Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ORDINANCES - 12151998 - 98-57 (2)
f, EXHIBIT A t ORDINANCE NO. 98- 57 AN ORDINANCE OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ESTABLISHING DRAINAGE FEES IN THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DRAINAGE AREA 30C The Board of Supervisors of Contra Costa County as the Governing Body of the Contra Costa County Flood Control and Water Conservation District does ordain as follows: SECTION 1 Ordinance No. 87-70 of the Contra Costa County Flood Control and Water Conservation District is hereby repealed. SECTION 2 The Board hereby enacts the following as the Drainage Fee Ordinance for Drainage Area 30C. SECTION I DRAINAGE PLAN. The drainage plan and map entitled "Drainage Area 30C, Boundary Map and Amended Drainage Plan," dated April, 1987, on file with the Clerk of the Board of Supervisors, is adopted as the drainage plan for the Contra Costa County Flood Control and Water Conservation District Drainage Area 30C pursuant to Sections 12.2 and 12.3 of the Contra Costa County Flood Control and Water Conservation District Act (Chapter 63 of West's Appendix of the Water Code.). SECTION Il FINDINGS. This Board finds and determines that said drainage area has inadequate drainage facilities; that future subdivision and development of property within said drainage area will have a significant adverse impact on existing and future developments; that development of property within the drainage area, with its resultant increase in impervious surfaces, will require the construction of facilities described in the drainage plan; that the fees herein provided to be charged are uniformly applied on a square foot of impervious surface basis and fairly apportioned within said drainage are on the basis of benefits conferred on property upon which additional impervious surfaces in said drainage area are constructed; that the estimated total of all fees collectible hereunder does not exceed the estimated total costs of all drainage facilities shown on the drainage plan or included in the Engineer's Report; and that the drainage facilities planned are in addition to existing drainage facilities already serving the drainage area at the time of the adoption of the drainage plan. SECTION III EXEMPTIONS. The fee shall not be required for the following: 1) to replace a structure destroyed or damaged by fire, flood, winds or other acts of God, provided the resultant structure has the same, or less impervious surface as the original structure; 2) To modify structures or other impervious surfaces, provided the amount of ground coverage is not increased by more than 100 square feet; 3) To convey land to a government agency, public entity, public utility, or abutting property owner where a new building lot or site is not created as a result of the conveyance; or 4) Any lot or property for which drainage fees have been fully paid previously. Ordinance No. 98-57 ,Page 1 of SECTION IV. FEE DEFERMENT. On lots greater than two acres in size, the property owner can defer the payment of the fee on the portion of the lot in excess of two acres that is not a required part of the pending development. The deferment of fee is conditional on the property owners granting, as collateral, the development rights to the Board of Supervisors for said area of deferred fee until such time as the fee is paid. SECTION V. BUILDING PERMITS. Except as permitted under Section III and IV, the Contra Costa County or the.city official having jurisdiction shall not issue any building permit for construction within the drainage area until the required drainage fee has been paid. For initial construction the fee shall be as set for the in Section VII. For single family residential swimming pools on lots for which the drainage fee has not been