Loading...
HomeMy WebLinkAboutMINUTES - 08192008 - C.86 TO: BOARD OF SUPERVISORS, AS GOVERNING Contra`-���"f ''��-��"' BOARD OF THE FLOOD CONTROL & WATER CONSERVATION DISTRICT �' o. - Costa FROM: JULIA R. BUEREN, CHIEF ENGINEER County DATE: August 19, 2008 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II & IV) Project No. 7520-6B8345 SPECIFIC REQI.:ES-I-(S)OR RECOMMENDATION(S)fi BACKGROUND AND JUSTIFICATION RECOMMENDED ACTION: . DETERMINE that there is a need to continue the emergency action taken by the Board of Supervisors on April 10, 2007,pursuant to Public Contract Code Sections 22035 and 22050,to implement the Lower Walnut Creek Interim Protection Measures project, Pacheco area. FISCAL IMPACT: The total estimated contract cost is $8,500,000, funded by Flood Control Zone 3B Funds. CONTINUED ON ATTACHMENT: ❑D SIGNATURE: 4�. 12ECONIMENDATION OF COUNTY ADMINISTRATOR RECOMMENDA,riod OF BOARD CONINIITTEE APPROVE O'I.1-IER SIGNATUI1l_(S): ACTION OF BOARD ON 5f— a V APPROVED AS RE ; •1MFNDFD O'I'HEIZ VOTE OF SUPERVISORS: I HEREBY CERTIFY T'1IATTHIS IS A TRUE AND CORRECT COPY OF AN ACTION TAKEN AND ENTERED ON y UNANIMOUS(ABSEN 1' ) MINUTES OF THE BOARD OF SUPERVISORS ON THE AYE'S: NOES: DATE SHOWN. ABSENT: ABSTAIN: Conluet: GI"CL Connaughton(92i)31±-2'71 GC:I'D:ckv �9 mot GAFIdC11\Board Orders 2005 Omvard'`•2008 BO',.Lower Walnut Creek Emergency ATTESTI.:D 1,14 4 1 130 5-19-08.doc JOlii V ULLEN,CLERK OF THE BOARD OF SUPERVISORS CQ. County Adriinistrator Auditor--Controller Public Works: .lulu R. Bucren.Chicf Engineer BY: DEPUTY R.Mitch Avalon.Deputy Chicf Engineer Kevin Lmigh.Construction Greg Conn.wghton.Flood Control Paul Detjens.Flood Control SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10,2007, regarding the Lower Walnut Creek Interim Protection Measures project,Pacheco area. (Flood Control lone 313 Funds) (Districts II & IV) Project No. 7520-668345 DATE: August 19, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: A. On April 10; 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control facility as directed by the US Army Corps of Engineers. B. Repair status: The Contra Costa C ounty.Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective Action Plan and presented it to the US Army Corps of Engineers for consideration on June 11, 2007. A status report, including this Corrective Action Plan(CAP),was presented to the Transportation, Water and Inti-astRICture Committee on June 25, 2007. Project plans were prepared and the District contracted with Pacific States Environmental Consultants to Construct the first phase of the Lower Walnut Creek interim Protection Measures project. pursuant to the CAP. This first phase of the project was completed in early December 2007. i-iowcver, additional work is required to fully implement the CAP. The CAP is currently tinder review by US Army Corps of Engineers Headquarters. The full scope and schedule of the CAP will not be known until completion of the federal review. CONSEQUENCES OF NEGATIVE ACTION: Nonconcurrence with the above recommendation may significantly delay Implementation of the remaining CAP work in Lower Walnut Creek flood control facility and prevent the District from meeting the correction schedule required by the US Army Corps of Engineers.