HomeMy WebLinkAboutMINUTES - 07222008 - C.6 TO: BOARD OF SUPERVISORS .,.f�> , '_-�>-��•,
Contra
FROM: JULIA R. BUEREN, PUBLIC WORKS DIRECTOR COSta
DATE: July 22, 2008
ount
SUBJECT: Amendment to the Joint Exercise of Power Agreement with the City of the San Pablo
Darn Road Rehabilitation Project, El Sobrante Area. (100% City of Richmond Funds) (District.l)
Project No. 0662-6R4148
SPECIFIC REQUEST(S)OR RECOMMENDATIONS)S BACKGROUND AND JUSTIFICATION
RECOMMENDED ACTION:
APPROVE and AUTHORIZE the Chair, Board of Supervisors, to execute the amendment to tine Joint
Exercise of Power Agreement with the City of Richmond to increase the deposit amount by 522,253 from
$69,000 to tine new alnnount of 591,253 for the Sall Pablo Darn Road Rehabilitation Project, from July 22, 2008
through the completion of project, El Sobrante Area. (100% City of Richmond Funds) (District I) Project No.
0662-6R4148
FISCAL IMPACT:
There is no impact to the General Fund. The portion of the project within the City of Richmond is funded
entirely with City of Richmond funds. The portion of the project within Contra Costa County is to be funded by
Surface Transportation Program (STP), Measure C, and local road funds.
REASONS FOR RECOMMENDATIONS AND BACKGROUND:
Contra Costa County will design and place approximately 3.3 miles of bonded wearing course surface
treatment, striping, and construct/reconstruct curb ramps along San Pablo Dann Road. Within the 3.3 miles of
San Pablo Dam Road from El Portal Drive to Tri Lane, there are three sections of San Pablo Darn Road that are
under the City of Richmond's jurisdiction. The three sections areasal L ne and Leisure Lancs
CONTINUED ON ATTACHMENT: . ❑x SIGNATURE:
RECOMMENDATiON OF COUNTYADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON APPROVED REC.'OMMENDED ZO HER
VO"I OF SUPERVISORS: I HEREBY CERTIFY "KHAT THIS IS A TRUE AND
CORRECT COPY OF AN ACTION TAKEN AND ENTERED
UNANIMOUS(ABSENT // ) ON MINUTES OF 'THE BOARD OF SUPERVISORS ON
AYES: NOES: 'THE DATE SHOWN.
ABSENT: ABSTAIN:
Contact: Kara Schub 313-2308
KS:1r
G:\TransEng'-1008`�.BO-TE`•.BO 07'_'_'(18 JEPA Amendment San Pablo Dam Rd.docx ATTESTED do
cc: ORIGINAL SIGNED BOARD ORDER, RF,SOLUT1ON S
AGREEMENTS BACK TO PW/TE JO U N,CLERK OF THE BOARD O
M.Carlson.Transportation Engineering SU :RVI.. RS
C.tau.Transportation Engineering
K.Schuh,Transportation F..nginecring
B.Yip.Design
Finance BY:
Andy Young,City ol'Richmond DEPUTY
SUBJECT: Amendment to the Joint Exercise of Power Agreement with the City of Richmond for the San
Pablo Dam Road Rehabilitation Project, El Sobrantc Area. (100% City of Richmond Funds)
(District 1) Project No. 0662-6R4148
DATE: July 22, 2008
PAGE: 2 of 2
REASONS FOR RECOMMENDATIONS AND BACKGROUND (cont.):
Bristlecone Drive, and Castro Ranch Road. The City of Richmond has requested that Contra Costa County
include the City of Richmond's three sections within the 3.3 miles project limits. Work will be performed by
Contra Costa County maintenance crews and a contractor. Since approval of the Joint Exercise of Power
Agreement with the City of Richmond on April 3, 2007, a more detailed cost estimate for the project was
completed necessitating an amendment to the original agreement to account for the additional estimated costs.
