENTAL HOUSING IN-LIEU FEE $24,200.55 per market rate unit.
Fee equals 12% of total number of units in the
development times $130,350 plus 3% of total
number of units in the development times $285,285;
i.e., [(0.12 x total units) x ($2,376) + (0.03 x total
units) x ($5,184)]*(55 years).
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 26 of 31
III. LAND DEVELOPMENT (ENGINEERING) FEES
S-068 Final Map Check (Major) Deposit of $7,000. Time and materials.
S-069 Parcel Map Check Deposit of $3,000. Time and materials.
S-070 Record of Survey Check The fee is actual time at the County's fully burdened
hourly rates charged against an initial deposit of
$700, and additional deposits as necessary. The
minimum fee is $200.
S-072 Public Improvement Plan Check
(Major)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$10,000
$15,000
$20,000
Time and materials.
S-073 Public Improvement Plan Check
(Minor)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$10,000
$15,000
$20,000
Time and materials.
S-074A Public Improvement Plan Check
(LUP)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$10,000
$15,000
$20,000
Time and materials.
S-075 Public Improvement Plan Check
(Development Plan)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$10,000
$15,000
$20,000
Time and materials.
S-076 Drainage Review
(No Improvement Plan)
$1,000 deposit. Time and materials.
S-076A Condition of Approval Compliance Check (No
Improvement Plan)
$2,000 deposit. Time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 27 of 31
S-076B Improvement Agreement Extension $1,000 if documents signed and submitted 21 days
before agreement expires, $2,000 thereafter.
S-077 Public Improvement Inspection
(Major)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$5,000
$10,000
$20,000
Time and materials.
S-078 Public Improvement Inspection
(Minor)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$5,000
$10,000
$20,000
Time and materials.
S-079 Public Improvement Inspection
(Land Use Permit)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$5,000
$10,000
$20,000
Time and materials.
S-080A Public Improvement Inspection
(Development Plan)
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$5,000
$10,000
$20,000
Time and materials.
S-081C Public Improvement Plan Review -
Landscaping
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$10,000
$15,000
$20,000
Time and materials.
S-081D Subdivision Monument Check 1-6 monuments $1,400
7 or more monuments (per monument) $235
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 28 of 31
S-081E Application Review -
Encroachment Permit (small)
(driveway, sidewalk repairs, small
retaining walls, sewer laterals or water
service by property owner, etc.)
$50.00 filing fee plus $1,000 cash bond required for
work in the street.
S-081F Application Review -
Encroachment Permit (large)
Deposit determined by staff based on valuation with
a $1,000 initial deposit. One hour minimum. Time
and materials. Bond may be required.
S-081G Application Review -
Encroachment Permit (utilities)
Time and materials. One hour minimum.
S-082B Public Improvement Inspection -
Landscaping
Based on Improvement Value:
$100,000 or less
$100,001-$500,000
More than $500,000
Deposit of:
$5,000
$10,000
$20,000
Time and materials.
S-082C Encroachment Permit Inspection
(small)
(driveways, sidewalk repairs, small
retaining walls, etc.)
$250 filing fee. Unpermitted inspection fee is
double inspection and permit fee.
Non-notification for inspection: $500 plus time and
materials.
S-082D Encroachment Permit Inspection
(large)
(If engineering plans required for street
excavation)
Time and materials. One hour minimum.
$1,000 initial deposit charged at time and materials.
Non-notification for inspection: $500 plus time and
materials.
S-082E Encroachment Permit Inspection
(utilities)
Time and materials. One hour minimum.
$1,000 initial deposit charged at time and materials.
Non-notification for inspection: $500 plus time and
materials.
S-083A
S-083B
Flood Control District Encroachment Permit
(Construction Review or Temporary Right of
Entry)
Flood Control District Permit Inspection
Time and materials. $900 initial deposit.
Time and materials. Initial deposit is the larger of
$1,000 or 10% of project valuation.
S-084A Drainage Permit Application Time and materials. $1,600 initial deposit.
S-084B Drainage Permit Inspection Time and materials. $1,600 initial deposit.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 29 of 31
S-085A Miscellaneous Road Permit Application
(house move)
Time and materials. $500 initial deposit.
S-085B Miscellaneous Road Permit Application
(house move inspection)
Time and materials. $500 initial deposit.