paid, the fee shall be per pool. For other construction, modifications or replacements to an existing facility that cause an increase in impervious surface, including, but not limited to, driveways, walks patios, etc., the amount of net increase in impervious surface shall be subject to a fee ofr'lrii.4Q:per square foot,but not to exceed the amount required under Section VII. SECTION VI SUBDIVISIONS. Except as permitted under Sections III and IV, the subdivider shall pay the drair+age fee on the entire proposed subdivision or on each individual unit for which a final or parcel map is filed prior to recordation of said map. Town house, condominium, and cluster housing type subdivisions creating individual lots less than 4,000 square feet shall be treated as multifamily residential and the lot size used in determining the "square feet of land per unit" shall be the lot size prior to subdividing. Except as noted above, the fee for all other subdivisions shall be calculated on an individual lot basis. The fee amount shall be as set forth in Section VII. SECTION VII. FEE SCHEDULE f'ees Incr'eASed ........ ......... Measure Building Permit Subdivisio Co Industrial/Downtown office Acre $17,270.00 1 $18,551 Office( um) Acre $14,800.00 $1 9.00 Office(Light) Acre $12 385.00 3,960 00 Multifamily residenti ncluding Mobile Home Parks) Less than 2,500 sq. ft of la er unit Acre $13,6 0 $13,608.00 2,500 to 2,999 " Unit 00 $806.00 3,000 to 3,999" Unit $924.00 $924.00 4,000 to 4,999" Unit $1,075.00 $1,075.00 5,000 to 5,999" U $1,230.00 $1,230.00 6,000 to 6,999" nit $1,381.00 $1,381.00 7,000 to 7,999" Unit $1,528.00 $1,528.00 8,000 +" nit j,; $1,604.00 $1,604.00 I 111V Single Family Residential: 4,000 to 4,999 sq. ft. of land per unit Unit ! $1,129.00 $1,810.00 5,000 to 5,999" Unit 80.00wll $1,885.00 6,000 to 6,999 " Unit $1,2 0 $1,961.00 7,000 to 7,999 " Unit $1,281.005N, $2,037.00 81000 to 9,999 " Unit $1,356.00 $2,146.00 _. 10,000 to 13 Unit $1,507.00 364.00 14,000 tgA,999 Unit $1,759.00 $2,7%Q00 20, to 29,999 " Unit $2,175.00 $3,263. ,000 to 39,999 " Unit $2,700.00 T$3,897.00 Ordinance No. 98-57 Page 2 of 4 Measure 0WIding Permit Su 40,b©0+... . .Unit $3,238. ,489,Qe Agricultural: Under 10% of lot' Exemp /o ofJatimpervious _.,. Acre $16,4600 _. On sin e family lots, bams and sheds in excess of 400 square feet and tennis and sports courts shall not be considered as incidental residential facilities included in the above fee schedule. The drainage fee for the portion of these facilities in excess of 400 square feet shall be calculated using the square foot fee in Section V, and it shall be in addition to the above fee amounts. For the purpose of this ordinance, subject to Section VI, lot size shall be (1) for existing lots, that land shown on the latest equalized assessment roll as a lot; or(2) for new subdivision lots, that land shown on the final or parcel map as a lot. The fee amounts under"Single Family Residential"shall apply to lots containing only one dwelling unit. For multifamily residential (including mobile home parks) the "square feet of land per unit" shall be the quotient obtained by dividing the lot size in square feet by the number of dwelling units proposed to be on-the lot. SECTION VIII. FEE PAYMENT. The official having jurisdiction may accept cash or check, or, when authorized by the District's Chief Engineer, other consideration such as actual construction of a part of the planned drainage facilities by the applicant or his principal. All fees collected hereunder shall be distributed into the appropriate accounts. $0.25 of each $0.42 collected will be deposited in the County Treasury to the account of the drainage facilities fund established for the drainage area. The remaining $0.17 of each $0.42 will be deposited into the Flood Control Zone 1 fund to