The purpose of this agreement is to make such an amendment to the provisions for the apportionment of duties
and costs between Contra Costa County and the City of Richmond as set forth in the original Joint Exercise of
Power Agreement. Execution of this amendment to the Joint Exercise of Power Agreement will allow
construction to proceed and allow Contra Costa County to be reimbursed for the costs incurred.
County Counsel has reviewed this amelidment to the Joint Exercise of Power"Agreement and approved as to
forill.
The City of Richmond City Council approved this amendment to the Joint Exercise of Power Agreement in
their March 18, 2008 City Council Meeting. The Mayor, City Clerk, City Engineer, and City Attorney have
signed this agreement.
CONSEQUENCES OF NEGATIVE ACTION:
if the aureement is not approved, the sections ol'San Pablo Dam Road within City of Richmond's jurisdiction
will be left unimproved.
AMENDMENT No. 1
JOINT EXERCISE OF POWERS AGREEMENT
BETWEEN CONTRA COSTA COUNTY AND THE CITY OF RICHMOND
FOR SAN PABLO DAM ROAD REHABILITATION PROJECT
(Contra Costa County Project No. 0662-6R-4148)
This AMENDMENT, is entered into on the AZ day 0
2008, between the County of
Contra Costa, a political subdivision of the State of li rnia (hereinafter referred to as
COUNTY), and the City of Richmond, a municipal corporation duly organized and existing under
the laws of the State of California (hereinafter referred to as CITY), pursuant to Government
Code Section 6500 and following.
WHEREAS, CITY and COUNTY entered into a Joint Exercise of Powers Agreement,
hereinafter "AGREEMENT," on April 3, 2007, to define the responsibilities of CITY and
COUNTY for the portion of a San Pablo Dam Road surface treatment project located within
the CITY; and
WHEREAS, CITY and COUNTY now desire to amend said AGREEMENT in accordance
with the provisions of Section 8, "Agreement Modification," of said AGREEMENT.
NOW, THEREFORE, CITY and COUNTY hereto mutually agree as follows:
A. Section 1., "Purpose and Scope of Work.,"is amended in its entirety, to increase the
planning cost estimate to read:
1. Purpose and Scope of Work. COUNTY will design and place approximately 3.3
miles of surface treatment (bonded wearing course), striping on San Pablo Dam Road,
and curb ramps (the"PROJECT'). Within this 3.3 miles of San Pablo Dam Road from El
Portal Drive to Tri Lane, there are three sections of San Pablo Dam Road that are under
CITY's jurisdiction. The three sections are near Pleasant Lane and Leisure Lane,
Bristlecone Drive, and Castro Ranch Road. CITY has requested that COUNTY add to the
PROJECT these three sections (the"CITY WORK'), and COUNTY is agreeable to do so
on the terms and conditions set forth below. Work will be performed by Contra Costa
County maintenance crews and/or a COUNTY-hired contractor. The purpose of this
AGREEMENT is to provide for the apportionment of duties and costs between COUNTY
and CITY with respect to the CITY WORK. The CITY WORK requires preliminary
engineering, design, construction and construction engineering as outlined in the
Planning Cost Estimate(Exhibit"A-1'�. The estimated total CITY WORK cost is$91,253.
B. Paragraph A.(1) of Section 2., "Responsibilities of COUNTY and CITY.", is amended
in its entirety , to read:
(1) Pay COUNTY for all costs of CITY WORK, which includes the design,
construction engineering, contract administration, and inspection services
AMENDMENT NO. 1 -JOINT EXERCISE OF POWERS
AGREEMENT BETINEEN CONTRA COSTA COUNTY AND
CITY OF RICHMOND FOR SAN PABLO DAM ROAD
REHABILITATION PROJECT
provided by COUNTY for the CITY WORK. The CITY WORK is estimated to cost
$91,253, however the final cost for which the CITY is responsible to pay the
COUNTY will be determined by actual cost of the items in the Planning Cost
Estimate (Exhibit"A-1'D.