S-085C Miscellaneous Road Permit
Application (extra-legal load)
Permit fee set by State. Premium billing service
$100 per year plus $100 security deposit.
S-085D Miscellaneous Road Permit
Application (temporary road closure -
construction)
For-profit applicant $300.00
Not-for-profit applicant $50.00
S-085E Miscellaneous Road Permit
Application (temporary road closure -
special events)
For-profit applicant $300.00
Not-for-profit applicant $50.00
S-085F Miscellaneous Road Permit
Application (extension/modification)
$235 per extension/modification.
S-085G Road Acceptance Plan Review Same as S-072, S-073, S-074A, S-075 as applicable.
Time and materials.
S-085H
S-085S
Road Acceptance Inspection
Stormwater Management Compliance
Same as S-077, S-078, or S-080A as applicable.
Time and materials.
Time and materials. $5,000 initial deposit.
S-086 Street Vacation Review Time and materials. $2,000 initial deposit.
S-086A Floodplain Management Compliance $45 per permit.
S-086B Flood Zone Determination
Office Review: $100 per lot. $600 max for a group
of adjacent parcels.
Site Visit: $400 fee, time and materials
Base Flood Elevation Determination: $500 fee, time
and materials.
S-086C Floodplain Management Permit Application $550 per application. Time and materials.
S-086D Floodplain Elevation Certification $235 per lot.
S-086E Floodplain Map Revision/Amendment Floodplain Map Amendment: $700 fee, time and
materials.
S-088 Certificate of Correction $150 per application.
S-088A Adopt-a-Road $500 per application.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 30 of 31
S-088B Adopt-a-Park $500 per application.
S-088C Road Name Change (public road) Time and materials. $1,000.00 initial deposit.
S-088D
S-088F
Corner Record Check
Base Map Revision
Fee same as fee for recording a document at the
Recorder's Office.
$60 per lot. This fee is waived if the parcel maps or
final maps are submitted on computer disk.
S-088H Amended Map Revision Time and materials. $1,000.00 initial deposit.
S-088J Subpoena Services Evidence reproduction: $60 per hour, $15
minimum.
Witness summons: Time and materials plus
mileage, $150 deposit. Fee set per Administrative
Bulletin 133.3.
S-088L
S-089A
Computer Map and Data Requests
Reversion to Acreage
Time and materials. $1,000.00 initial deposit.
Time and materials. $10,000.00 initial deposit.
S-087C
S-083MT
Legal Counsel Review
Review of Special Technical Studies
Any project requiring special technical studies not
listed above and/or special legal counsel shall pay
costs directly in addition to County administrative
and review fees
Public Works Fees for Review of Planning Applications
S-013 Certificate of Compliance Review $1,000 deposit, time and materials.
S-014 Development Plan Review – Multi-Family $2,000 deposit, time and materials.
S-015 Development Plan Review - Residential-
Substantial
$2,000 deposit, time and materials.
S-021 Land Use Permit (Quarry) $2,000 deposit, time and materials.
S-022 Land Use Permit (Quarry Reclamation Plan) $2,000 deposit, time and materials.
S-029 Land Use Permit - Other $2,000 deposit, time and materials.
S-039A Planned Unit Development Final Development
Plan - Review/New
$2,000 deposit, time and materials.
S-039B Planned Unit Development Final Development
Plan - Review/Non-Substantial Modification
$1,500 deposit, time and materials.
LAND DEVELOPMENT FEE SCHEDULE
PROPOSED FEE REVISION DECEMBER 17, 2019
Page 31 of 31
S-039C Planned Unit Development Final Development
Plan - Review/ Substantial Modification
$2,000 deposit, time and materials.
S-040 Planned Unit Development Tentative
Subdivision Map Review
$6,000 deposit, time and materials.
S-044 Zone Variance $1,000 deposit, time and materials.
S-051A Pre-application Review $1,000 deposit, time and materials.
S-060C COA Compliance Check for Building Permit
Issuance
$1,000 deposit, time and materials.
S-060K Wireless Facility Access Permit $2,000 deposit, time and materials.
S-060L Wireless Facility Minor Alteration Permit $1,000 deposit, time and materials.
S-83PW Other Planning Applications Requiring Public
Works Department Review and Comment
$1,000 deposit, time and materials.
S-082F Right of Entry Permit for Iron Horse Corridor Small: $300 per application.
Large: $1,000 deposit, time and materials.