Loading...
HomeMy WebLinkAboutMINUTES - 08052008 - C.16 o� TO: BOARD OF SUPERVISORS -— -_-__•, Contra FROM: JULIA R. BUEREN, PUBLIC WORKS DIRECTOR Costa „h o� DATE: August 5, 2008 ST`9`COUt1't"I, County SUBJECT: Utility Agreement between Contra Costa County and AT&T California (AT&T), in the Oakley area, (AT&T Funds), (District V) Co. Project No.: 0662-6R4043-02; Federal Project No.: BRLS 5928 (024) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: APPROVE Utility Agreement No.04-UT-005 between Contra Costa County and AT&T California effective August 5, 2008 through completion of project in the amount of $585,100 to fund the installation of conduits for the relocation of communication facilities to accommodate the Bethel Island Road Bridge Replacement project,in the Oakley area. AUTHORIZE the Chair of the'Board of Supervisors to execute the Utility Agreement. i CONTINUED ON ATTACHMENT: ❑D SIGNATU �/ RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD.1010MMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON iOVED AS RECOMMENDED OTHER VOTE SUPERVISORS: I HEREBY CERTIFY THAT THIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON UNANIMOUS(ABSENT Os7(/ ) MINUTES OF THE BOARD OF SUPERVISORS ON THE AYES: NOES: DATE SHOWN. ABSENT: ABSTAIN: Contact: Neil Leary,Design 313-2278 NL:kp G:\Design\BOARD ORDERS\2008\BO 8-5-2008 AT&TBethel Island Road Bridge ATTESTED 0'&d'Sd±gf ty'r .1ftV if/- ' Replacement.doc JOHN CULL ,CLERK OF THE BONRD O SUPERVIS S cc: Auditor-Controller E.Kuevor-CAO M.Hollingsworth,Design N.Leary,Design BY: DEPUTY C.Raynolds,Accounting .SUBJECT: Utility Agreement between Contra Costa County and AT&T California (AT&T), in the Oakley area, (AT&T Funds), (District V) Co. Project No.: 0662-6R4043-02; Federal Project No.: BRLS 5928 (024) DATE: August 5, 2008 PAGE: 2 of 2 FISCAL IMPACT: There will be no impact to the General Fund.The estimated cost to install the conduits for communication facilities to be owned and maintained by AT&T California(AT&T)is$585,100. All costs associated with this work will be paid for by AT&T. REASONS FOR RECOMMENDATIONS AND BACKGROUND: The County plans to replace the Bethel Island Road Bridge over Dutch Slough which connects Bethel Island to the Oakley area. AT&T California (AT&T) owns and maintains communication facilities within the limits of the County's plan for the bridge replacement project. The proposed bridge is planned to be constructed in the same approximate location of the existing bridge requiring the relocation of AT&T's communication facilities to accommodate the County's project. This agreement provides for the installation of conduits in the new bridge and approach roadways for future communication facilities. This agreement also provides for the installation of utility facilities appurtenant to the conduits including four concrete utility vaults. The existing communication facilities are located within the County's right of way under franchise agreement and will be relocated at AT&T's expense pursuant to the provisions of Section 7901 of the Public Utilities Code. CONSEQUENCES OF NEGATIVE ACTION: If the agreement is not approved, the implementation of the project may be delayed so that AT&T can hire a contractor to install the conduits themselves. If the conduits are not installed by the County's contractor,the bridge construction time will need to be increased to allow AT&T's forces a sufficient window of time to install these facilities during the bridge replacement contract. Pagel of 5 Dist. 04 Co. CC Rte 0 KP .M. CR EA 928132L Federal Aid No.: BRLS-5928(024) Owner's File: AT&T California FEDERAL PARTICIPATION: On the Project O Yes ❑No On the Utilities ❑Yes ONo UTILITY AGREEMENT NO.: 04-UT-005 DATE: The County of Contra Costa, a political subdivision of the State of California, hereinafter referred to as "COUNTY," is replacing the Bethel Island Road Bridge over Dutch Slough which connects Bethel Island to the Oakley area, hereinafter referred to as "PROJECT". Pacific Bell Telephone Company doing business as AT & T CALIFORNIA, a California corporation, hereinafter called "OWNER," owns and maintains utility facilities pursuant to Section 7901 of the Public Utilities Code within the limits of COUNTY's plan for the PROJECT. To accommodate the PROJECT and at OWNER'S request, COUNTY shall install pipe conduit and appurtenant structures within the new bridge structure and reconstructed approach roadways. It is hereby mutually agreed that: I. WORK TO BE DONE In accordance with Notice to Owner No. 005 dated August 9, 2007, COUNTY shall install 100mm (4-inch) diameter rigid steel pipe conduits for future communication facilities within the new bridge structure and various lengths and groupings of 100mm(4-inch) diameter high density plastic conduits within trenches in the approach roadways hereinafter collectively referred to as "CONDUIT" as shown on OWNER'S telephone conduit plans dated May, 2008 for the replacement of Bethel Island Road Bridge, Job # 5720467, which by this reference are made a part hereof. In