HomeMy WebLinkAboutMINUTES - 09162008 - C.5 TO: BOARD OF SUPERVISORS `*=S��L=='O� Contra
FROM: JULIA R. BUEREN,PUBLIC WORKS DIRECTOR
Costa
DATE: September 16, 2008
.cdoii`� �� County
y
_ srq
SUBJECT: Fully close a portion of Walnut Boulevard,for a 15 consecutive day period between September 16, 2008
and October 31,2008,24 hours per day,Brentwood area. (District III)
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION: (gyp
ADOPT Resolution No. 2008/_approving and authorizing the Public Works Director, or designee, to fully close a
portion of Walnut Boulevard, for a 15 consecutive day period between September 16, 2008 and October 31, 2008, 24
hours per day, for the purpose of completing the construction of the tie-in to the new Walnut Boulevard at Vasco Road
intersection for the State Route 4 Bypass Project, Brentwood area. (District III)
FISCAL IMPACT:
None.
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
Applicant shall follow guidelines set forth by the Public Works Department.
CONSEQUENCES OF NEGATIVE ACTION:
Applicant will be unable to close the road for planned activities.
Continued on Attachment: SIGNATURE:
ECOMMENDATION OF COUNTY ADMINISTRATOR
ECOMMENDATION OF BOARD COMMITTEE
APPROVE —OTHER
SIGNATURE (S):
ACTION OF BOARD ON 4.,&�gPROVED AS RE OMMENDED OTHER
VOCE OF SUPERVISORS /' I hereby certify that this is a true and correct
�/ UNANIMOUS (ABSENT d ne--,, ) copy of an action taken and entered on the
AYES: NOES: minutes of the Board of Supervisors on the
ABSENT: ABSTAIN: date shown.
ATTESTE .
RH:jc DAVID KVA, Clerk of the Board of
G:\EngSvc\BO\2008\09-16\RC-08-19 BO.docx Supervisors and County Administrator
Orig. Div: Public Works(ES)
Contact: Bob Hendry (335-1575)
cc: L. Theis, Design By Z464� �' Deputy
CHP
Sheriff-Patrol Div. Commander
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Resolution on Septmber 16, 2008 by the following voter
AYES: Gioia, Uilkema, Piepho, Bonilla,
and Glover
NOES: None
ABSENT: None
ABSTAIN: None
-- -- - -- — RESOLUTION NO. 2008/
SUBJECT: Approving and Authorizing the Public Works Director, or designee, to fully close a
portion of Walnut Boulevard, for a 15 consecutive day period between September 16,
2008 and October 31, 2008, 24 hours per day, for the purpose of, completing the
construction of the tie-in to the new Walnut Boulevard at Vasco Road intersection for the
State Route 4 Bypass Project Brentwood area. (District III)
RC-08-19
IT IS BY THE BOARD RESOLVED that permission is granted to State Route 4 Bypass
Authority to fully close Walnut Boulevard, except for emergency traffic, for a 15 consecutive day period
between September 16, 2008 and October 31, 2008, 24 hours per day, subject to the following conditions:
1. Traffic will be detoured via neighboring streets per plan reviewed by the Public Works
Department.
2. All signing to be in accordance with the Manual of Uniform Traffic Control Devices including
the California Supplement.
3. State Route 4 Bypass Authority shall comply with the requirements of the Ordinance Code of
Contra Costa County.
4. Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for
Comprehensive General Public Liability which names the County as an additional insured prior
to permit issuance.
5. Obtain approval for the closure from the Sheriffs Department, the California Highway Patrol and
the Fire District.
I hereby certify that this is a true and correct copy of an
action taken and entered on the minutes of the Board of
RH.jc Supervisors on the date shown.
G:\EngSvc\BO\2008\09-16\RC-08-19 BO.docx
Originator: Public Works(APC) ATTESTED: �G, Aye
Contact: Bob Hendry (335-1375) DAVID TWA/,Cle c of the Board of Supervisors and County
Administrator
cc: L. Theis - Design
CHP By r Deputy
Sheriff-Patrol Div. Commander
RESOLUTION NO. 2008/_ChQf