C. Section 3., "Financial Responsibility.," is amended in its entirety, to read: .
A. The CITY shall pay all costs of constructing the CITY WORK as outlined in
the Planning Cost Estimate (Exhibit"A-1'D, all costs of extra work requested
by the CITY, and a proportional share of .the cost of preliminary and
construction engineering performed by the COUNTY. The construction
area signs, traffic control system, and clearing and grubbing line items
will require a proportional split based on a 97% split to the COUNTY and
a 3% split to the CITY. This percentage is determined based on the
square footage of the PROJECT within each jurisdiction. The preliminary.
engineering and construction engineering line items will be based on 10%
of the actual contract subtotal.
B. CITY shall deposit with COUNTY $91,253 to cover the estimated costs of
preliminary engineering, design, construction, construction engineering,and
any other costs as a result of this project for the CITY WORK. CITY made a
deposit of $69,000 in June 2007.. Within thirty (30) days.of demand by
County, CITY will provide to COUNTY a check for$22,253. Should the CITY
fail to make this additional deposit on time, the CITY's Project shall be
deleted from the joint project, and, County may deduct from the previously
deposited amount its preliminary engineering expenses as specified in Exhibit
"A-1"and any other related COUNTY expenses accrued as of that date.
C. COUNTY shall invoice CITY for approved change orders affecting the CITY
WORK within thirty (30) days of incurring those costs. Payment owed to
COUNTY shall be made by CITY no later than forty (45) calendar days after
the actual billing by COUNTY.
D. Within one (1) week following bid opening, if CITY determines the lowest
responsible bid to be excessive, CITY may terminate this AGREEMENT. CITY
shall still be obligated to pay COUNTY for design engineering and any other
COUNTY costs associated with the elimination of WORK from the
construction contract. The CITY shall compensate the COUNTY for
preliminary engineering as specified in Exhibit"A-1" and any other related
COUNTY expenses accrued as of that date.
E. Within thirty (30) days .following the bid opening, if CITY determines the
lowest responsible bid to be acceptable, CITY does not terminate this
AGREEMENT within one (1) week following bid opening and the bid price is
AMENDMENT NO. I -JOINT EXERCISE OF POWERS
AGREEMENT BETWEEN CONTRA COSTA COUNTY AND
CITY OF RICHMOND FOR SAN PABLO DAM ROAD
REHABILITATION PROJECT
greater then the Engineer's Estimate in Exhibit A by 25% or more, the CITY
must provide COUNTY with a deposit equal to the difference between the
lowest bid price and the already deposited amount.
F.. The contractor awarded this PROJECT will be required to obtain a
business license from the CITY if the contractor is not in possession of a
business license from the CITY at the time the PROJECT is awarded. The
business.license must be provided to the contractor by the CITY at a cost
of $0 or the CITY must reimburse the COUNTY the cost of the business
license obtained by the contractor.
G. Within ninety (90) days of the last contract payment of the joint project,
the COUNTY shall deliver a report of project expenditures to the CITY
with a bill for the additional amount owed to the COUNTY if the costs of
the CITY's project exceed the deposit paid. Payment for the amount
owed to the COUNTY, if any, shall be made no later than forty-five (45)
days after the date of billing by the COUNTY. If the costs of the CITY's
project are less than the deposit paid, the excess shall be refunded to the
CITY within ninety (90) days of the last contract payment of the joint
payment.
BE IT FURTHER agreed that all other provisions of the AGREEMENT not specifically
amended herein shall remain in full force and in effect.
IN WITNESS WHEREOF,. CITY and COUNTY hereto execute this AMENDMENT the
day and year first above written.
