HomeMy WebLinkAboutMINUTES - 07212009 - C.20RECOMMENDATION(S): FIND that the Acquisitions of Property Rights for the Oakley-Trembath Detention Basins project is a California Environmental Quality Act (CEQA) activity that was covered within the scope of the previously approved East Antioch Creek Watershed (Drainage Area 56) program EIR (1981) (Section 15168(c)(2)), and FIND, on the basis of the Initial Study Negative Declaration and all comments received and staff responses contained herein, that there is no substantial evidence that the project will have a significant effect on the environment, and AUTHORIZE the Real Property Division to initiate the acquisition process for the purchase of the necessary property rights to construct the Oakley-Trembath Detention Basins, and AUTHORIZE the Director of Department of Community and Development to file a Notice of Determination with the County Clerk, and AUTHORIZE the Chief Engineer to arrange for payment of a $50.00 fee to the County Clerk for filing the Notice of Determination, a fee of $1,993.00 for California Department APPROVE OTHER RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE Action of Board On: 07/21/2009 APPROVED AS RECOMMENDED OTHER Clerks Notes: VOTE OF SUPERVISORS AYE:John Gioia, District I Supervisor Gayle B. Uilkema, District II Supervisor Mary N. Piepho, District III Supervisor Susan A. Bonilla, District IV Supervisor Federal D. Glover, District V Supervisor Contact: Claudia Gemberling (925) 313-2192 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. ATTESTED: July 21, 2009 David J. Twa, County Administrator and Clerk of the Board of Supervisors By: EMY L. SHARP, Deputy cc: Marlon Epps, Special District C. 20 To:Contra Costa County Flood Control District Board of Supervisors From:Julia R. Bueren, Public Works Director/Chief Engineer Date:July 21, 2009 Contra Costa County Subject:Oakley-Trembath Detention Basins Project, Antioch area. Project No. 7566-6D8490 of Fish and Game fees, and a $25.00 fee to the Department of Conservation and Development RECOMMENDATION(S): (CONT'D) for processing. FISCAL IMPACT: There is no impact to the County General Fund. The estimated project construction cost is $6,000,000.00 funded 100% by Drainage Area 56 funds (Fund 256600). BACKGROUND: The Contra Costa County Flood Control and Water Conservation District (District) in conjunction with the City of Antioch proposes to expand an existing detention basin (Oakley) and construct a new detention basin (Trembath), both located along East Antioch Creek in the East Antioch Creek Watershed (Drainage Area 56) within the city limits of Antioch. The purpose of this project is to provide 50-year flood protection to areas downstream of Highway 4 and to reduce the threat of flooding in Lake Alhambra (located approximately 0.6 mile downstream). Recent development in the upper watershed has resulted in the need for greater flood protection in the downstream residential neighborhoods. Prior to constructing the detention basins, the District needs to acquire property rights from non-District-owned properties located within and adjacent to the basin areas, which are subject to temporary inundation during storm events. Specifically, the District will obtain various property rights which will legally allow the District to construct and maintain these basins and associated drainage structures to ensure that floodwaters can flow through and to ensure there will be no developments or encroachments that would impede flood flows. Acquisition of property rights is a real property transaction that does not involve direct physical changes to the environment. While the Drainage Area 56 program-level Environmental Impact Report (EIR) (1981) considered property rights acquisitions necessary for these two basins, the District must determine, pursuant to Section 15168(C) of the California Environmental Quality Act (CEQA) Guidelines, whether this activity would have effects that were not previously examined in the EIR. Actual construction of the Oakley-Trembath Detention Basins will be evaluated in a separate project-specific CEQA document. CONSEQUENCE OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize funding. ATTACHMENTS S:\ENG Services\BO 7-21-09 Oakley-Trembath Detention Basins.pdf S:\ENG Services\Bo Oakley-Trembath Dention Basins 2 7-21-09.pdf S:\ENG Services\BO Oakley-Trembath Detention Basins 3 7-21-09.pdf :\ENG Services\BO Oakley-Trembath Detention Basins S:\ENG Services\BO Oakley-Trembath Detention Basins NOD 7-21-09.pdf