accordance with Notice to Owner No. 005 dated February 5, 2008, OWNER shall 1) Relocate, at their own cost and in coordination with COUNTY's PROJECT schedule, all their existing utility facilities in conflict with the COUNTY'S PROJECT that are within COUNTY road right of way under franchise agreement; and 2) Provide to COUNTY plans and specifications for incorporation of CONDUIT into PROJECT. Deviations from the plans described above initiated by either the COUNTY or the OWNER, shall be agreed upon by both parties hereto under a Revised Notice to Owner. Such Revised Notices to Owner, approved by the COUNTY and agreed to/acknowledged by the OWNER, will constitute an approved revision of the plan described above and are hereby made a part hereof. No work under said deviation shall commence prior to written agreement/acknowledgement by the OWNER of the Revised Notice to Owner. Changes in the scope of the work will require an amendment to this Agreement in addition to the Revised Notice to Owner. It is mutually agreed that the COUNTY will include the work of CONDUIT as part of the Page 2 of 5 UTILITY AGREEMENT NO. 04-UT-005 COUNTY's bridge construction contract. OWNER shall have the right to inspect the work during construction. Upon completion of the work by COUNTY, OWNER agrees to accept ownership and maintenance of CONDUIT. Owner's acceptance of CONDUIT shall not be unreasonably withheld or delayed upon completion of construction by COUNTY. If OWNER does not approve or disapprove CONDUIT within ten working days of written notice to OWNER of COUNTY's completion of CONDUIT work,the CONDUIT will be deemed approved by OWNER. II. LIABILITY FOR WORK The existing utility (phone/communications) facilities are located within COUNTY's right of way under State franchise agreement and will be relocated at OWNER's expense pursuant to this agreement. OWNER will pay COUNTY for costs incurred by COUNTY in incorporating the CONDUIT work into County's PROJECT including construction of CONDUIT. These costs include, but are not limited to the cost of materials, labor, design and construction engineering, overhead, mark-ups, and change order fees. An estimate of costs is provided in the attached Exhibit A-1 but the final costs may be higher or lower and will be determined as follows: 1. The cost of materials and labor for installing the CONDUIT will be based upon the amount listed for those items in the contract of the bidder who is ultimately awarded the PROJECT. 2. The cost of construction engineering for the CONDUIT will be 15% of the total cost listed for CONDUIT in the contract of the bidder who is ultimately awarded the PROJECT. 3. The cost of design engineering for the CONDUIT will be 10% of the total cost listed for CONDUIT in the contract of the bidder who is ultimately awarded the PROJECT. 4. Change order fees, if any, related to CONDUIT. 5. Actual cost of any additional work not covered in the contract bid, including field supervisor costs. Page 3 of 5 UTILITY AGREEMENT NO. 04-UT-005 III. PERFORMANCE OF WORK OWNER shall have access to all phases of the CONDUIT work to be performed by COUNTY, for the purpose of inspection to ensure that the work is in accordance with the specifications contained in the COUNTY'S contract plans for the replacement of Bethel Island Road Bridge, EA9281321,; however, all questions regarding the work being performed will be directed to COUNTY's Resident Engineer for the PROJECT for their evaluation and final disposition. COUNTY agrees to cause the herein described work to be performed by a contract with the lowest responsible bidder who will be subject to prevailing wage requirements and be selected pursuant to a valid competitive bidding procedure, and to furnish or cause to be furnished all necessary labor, materials, tools, and equipment required therefore, and to prosecute said work diligently to completion. COUNTY shall verify compliance with the prevailing wage requirements with this requirement in the administration of its contracts referenced above. IV. PAYMENT FOR WORK After COUNTY opens bids for the PROJECT, OWNER will advance to COUNTY a sum of money equal to the costs for the CONDUIT as outlined in Section H of this agreement based on the bid submitted by the responsible low bidder for the PROJECT. OWNER will deposit such advance with COUNTY within 30 days after COUNTY gives OWNER notice of such amount. In the event the COUNTY awards the PROJECT contract to a different bidder, the following shall apply: (1) If the costs for the CONDUIT in the successful bidder's contract are less than the amount of OWNERS's deposit, or no greater than 10% more than the amount on deposit with the COUNTY, no adjustments to OWNER's deposit will be made until the PROJECT has been completed and accepted by COUNTY; (2) If the costs for the CONDUIT in the successful bidder's contract are greater than 10% above the amount on deposit with the COUNTY, OWNER will advance 100% of the difference within 30 days after COUNTY gives OWNER notice of such amount. In the