3
AMENDMENT NO. 1 —JOINT EXERCISE OF POWERS
AGREEMENT BETWEEN CONTRA COSTA COUNTY AND
CITY OF RICHMOND FOR SAN PABLO DAM ROAD
REHABILITATION PROJECT
CONTRA COSTA COUNTY CITY OF RICHMOND
By By
_zw= �4—
Federal G ver, Chair, Board of Supervisors Gayle McLaugoin, Mayor
ATTEST: ?'�'
ATTEST:
John Cullen Diane Holmes
Clerk of the Board of Supervisors and County City Clerk
Administrator
By By
eputy derk. City Clerk
RECOMMENDED FOR APPROVAL: RECOMMENDED FOR APPROVAL:
roK � ��u Jwfia R. Buy.-u1 Richard Davidson
Public Works Director City Engineer
l � ,
By By
City Engineer
FORM APPROVED: FORM APPROVED:
Silvano B. Marchesi Louise Renne
County Counsel City Attorney
By By
qD City Attorney
3c:
G:\TransEng\Projects\San Pablo Dam Road Rehabilitation\JEPA Amendment#1 (2-25-08).doc
Revision—02/25/08
4
= G:tzr•�I'.s�sta..:C�uur•tYD
Cast.Estimate
Project SanPabla Dani Rop.d Rehabilitation Proj�:rt
Ft#�--nie: City of Richwood Costs Cost Estimate Date: 2/2512008. �
project
No.: 0662- 84148
C;n .f. .,..,.M. Bid Rem D(aqci o:::a3lilty �Ulli#. Amourt
C%e. # ocie 1 Ccs.t. (Jr, fiqu, �)
# 120(130 C.r)nstrucfio.n.Ai`ca Signs ALS 1 $4G2.#7£7 .$ .6?..[l0
— --
_ — -120 i X00 Tra Tic:Control S_t�st+;�rr� —_- LS 1 _ _';250;UC)
�3y 152324 Resti Roadsid.o Sign(ril.eta# post:) i EA. _ 1 S350.00A $350.00
•4 -160101 Clearing arid;G.rub bi nq '. L.S. 1 $60(1,005600.00
5 1531.03 Cold..Pttane Asphalt Concrete Pavement SY ... .747 $4.00 - 2,988,00
--•-- - -
6 390106.A Bonded—n-bring.Coursr: (3,18"Atlax.). TON. 1 2013 _ x$179,00 53.6,337.0£3
7Asphaltic Errru sign (Pol. Mer fslod+-find) - TON—I_.� 3 $650-GO S2,210.00
3 #TinG.r Concrete (Sidev�.alk) _ SF 1.G:0 $1510.0 $2,400;00
...................... -
(? lbeteZ ible Warninc; Surface (surfar-:e applied) EA - 1 960.00 $960,00
—� :— r -- —--\-----..........
d405fil IT�herme, )#antic traffic #ri 'e Detail .; t.F I,'J2�-- - X4.50 r4,5gg.00
1 # 184Cr5f;1✓;'Thern�oplasl.:ic T raffir,S#)'if)G-...{ ?C't3l#22). —LF 328 $4,00 5.1,31:::00.i
12805, 1:c Stri}ia C?c?laii 2?6} Lt= . 1,096 l $3:00: ;.3,288;0£).
'13 S--;D. �53A LF 1
Themrola!asti.c Traffic Stripe ( D tall )t>): 180. E
i _ - I .t).CJ _ ;300:00
i4 Therrnopla6tic Traffic Stripe, 12 White LF I 106 ;500
15 The uuiclplas:ic Rayement marking �.. SF 4-5 MOO s:z OM
1ti Detector Handhold :EA _ S200.00 $&00..00
,F 17 Sir#nals 7e: alor Loops EA 2'1 S350.0.C) $8,400.00
--- ---_-------- _ —-- _ —
ir)ii?•:::r: f'r;limioory Enaineorinn
l
Cornly Labor: C.cli;rip., Nbaiariais ` t},80.6 1131
C:onstrtrton Engineering at SrrLtc#al 584,38.7'
10 pelvLrlt of Comrac# Cost, 61811E C;c)r)#inl7enrius
City FLminess License, 2:000 (i0 pct of Rem') 6,85.51
! - - - —
I.Uic3l:Utl1( r L 1;3#g; 15:7`t 1 Tcr:�l: 5�1,Zu3