HomeMy WebLinkAboutRESOLUTIONS - 08051997 - 97-407 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Resolution on August 5, 1997, by the following vote:
AYES: Supervisors Rogers, Gerber, Canciamilla, DeSaulnier
NOES: None
ABSENT: Supervisor Uilkema
ABSTAIN: None
RESOLUTION NO. 97/407
SUBJECT: Tabulation of Mail-In Ballots, Confirmation of Diagram and Assessment and Levy
of Street Light Charges for LUP 2018-95, County Service Area L-100, EI
Sobrante area.
The Board of Supervisors of Contra Costa County RESOLVES:
1. On June 17, 1997, the Board of Supervisors adopted Resolution No. 97/327 directing
the filing of the engineer's report for street light charges for County Service Area L-100.
As directed by the Board, the Engineer of Work has filed the engineer's report.
2. On June 17, 1997, the Board adopted Resolution No. 97/327 declaring the Board's
intention to levy and collect street light charges to operate and maintain facilities and
services within CSA L-100 for fiscal year 1997-98 and setting a public hearing for
August 5, 1997. Notice of the hearing was given in the time and manner required by
law.
3. Resolution No. 97/327 directed the Engineer of work (Public Works Director) to cause
to be mailed to property owners within LUP 2018-95 the notices and ballots required by
Section 4 of Article XIII D of the California Constitution (Proposition 218).
4. The notices and ballots have been mailed to property owners and the returned ballots
are ready to be tabulated.
NOW, THEREFORE, the Board FINDS, DETERMINES and ORDERS that:
1. A public hearing was held before this Board on August 5, 1997 at 10:30 a.m. At the
hearing, the Engineer of Work presented to the Board all ballots received from property
owners within LUP 2018-95 a proposed tabulation of those ballots. The Board heard
and considered all protests against the proposed assessments and tabulated the
returned ballots according to the proportional financial obligation of the affected
properties. The Board also afforded to every interested person an opportunity to make
a protest to the engineer's report, either in writing or orally, and the Board considered
each protest.
2. A majority protest, as defined in section 4(e) of Article XIII D, does not exist.
3. The Board hereby confirms the diagram and assessment as set forth in the report of the
Engineer of Work and hereby levies the street light charges set forth therein in LUP
2018-95 for fiscal year 1997-98.
SE:cs
g:\EngSVc\SpDist\July\LUP2018.Res @ hereby Certify that this Is a true and correct copy of
an action taken and entered on the minutes of the
Ong.Dept.: Public Works Department(Special Districts) Board of Superl50ra on the =.:)shown.
Contact: Skip Epperly,313-2253
cc: Assessor /►jTESTED:
Auditor-Controller PHIL ryLCi�,Clerk mho boar
Of SUpeNisoriSOrB and County AdministratorCounty Administrator
County Counsel '
Accounting
RESOLUTION NO. 97/407