THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on October 2, 1984 by the following vote:
AYES: Supervisors Powers , Fanden, McPeak $ Torlakson.
NOES: None.
ABSENT: Supervisor Schroder "
ABSTAIN: None
SUBJECT: Authorize Contract Change Order, Alhambra Creek Bank Repair,
Martinez Area. Project No. 7505-6F7751-83
The Chief Engineer of Contra Costa County Flood Control and
Water Conservation District has recommended that the contract contingency
fund for the Alhambra Creek Bank Repair Project be increased by $100,000
and that he be authorized to execute Contract Change Order No. 3 in the
amount of $116,228.78 to compensate the contractor, Brudigam Development,
Inc. , for changed foundation conditions , the construction of a gabio.n
and sheet pile footing, additional import material , and additional gabion
mats to correct a design deficiency.
The Chief Engineer has reported that said change order nullifies
the claim submitted by the contractor for changed site conditions , that
the Soil Conservation Service, United States Department of Agriculture,
concurs with the amount of additional compensation due the contractor,
that $108,918.78 of the increase in cost will be borne by the Soil Conserva-
tion Service and the property owners , and that said change order and
previous change orders collectively exceed $25,000.00.
IT IS BY THE BOARD ORDERED, as the governing board of the Contra
Costa County Flood Control and Water Conservation District , that the
recommendations of the Chief Engineer are APPROVED.
hereby c."My that this la a tr ue ondcorrect copy of
an action taken and entered on the minutes of the
Boars:of Suporrttorc on the date shown.
kTTGS:r_L: OCT 21"^,.
Plat_ CATC:�ELC^, Cleric of the Board
cf ZLper4sors and County Adraalstretor
By , Deputy