Loading...
HomeMy WebLinkAboutMINUTES - 09162008 - C.5 TO: BOARD OF SUPERVISORS `*=S��L=='O� Contra FROM: JULIA R. BUEREN,PUBLIC WORKS DIRECTOR Costa DATE: September 16, 2008 .cdoii`� �� County y _ srq SUBJECT: Fully close a portion of Walnut Boulevard,for a 15 consecutive day period between September 16, 2008 and October 31,2008,24 hours per day,Brentwood area. (District III) SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: (gyp ADOPT Resolution No. 2008/_approving and authorizing the Public Works Director, or designee, to fully close a portion of Walnut Boulevard, for a 15 consecutive day period between September 16, 2008 and October 31, 2008, 24 hours per day, for the purpose of completing the construction of the tie-in to the new Walnut Boulevard at Vasco Road intersection for the State Route 4 Bypass Project, Brentwood area. (District III) FISCAL IMPACT: None. REASONS FOR RECOMMENDATIONS AND BACKGROUND: Applicant shall follow guidelines set forth by the Public Works Department. CONSEQUENCES OF NEGATIVE ACTION: Applicant will be unable to close the road for planned activities. Continued on Attachment: SIGNATURE: ECOMMENDATION OF COUNTY ADMINISTRATOR ECOMMENDATION OF BOARD COMMITTEE APPROVE —OTHER SIGNATURE (S): ACTION OF BOARD ON 4.,&�gPROVED AS RE OMMENDED OTHER VOCE OF SUPERVISORS /' I hereby certify that this is a true and correct �/ UNANIMOUS (ABSENT d ne--,, ) copy of an action taken and entered on the AYES: NOES: minutes of the Board of Supervisors on the ABSENT: ABSTAIN: date shown. ATTESTE . RH:jc DAVID KVA, Clerk of the Board of G:\EngSvc\BO\2008\09-16\RC-08-19 BO.docx Supervisors and County Administrator Orig. Div: Public Works(ES) Contact: Bob Hendry (335-1575) cc: L. Theis, Design By Z464� �' Deputy CHP Sheriff-Patrol Div. Commander THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Resolution on Septmber 16, 2008 by the following voter AYES: Gioia, Uilkema, Piepho, Bonilla, and Glover NOES: None ABSENT: None ABSTAIN: None -- -- - -- — RESOLUTION NO. 2008/ SUBJECT: Approving and Authorizing the Public Works Director, or designee, to fully close a portion of Walnut Boulevard, for a 15 consecutive day period between September 16, 2008 and October 31, 2008, 24 hours per day, for the purpose of, completing the construction of the tie-in to the new Walnut Boulevard at Vasco Road intersection for the State Route 4 Bypass Project Brentwood area. (District III) RC-08-19 IT IS BY THE BOARD RESOLVED that permission is granted to State Route 4 Bypass Authority to fully close Walnut Boulevard, except for emergency traffic, for a 15 consecutive day period between September 16, 2008 and October 31, 2008, 24 hours per day, subject to the following conditions: 1. Traffic will be detoured via neighboring streets per plan reviewed by the Public Works Department. 2. All signing to be in accordance with the Manual of Uniform Traffic Control Devices including the California Supplement. 3. State Route 4 Bypass Authority shall comply with the requirements of the Ordinance Code of Contra Costa County. 4. Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance. 5. Obtain approval for the closure from the Sheriffs Department, the California Highway Patrol and the Fire District. I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of RH.jc Supervisors on the date shown. G:\EngSvc\BO\2008\09-16\RC-08-19 BO.docx Originator: Public Works(APC) ATTESTED: �G, Aye Contact: Bob Hendry (335-1375) DAVID TWA/,Cle c of the Board of Supervisors and County Administrator cc: L. Theis - Design CHP By r Deputy Sheriff-Patrol Div. Commander RESOLUTION NO. 2008/_ChQf