be used for improvements in the Marsh Creek Regional Improvement Pian. Monies in said funds shall be expended solely for land acquisition, construction, engineering, administration, repair maintenance and operation or reimbursement for the same, in whole or in part, of planned drainage facilities within the drainage area, or the Marsh Creek Regional Improvement Plan. Said monies may also be used to reduce the principal or interest of any indebtedness of the drainage area, or the Flood Control Zone 1 fund. SECTION IX. CREDIT. Drainage fees previously paid shall be credited as follows: A Where drainage fees have been paid under a former drainage fee ordinance based on acreage, fees shall not be required under Section VII for any part of the total area for which the fee was paid, except in the case of a resubdivision. B Where drainage fees have been paid under this ordinance or another drainage fee ordinance based on impervious surface, fees shall not be required under Section VII for the total impervious surface area for which the fee was paid. However, fees shall be payable under Section VII for any additional impervious surface area. C Where drainage fees have been paid other than pursuant to an adopted drainage fee ordinance, the dollar amount of the fee paid for the development site in question shall be credited against the fees payable under Section VII. Ordinance No.98-57 Page of SECTION X. REVIEW OF FEES. Project cost estimates shall be reviewed every year that this ordinance is in effect. The fee schedule shall be adjusted annually on January 1 to account for inflation using the Engineering News Record Construction Cost Index. Such adjustment shall not require further notice or public hearing. SECTION XI. EFFECTIVE DATE. This ordinance becomes effective 60 days after passage, and within 15 days of passage shall be published once with the name of supervisors voting for and against it in the Brentwood News, a newspaper published in this area. PASSED AND ADOPTED ON/a Is-9k, by the following vote: AYES: SUEPRVISORS GERBER, DESAULNIER, CANCIAMILLA AND ROGERS NOES: NONE ABSENT: NONE ABSTAIN: NONE Chair of the Board I7 ATTEST: PHIL BATCHELOR Clerk of the Board of Supervisors and County Administrator By: Deputy G\fldctl\Mi1ton\DA30G Exhib I.doc 10/22/98 Ordinance No. 98-57 Page 4 of 4 DRAINAGE AREA DA30C - FEE'INCREASES EFFECTIVE JANUARY 1, 2003 ORDINANCE 98-57 FUND 2558 BUILDING SUBDIVISION DESCRIPTION MEASURE PERMIT RATE RATE Pool Fee Pool 415 415 Square Foot Sq. Ft: 0.47 0.47 OTHER: Commercial/Industrial/Downtown Office Acre 19,361 20,797 Office (Medium) Acre 16,592 18,541 Ofice ( Light) Acre 13,884 15,649 MULTIFAMILY RESIDENTIAL(INCLUDING MOBILE HOME PARKS): Less than 2,500 sq. ft. of land per unit Acre 15,255 15,255 2,500 TO 2,999 sq. ft. " Unit 903 903 3,000 TO 3,999 sq. ft. " Unit 1,036 1,036 4,000 TO 4,999 sq. ft. " Unit 1,205 1,205 5,000 TO 5,999 sq. ft. " Unit 1,379 1,379 6,000 TO 6,999 sq. ft. " Unit 1,548 1,548 7,000 TO 7,999 sq. ft." Unit 1,713 1,713 8,000 + sq. ft." Unit 1,799 1,799 SINGLE FAMILY RESIDENTIAL: Less than 4,000 TO 4,999 sq. ft. of land per unit Unit - R4 1,266 2,030 5,000 TO 5,999 sq. ft. " Unit - R5 1,323 2,113 6,000 TO 6,999 sq. ft. " Unit - R6 1,379 2,198 7,000 TO 7,999 sq. ft. " Unit - R7 1,436 2,283 8,000 TO 9,999 sq. ft. " Unit - R8 1,520 2,405 10,000 TO 13,999 sq.ft. " Unit - R10 1,690 2,650 14,000 TO 19,999 sq. ft. " Unit - R14 1,972 3,050 20,000 TO 29,999 sq. ft. " Unit -R20 2,438 3,658 30,000 TO 39,999 sq. ft. " Unit - R30 3,026 4,369 40,000 sq. ft. + Unit - R40 3,630 5,032 AGRICULTURAL:. Under 10% of lot impervious Acre EXEMPT More than 10% of lot impervious Acre 18,457 Drainage Facilities Portion Sq. Ft. 0.28 Flood Zone 1 - Marsh Creek Imprv. I Sq. Ft. 0.20 I Annr nn na' =M n onr KIZNN T)nTCC L, rl'7')Mnn'2 1-nO PNA