Loading...
HomeMy WebLinkAboutMINUTES - 07222008 - C.114 ................... TO: BOARD OF SUPERVISORS, AS GOVERNING Contra` -���, �`��:. BOARD OF THE FLOOD C.ONTROL.& WATER CONSERVATION DISTRICTo;i ,;`r ° ::y' :.° Costa FROM: JULIA R. BUEREN CHIEF ENGINEER County DATE: July 22,'2008 SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II & IV) Project No. 7520-6138345 SPI_CIFIC'REQUES"I_(S)OR RECOMMENDATION(S)&BAC-1<GROUND ANDJUSTIFICATION RECOMMENDED ACTION: DETERMINE that there is a need to continue the emergency action taken. by the Board of Supervisors on April 10,2007,pursuant to Public Contract Code Sections 22035 and 22050,to.implement the Lower Walnut Creek Interim ProtectionMeasures project, :Pacheco area. FISCAL IMPACT: ..The total estimated contract cost.i.s $8,500,0005 funded by Flood Control Zone 3B Funds. CONTINUED ON ATTACHMENT: D SIGNATURE: IZE(:OMNIIENI.)ATIONOF(:OI1NTY A1)MINISTR:%TOR REC(fMMENDATION = BOARD COV1111�� ' APPROVE OTHER SIGNATUREN: AC'T'ION OF BOARD ON _WJ ?? APPROVED AS RE 'C)MMENDE:D V O"T ER VOTEOF SUPERVISORS: I I-IERE13Y CERTIFY THAT TEIIS IS A"TRUE ANDCORRECT `� COPY OF AN A("PION. TAKEN AND. ENTERED ON V UNANIMOUS(ABSENT ) MINUTES OF THE BOARD Of: SUPERVISORS ON fl(E AYES: NOES: DATE SI IOWN. ABSENT: ABSTAIN: Contact: Greg Connaughton(925)313-2271 6:\F1dC'tl\Board Orders 2005 Onward\2008 BO\Lower Walnut Creel:Emergency BO ATTESTED 7-22-08Acc ,l(:)HN C I_LEN,CLERK OF THE BOARD OF SUPERVISORS cc: County Administrator Auditor---C0nt1'o11C1_ 4 Public Works:. .lulia R.BLICI-en,Chief maineer BY: DEPUTY R.Mitch Avalon.Deputy Chief Eng111eer Kevin Emigh,Construction Gres*C'onnaughton,Flood Control Paul Dr:tjcns,Fkuul Control SUBJECT: CONTINUE the emergency action originally taken by the Board of Supervisors on April 10, 2007, regarding the Lower. Walnut Creek Interim Protection Measures project, Pacheco area. (Flood Control Zone 3B Funds) (Districts II.& IV) Project No. 7520-6B8345 DATE: July 22, 2008 PAGE: 2 of 2 REASONS FOR RECOMMENDATIONS AND BACKGROUND: A. On April 10, 2007, the Board of Supervisors declared an emergency and authorized the Chief Engineer to proceed in the most expeditious manner to repair or replace the Lower Walnut Creek flood control,facility as directed by the US Army Corps of Engineers. B. Repair- status: The Contra Costa County Flood Control and Water Conservation District(District)prepared the Lower Walnut Creek Corrective Action.Plan and presented it to the US Anny Corps of Engineers for consideration on June 11., 2007. A status report,including this Corrective Action Plan.(CAP),was presented to the Transportation,Water and Infi=astructLire Committee on June 25,.2007. Project plans were prepared and the District contracted with Pacific States Environmental Consultants to construct the first phase of the Lower Walnut Creek Interim Protection Measures project pursuant to the CAP. This first phase of the project was completed in early .December 2007. However,additional work is required to frilly implement the CAP. The CAP is currently Under review by US Army Corps of Engineers.Headquarters. The frill scope and schedule of the CAP will not be known until completion of the federal review. . CONSEQUENCES OF NEGATIVE ACTION: Nonconcurrence with the above .recommendation may significantly delay implementation of the remaining CAP work in Lower Walnut Creek. flood control facility and prevent the District from meeting the correction schedule required by the US Army Corps of Engineers.