Loading...
HomeMy WebLinkAboutMINUTES - 10021984 - 1.26 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA October 2, 1984 , by the following vote: Adopted this Order on AYES: Supervisors powers , Fanden , McPeak Torlakson NOES: None ABSENT: Supervisor Schroder ABSTAIN: None Sanitation District No. 19 (Discovery Bay) SUBJECT: Change Order No. 3 to Construction Contract with Alan A. Bradford Company (7393-6X5263) On October 25, 1983, the Board of Supervisors, as Ex Officio Governing Board of Contra Costa County Sanitation District No. 19, awarded a contract to Alan A. Bradford Company, for the Construction of Standby Engine at Water Well No. 2. Change Order No. 3 is described as follows: 3. Extra work at agreed price; Remove existing 10" check valve, install temporary check valve, remove temporary check valve, and replace repaired check valve; Install relay and solenoid at pump motor; Install approximately 30 feet of 8" overflow pipe from Pump Station D to Manhole E32; Delay modification of existing pump stem until Water Well No. 3 is operational; and Extend contract by 140 days. The Public Works Director, as Ex Officio District Engineer, recommends that the Board approve Change Order No. 3, and authorize the Public Works Director, to execute said Change Order. IT IS BY THE BOARD ORDERED that the recommendation of the Public Works Director is APPROVED. 1 hereby certify U='Weis a true and=rect copy of an action tahen and erir•red on the minutes of the Doord of Supervt�m On tt} to E11cwn. ATTESTED: PHIL BATCHELOR. Cleslc o! :!^.e Coard of Supervlaors and County Admhl3hator By — , Deputy Orig. Dept.: Public Works - EC (EJS:cl) sdl9.bo.co3.t9 cc: . County Administrator Auditor-Controller Public Works-Accounting Alan A. Bradford Co. (via EC) 00027