event actual final construction costs as established herein are less than the sum of money advanced by OWNER to COUNTY, COUNTY agrees to refund to OWNER within 90 days of the acceptance of the CONDUIT work the difference between said actual cost and the sum of money so advanced. In the event actual cost of CONDUIT exceeds the sum of money advanced to COUNTY pursuant to Section IV, "Payment For Work", of this Agreement, OWNER agrees to reimburse COUNTY said additional costs within 30 days after receipt of an itemized bill. COUNTY shall reimburse OWNER for any interest accrued on their initial deposit less COUNTY'S cost to process the interest payment. Page 4 of 5 UTILITY AGREEMENT NO. 04-UT-005 V. GENERAL CONDITIONS Termination. This Agreement may be terminated (1) by COUNTY following 7 days' advance written notice to OWNER of cancellation or modification of the PROJECT that eliminates the necessity of CONDUIT work; (2) immediately by the mutual written consent of the governing bodies of both parties; or (3) by COUNTY in the event of any breach of this agreement by OWNER following 15 days' advance written notice to OWNER if the breach is not cured within the 15 day period. OWNER shall still be obligated to pay COUNTY for all of the costs associated with the CONDUIT that were incurred by COUNTY up through the date of termination including COUNTY'S costs to remove CONDUIT work from the PROJECT by change order. If OWNER has already deposited with COUNTY the estimated costs of the CONDUIT, COUNTY may deduct its CONDUIT associated costs from the deposit and return the balamee to OWNER. Notices. All notices (including requests, demands, approvals or other communications) under this Agreement shall be in writing. A. Notice shall be sufficiently given for all purposes as follows: 1. When delivered by first class mail, postage prepaid, notice shall be deemed delivered three (3)business days after deposit in the United States Mail. 2. When mailed by certified mail with return receipt requested, notice is effective on receipt if delivery is confirmed by a return receipt. 3. When delivered by overnight delivery by a nationally recognized overnight courier, notice shall be deemed delivered one (1) business day after deposit with that courier. 4. When personally delivered to the recipient, notice shall be deemed delivered on the date personally delivered. B. The place for delivery of all notices given under this Agreement shall be as follows: COUNTY: Contra Costa County, Public Works Department Attn: Julia R. Bueren, Director 255 Glacier Drive Martinez, CA 94553 OWNER: AT &T California Attn: Millie Tabayoyon, Public Works Coordinator 2600 Camino Ramon Rm 2N000B • Page 5 of 5 UTILITY AGREEMENT NO. 04-UT-005 San Ramon, CA 94583 or to such other addresses as COUNTY and OWNER may respectively designate by written notice to the other. Retention of Cost Information. As this is a federal aid project, 23CFR 645, concerning federal reimbursement for utility relocations, is hereby incorporated into this Agreement. Pursuant to this provision, detailed records of the PROJECT costs shall be retained by the COUNTY for three years from the date that the COUNTY submits its final invoice to the California Department of Transportation, and shall be available for audit in accordance with audit principles and standards as set forth in 48 CFR, Chapter 1, Part 31 by COUNTY, state and/or federal auditors. THE ESTIMATED COST TO COUNTY FOR ITS SHARE OF THE ABOVE-DESCRIBED WORK IS$ 0.00 IN WITNESS WHEREOF,the above parties have executed this Agreement the day and year above written. COUNTY OF CONTRA CO OWNER: AT&T California,a California corporation y . j .ZSOOBy LL— Federal Glover,Chair Date Printed Name: I D iL� Date Board of Supervisors I Title: .A g" �1 4f,)A6-f JZ Lt ATTEST: By John Cullent,Coiffity Administrator to ' Clerk of the Board of Supervisors AP OVAL RECOMMENDED: By Julia R. ate R Public Works Director FORM APPROVED: Silvano B.Marchesi County I By (; D y Z:\GtpData\Design\Coacspondence\CURRENT PROJECTS\Bethel Island Bridge Replacement\Utilities\AT&T\Utility Agreement-AT&T(005)version 2.docx EXHIBIT A-1 Estimated Construction Costs for "CONDUIT' for AT&T Item Amount Unit Unit Price Total 5-100mm rigid steel duct bank (Bridge, 275 M $900 $247,500 for telephone) 2-100mm rigid steel duct bank (Bridge, 275 M $350 $96,250 for telephone) Utility Trench "A" (2x100mm conduit, 330 M $210 $69,300 for telephone) Utility Trench "B" (5x100mm conduit, 120 M $325 $39,000 for telephone) Utility Vault (Oldcastle Precast 38-PTS- 2 EA $5,000 $10,000 65 with frame and cover) Utility Vault (Oldcastle Precast PTS- 2 EA $3,000 $6,000 3660 with frame and cover assembly) Total Estimated Contract Cost = $468,050 Construction Engineering = $70,208 (15% Contract Cost) Subtotal Construction Cost $538,258 Design Engineering (10% Contract Cost) _ $46,805 TOTAL Construction Cost (Rounded) _ $585,100 Z:\GrpData\Design\Correspondence\CURRENT PROJECTS\Bethel Island Bridge Replacement\Utilities\AT&T\Exhibit A-1 Utility Agreement.doc