HomeMy WebLinkAboutMINUTES - 10021984 - 1.26 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
October 2, 1984 , by the following vote:
Adopted this Order on
AYES: Supervisors powers , Fanden , McPeak Torlakson
NOES: None
ABSENT: Supervisor Schroder
ABSTAIN: None
Sanitation District No. 19 (Discovery Bay)
SUBJECT: Change Order No. 3 to Construction Contract with
Alan A. Bradford Company (7393-6X5263)
On October 25, 1983, the Board of Supervisors, as Ex Officio Governing
Board of Contra Costa County Sanitation District No. 19, awarded a contract
to Alan A. Bradford Company, for the Construction of Standby Engine at Water
Well No. 2.
Change Order No. 3 is described as follows:
3. Extra work at agreed price; Remove existing 10" check valve, install temporary
check valve, remove temporary check valve, and replace repaired check valve;
Install relay and solenoid at pump motor; Install approximately 30 feet
of 8" overflow pipe from Pump Station D to Manhole E32; Delay modification
of existing pump stem until Water Well No. 3 is operational; and Extend
contract by 140 days.
The Public Works Director, as Ex Officio District Engineer, recommends
that the Board approve Change Order No. 3, and authorize the Public Works Director,
to execute said Change Order.
IT IS BY THE BOARD ORDERED that the recommendation of the Public Works
Director is APPROVED.
1 hereby certify U='Weis a true and=rect copy of
an action tahen and erir•red on the minutes of the
Doord of Supervt�m On tt} to E11cwn.
ATTESTED:
PHIL BATCHELOR. Cleslc o! :!^.e Coard
of Supervlaors and County Admhl3hator
By — , Deputy
Orig. Dept.: Public Works - EC
(EJS:cl) sdl9.bo.co3.t9