HomeMy WebLinkAboutMINUTES - 12181984 - X.3 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on December 18, 1984 by the following vote:
AYES: Supervisors Powers , Fanden, Schroder, McPeak & Torlakson
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT: In the Matter of Award of Contract for Pavement. Mar.king. Demon-
stration Project, Project No. 0662-6R4267-84, Countywide Area.
Bidder Total Amount Bond Amounts
Central Striping $28,687.46 Payment $14,348.00
Service, Inc. Faith. Perf. $28,687.46
11391 Pyrites Way
Rancho Cordova, CA 95670
Chrisp Company
The above-captioned project and the specifications therefor being
approved, bids being duly invited and received by the Public Works Director;
and
The Public Works Director recommending that the bid listed first
above is the lowest responsible bid and this Board concurring and so
finding; ,
IT IS BY THE BOARD ORDERED, that the contract for the furnishing
of labor and materials for said work is awarded to said first listed
bidder at the listed amount and at the unit prices submitted in said
bid; and that said contractor shall present two good and sufficient surety
bonds as indicated above; and that the Public Works Department shall
prepare the contract therefor.
IT IS FURTHER ORDERED that, after the contractor has signed the
contract and returned it together with bonds as noted above and any required
certificates of insurance or other required documents, and the Public
Works Director has reviewed and found them to be sufficient, the Public
Works Director is authorized to sign the contract for this Board.
IT IS FURTHER ORDERED that, in accordance with the project
specifications and/or upon signature of the contract by the Public Works
Director, any bid bonds posted by the bidders are to be exonerated and any
checks or cash submitted for bid security shall be returned.
I h�rrhy certify:het:his Is a true and correct copy of
an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
ATTESTED: mr. I R 192,4
PHIL BATCHELOR, Clerk of the Board
Orig.Dept.: Public Works Department of Supervisors and County Administrator
Design and Construction Division -
By , Deputy
cc: County Administrator J
County Auditor-Controller
Public Works Director
Design and Construction Division
Accounting Division
Contractor
PAVEMARKBO.1712
00 173
1 . Central striping s,-y' ,pavement mrk award contractl
2 . Countywide area